07/1815 - Preliminary building works assessable against planning scheme [As Published] · 172007.1815
INTEGRATED PLANNING ACT 1997
Contaminated land’
Applications involving material change of use
and? or reconfiguring.a lot may trigger this
feferal.
For more information refertoGuide'5. -
Unless you answered “none of the above” to
Q17, the application requires assessment by.the
Environmental Protection Agency: (EPA). fan
‘agency other than EPA‘ is’ ie assessment
manager. for.the a appli EPA will be a
¢ for:thé application in
‘elation to this matter.
17. The application involves: (tick the applicable box/es)
(reconfiguring a lot for which all of part of the premises are -
(a) premises mentioned in the IPA, schedule 8, part 1, table 2 -
« item 5, including the exemption otherwise provided for by paragraph (d);
« item 6, including the exemption otherwise provided for by paragraph (e); or
« item 7, including the exemption otherwise provided for a mining activity or petroleum
activity; or
(b)
ordnance - complete Part N of Form 1
Oi) a material change of use -
(a) ‘made assessable under the IPA, schedule 8, part 1, table 2, items 5 to 7; or
(b) assessable against the planning scheme and if all or part of the premises is in an area
. for which an area management advice has been given for unexploded ordnance -
complete Part N of Form 1
. wei none of the above
IDAS Assessment Checklist, Version 20; 2 April 2007
in an area for which an area management advice has been given for unexploded |
“Electricity frastrii
‘For more information referto. schedule ofthe P
Requiation.
Unless you ar answered jone of the ‘abovi
. The ‘appl
Ov
Di)
iii)
ication involves: (tick the applicable box/es)
reconfiguring a fot where any part of the lot is —
+ subject to an easement in favour of a distribution entity or transmission entity under the
’ Electricity Act 1994 and the easement is for a transmission grid or supply network under
that Act; or
« situated within 100m of a substation site;
a material change of use, assessable against a planning scheme and not associated
with reconfiguring a lot if -
* any part of the premises is subject to'an easement in favour of a'distribution entity or
_ transmission entity under the Electricity Act 1994 and the easement i is for a transmission
grid or supply network under that Act; and
any structure or work that is the natural and ordinary consequence of the use is, or wil be,
located wholly or partly in the easement;
a material change of use, assessable against a planning scheme and not associated
site;
with reconfiguring a tot if any part of the premises is situated within 100m of a substation
O (iv) operational work that is filling or excavation assessable against the planning scheme,
(v)
not associated with reconfiguring a lot, if —
any pant of the premises is subject to an easement in favour of a distribution entity or
transmission entity under the Electricity Act 1994 and the work is located wholly or partly in
the easement;
the work is located wholly or partly within 10m of a substation site;
none of the above.
Land designated for:community
infrastructure
Applications involving. development on land
designated for community infrastructure may .
trigger this referral,
For mora information refer to schedule 2 of the
IP Regulation.
Ifyou answered “YES"4o Q19, the application
fequires.assessment by the.chief.executive-of.”
the department administering. the Act: authorising |
the development for the.designated purpose.
if an agency other thanthe designator.is the °
- assessmerit manager for the application, .the
designating agency will be a concurrence
agency for the application it in-relation to 'this
matter. *
Does the application involve development assessable against the planning scheme and on land
designated for community infrastructure?
(i) intended to be supplied by a public sector entity; and
{ii) on land not owned by or on behalf of the State; and
(iii) other than development —
(a)
(b) carried out by, or oni behalf of, the designator.
Go .
Dyes
for the designated purpose; or
Page 6
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/1815 - Preliminary building works assessable against planning scheme [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.0 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.