07/1815 - Preliminary building works assessable against planning scheme [As Published] · 172007.1815
INTEGRATED PLANNING ACT 1997 . IDAS Assessment Checklist, Version 20, 2 April 2007
_ State-controlied.road matters :'|2) The application involves: (tick applicable bowes)
Far mere information seer o Guide 3 J (i) development on land contiguoust to a State controlled road and for -
Unless, yOu answered ‘none of thé: above" 0Q2,)
“the application triggers referral to the Deparment Oo {a} material change of use assessable against the planning scheme;
of Main Roads (DMR) as a referral agency.
(7 (b) reconfiguring a lot unless -
any wage nner e the total number of lots is not increased; and
be a concurrence ‘agency: « the total number of lots abutting the State-controlled road is not increased:
stom wil assist you 8 1 (c) operational work (not associated with a material change of use assessable against the
-concurrences agency for-the application. | planning scheme or reconfiguring a lot mentioned in (b) above)—
* associated with access to a State-controlled road; or
for filling or-excavation; or
« involving the redirection or intensification of site stormwater from the land, through a
pipe with a cross-sectional area greater than 625 cm? that directs stormwater to a
State-controlled road.
(1 (ii) development on land not contiguous to a State-controlled road and -
(a) material change of use - ,
« assessable against the local government's planning scheme; and
« mentioned in schedule 5 of the IP. Regulation and exceeding the thresholds set by
‘ that schedule;
~ (1 (b) reconfiguring a lot for a purpose mentioned in schedule 5 of the IP regulation r )
oy "and exceeding the thresholds set by that schedule;
[J (©) operational work (not associated with a material change of use assessable against the
planning scheme or reconfiguring a fot mentioned in (b) above)~
at ° « assessable against the focal government's planning scheme; and
* mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
. ‘ that schedule.
‘| ir) none of the above
- Clearing vegetation ot os va) 3. The application involves: (tick applicable box/es)
For mae information refer to Guide 12, CJ (i) . material change of use -
Unless you answered “rione of the above" to Q3,
the application requires assessment by the (a) assessable against the planning scheme;
‘Department of Natural Resources and.Water + -
wae ee {b) on alot containing
fan agency other than NRW is the agsessmient « acategory 1, 2 or 3 area shown ona property map of assessable vegetation; or
manager for the application, NRWis a * « if there is no property map of assessable vegetation. for the lot - remnant vegetation;
Ganaurtence agency for te application in retelion (c)_ where'the existing use of the land is a rural or environmental use; and.
to this matter.
Hlyousicked-03() or (i, your application ia (d) - where the size of the land is 2 hectares or larger - complete Part J of Form 1
referral to: NRW for assessmeit regardless of - Ci (ii) reconfiguring a fot -
whether-vegetation clearing is pfoposed.or not. | | . . .
: vee i (a) on alot containing a category 1, 2 or 3 area shown on a property map of
-assessable vegetation or, if there is no properly map of assessable vegetation for
the lot, remnant vegetation; :
(b) , where the size of the lot before the reconfiguration is 2 hectares or larger;
(c) where 2 or more lots are created; and
(4) where the size of any lot created is 25 hectares or smaller - compete Pert J of Form 1
C1 (iii) operational work. -
, (a) for the clearing of native vegetation where the vegetation clearing is made
assessable under Schedule 8 of the IPA; and
(b) not associated with a material change of use assessable against the planning
scheme mentioned in (i) or reconfiguring a lot mentioned in (ji) - complete Part J of
Form t
ww) none of the above.
Strategic portland 4. The application involves:
or more infomation refer Gude 11 (1 (i) development on strategic port land as defined in the Transport infrastructure Act 1994 (Tl
‘if you ticked (j) - the relevant Port Authority is the Act) - complete Part | of Form 1
assessment manager for.the application. . pe . : .
fyou ticked (i) Queensland Transport is a (1 (ii) a material. change of use that is inconsistent with the land use plan approved under the
concurrence agency for the.application. TI Act for the strategic port land - complete Part f of Fonn 1
wi none of the above
4 Land contiguous to a State-controtled road is defined in schedule 14 of the IP Regulation to mean land - if part of the land is within 100m of the State-contolled road; 0 or that is part of a future State-
controlled road.
Page 2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/1815 - Preliminary building works assessable against planning scheme [As Published]Related documentApplication case desk ↗