81.   Fees applicable to the above project are listed.
          Plan Examination                           $ 930.00
          Inspection Fee                             $ 810.00
          Checking as-constructed data               $ 130.00
          CCTV fee                                   $ 50.00
          Live sewer inspection                      $ 155.00
          BALANCE OWING                              $ NIL PAID 08/01/08                   RN 356475

Environmental Health
82.   Where the development involves the removal, relocation or demolition of a building, a Waste
      Management Plan (construction and demolition) shall be submitted prior to demolition,
      removal or relocation of any building other than a shed.
      Waste Management Plans (construction and demolition) are required to be submitted in
      accordance with Planning Scheme Policy 11, Waste Management Plans see table below.
      Waste storage areas are to provide for adequate separation of all reusable, recyclable and
      waste materials. These shall be located so that they are convenient and safe to use. (Refer to
      Sunshine Coast Regional Council Waste Management Code)
      The Plan shall contain the following information:
      The site area for the storage and separation of waste is to be shown on the plan drawings
      accompanying the application.
      A waste management table as indicated below is to be completed showing how waste material
      is to be segregated - recycled – reused or disposed.
 MATERIALS ON-SITE                       DESTINATION
                                         Re-use and Recycling                                Disposal
 Expected waste           Estimated      On-site                    Off-site                 *specify
 materials                volume(m³)     *specify proposed re-      *specify contractor      contractor and
                                         use or on-site recycling   and recycling outlet     landfill site or other
                                         methods                                             disposal site
 Excavation material
 Green waste
 Bricks
 Concrete
 Timber - please
 specify
 Plasterboard
 Metals - please
 specify
 Asbestos
 Other - please specify

Note * If a demolition contractor is undertaking works, then the Waste Management table is to be
completed by the demolition contractor.

The purpose of the Waste Management Plan is to facilitate the segregation of waste for the effective
reuse and recycling of such materials. Additionally Council rewards those who segregate waste by
significantly reducing disposal fees at the landfill some items are free. Higher gate fees are charged for
loads of mixed waste.




                                                                                                   Page 10 of 16

Used in these records

About this file

File size
88 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_2555 DECISION NOTICE - Change to Approval [As Published].pdf · 88 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.