Skip to the record
NoosaWatch™: The source of truth.

Original source · versioned page text

1856-R30_R70

of 41

Page text shows just the words. Original shows the document exactly as it was published.

Very large file (11.7 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 2, section 1. The text section number identifies this passage in the reader.

     GENERAL NOTES                                                                                               EARTHWORKS AND PAVEMENT                                                                                                                                                                          ROADWORKS NOTES
     GN1.        ALL DIMENSIONS AND SET OUT POINTS ARE TO THE KERB LINE OF THE                                   CONSTRUCTION NOTES CONTINUED                                                                                 SEDIMENT & EROSION CONTROL                                                          RD1.    THE CONTRACTOR SHALL ESTABLISH THE LOCATION, LINE & LEVEL OF ALL PUBLIC
                 SPECIFIED KERB TYPE. REFER LOCAL AUTHORITIES STANDARD DRAWINGS FOR
                                                                                                                 EW6.        ALL FILLING SHALL BE CLEAN EXCAVATED MATERIAL FREE FROM TOPSOIL
                                                                                                                                                                                                                              NOTES                                                                                       & PRIVATE UTILITY SERVICES PRIOR TO COMMENCEMENT OF ANY CONSTRUCTION.
                 KERB TYPE DETAILS.                                                                                                                                                                                                                                                                                       WHERE UTILITY SERVICES ARE SHOWN ON THE PLANS, THEY ARE SHOWN FOR
                                                                                                                             AND VEGETATION.
                                                                                                                                                                                                                              SE1.   GENERAL:                                                                             THE INFORMATION OF THE CONTRACTOR ONLY. THE PRINCIPAL SHALL NOT BE
     GN2.        FINAL LOCATIONS OF CONDUITS SHALL BE PROVIDED WHEN AVAILABLE FROM                                                                                                                                                       a. TEMPORARY DRAINAGE CONTROL. FLOW SHOULD BE                                    LIABLE FOR ANY OMISSION OF SERVICES FROM THE PLANS OR THE ACCURACY OF
                                                                                                                 EW7.        THE EXISTING SITE WON MATERIALS MAY CONTAIN ROCKS AND COBBLES
                 SERVICE AUTHORITIES. (IF REQUIRED).                                                                                                                                                                                          DIVERTED AROUND THE WORK SITE WHERE POSSIBLE.                               ANY SERVICES SHOWN ON THE PLANS.
                                                                                                                             AND THESE SHALL BE EXCLUDED OVER 100mm NOMINAL SIZE IN ANY
                                                                                                                             EXISTING MATERIAL USED AS FILLING.                                                                          b.   ALL DRAINAGE, EROSION AND SEDIMENT CONTROLS TO BE
     GN3.        ALL CONSTRUCTION SHALL JOIN SMOOTHLY TO EXISTING.                                                                                                                                                                            INSTALLED AND BE OPERATIONAL BEFORE COMMENCING                      RD2.    SURFACE LEVELS OVER THE SITE HAVE BEEN INTERPOLATED THROUGH
                                                                                                                                                                                                                                              UP-SLOPE EARTHWORKS.                                                        COMPUTER MODELING OF FIELD SURVEY DATA. THESE CALCULATED LEVELS MAY
     GN4.        NOTIFY ALL RELEVANT AUTHORITIES PRIOR TO COMMENCEMENT OF WORK                                   EW8.        ANY IMPORTED FILLING MATERIAL REQUIRED TO MAKE UP SHORTFALLS IN
                                                                                                                                                                                                                                         c.   ALL SEDIMENT & EROSION CONTROL DEVICES MUST BE                              VARY FROM THE ACTUAL GROUND LEVEL.
                                                                                                                             QUANTITIES SHALL BE CLEAN SOIL MATERIAL FREE FROM TOPSOIL,
                 WITHIN EXISTING ROAD RESERVES.                                                                                                                                                                                               REGULARLY INSPECTED AND MAINTAINED BY THE
                                                                                                                             VEGETABLE MATTER AND OTHER DELETERIOUS MATERIAL. THE FILLING
                                                                                                                                                                                                                                              CONTRACTOR. INSPECTIONS SHOULD OCCUR ON A WEEKLY                    RD3.    ALL CONSTRUCTION LEVELS SHALL BE SET BY THE CONTRACTOR WITH
     GN5.        THE CONTRACTOR SHALL CONTACT ALL RELEVANT SERVICE AUTHORITIES FOR                                           SHALL BE FREE FROM COBBLES OR ROCKS IN EXCESS OF 100mm NOMINAL
                                                                                                                                                                                                                                              BASIS (MINIMUM), ALONG WITH BEFORE AND AFTER                                REFERENCE TO SURVEYED BENCH MARKS PROVIDED BY THE PRINCIPAL'S
                 DETAILED LOCATION AND LEVEL OF SERVICES PRIOR TO COMMENCEMENT OF                                            SIZE. THE MATERIAL SHALL HAVE A MINIMUM SOAKED CBR 15 UNLESS
                                                                                                                                                                                                                                              SIGNIFICANT RUNOFF PRODUCING STORMS.                                        APPOINTED SURVEYOR.
                 WORKS AND THE SITE. ANY DAMAGE TO EXISTING SERVICES SHALL BE                                                OTHERWISE APPROVED BY THE SUPERINTENDENT.
                                                                                                                                                                                                                                         d. ALL DISTURBED LAND MUST BE RENDERED EROSION-PROOF
                 RECTIFIED AT THE CONTRACTORS EXPENSE.                                                                                                                                                                                        BY THE ESTABLISHMENT OF 80% EFFECTIVE GROUND                        RD4.    SUBGRADE EVALUATION IS TO BE UNDERTAKEN IN ACCORDANCE WITH THE
                                                                                                                 EW9.        ALL FILLING SHALL BE PLACED IN MAXIMUM 200mm LOOSE LAYER
                                                                                                                                                                                                                                              COVER WITHIN 28 DAYS OF FINAL EARTHWORKS TRIM.                              PROCEDURES OUTLINED IN ARRB SR41 - A STRUCTURAL DESIGN GUIDE FOR
     GN6.        ALL WORK SHALL CONFORM WITH THE RELEVANT LOCAL AUTHORITY'S                                                  THICKNESS WITH EACH LAYER COMPACTED TO AT LEAST 98% COMPACTING
                                                                                                                                                                                                                                         e. IN AREAS WHERE RUNOFF TURBIDITY IS TO BE                                      FLEXIBLE RESIDENTIAL STREET PAVEMENTS.
                 SPECIFICATIONS AND REQUIREMENTS.                                                                            AS MEASURED BY THE STANDARD METHOD DESCRIBED IN AS 1289.
                                                                                                                                                                                                                                              CONTROLLED, EXPOSED SURFACES TO BE EITHER
                                                                                                                                                                                                                                              MULCHED, COVERED WITH EROSION CONTROL BLANKETS                      RD5.    ALL KERBING SHALL CONFORM TO LOCAL AUTHORITY COUNCIL'S RELEVANT
                                                                                                                 EW10.       REFER TO THE GEOTECHNICAL REPORT REGARDING REMOVAL AND
     CLEARING OF VEGETATION                                                                                                  REPLACEMENT OF EXISTING FILLING MATERIAL. THIS NOTE SHALL APPLY TO                                               OR TURFED IF EARTHWORKS ARE EXPECTED TO BE                                  STANDARD DRAWINGS.
                                                                                                                             THE SUBGRADE UNDER ALL ROADS, DRIVEWAYS AND FILL BATTERS.                                                        DELAYED FOR MORE THAN 14 DAYS.
     VE1.        NO CLEARING SHALL BE CARRIED OUT BEYOND THE EXTENT                                                                                                                                                                      f.   STRAW BALE SEDIMENT TRAPS ARE A SECONDARY OPTION                    RD6.    ALL ROADSIDE VERGE AREAS AND BATTERS SHALL BE TOP S OILED TO A
                                                                                                                             FOLLOWING THE SITE STRIP AND DRIVEWAY SET OUT THE ENGINEER SHALL                                                                                                                             MINIMUM DEPTH OF 100mm (LIGHTLY COMPACTED) AND TURFED.
                 OF EARTHWORKS OR WHERE NECESSARY FOR SERVICES                                                               BE CALLED TO SITE TO DETERMINE THE PRESENCE OF ANY EXISTING FILL                                                 WHICH GENERALLY SHOULD NOT BE USED IF OTHER
                 CONSTRUCTION WITHOUT THE WRITTEN APPROVAL OF THE                                                            UNDER DRIVEWAYS AND ASSOCIATED BATTERS. PROVIDE A BACKHOE FOR                                                    OPTIONS ARE AVAILABLE.
                 SUPERINTENDENT.                                                                                                                                                                                                                                                                                  RD7.    PAVEMENT MARKINGS AND SIGNS SHALL BE PROVIDED IN ACCORDANCE WITH THE
                                                                                                                             THE TEST PIT EXPLORATION. THE ENGINEER MAY DIRECT EXISTING LOOSE                                                                                                                             QUEENSLAND MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES.
                                                                                                                             FILL TO BE REMOVED AND RE-COMPACTED.                                                             SE2.   SEDIMENT CONTROL FENCE:
     VE2.        MILLABLE LOGS ARE TO BE REMOVED FOR SAWMILLING.                                                                                                                                                                         g. NOT TO BE LOCATED IN AREAS OF CONCENTRATED FLOW.
                                                                                                                                                                                                                                         h. NORMALLY LOCATED ALONG THE CONTOUR WITH A                             RD8.    PROVIDE TELSTRA AND ENERGEX CONDUITS UNDER CONCRETE DRIVE-WAYS,
                                                                                                                 EW11.       ALL DRAINAGE, EROSION AND SEDIMENT CONTROLS TO BE INSTALLED AND                                                                                                                              WHERE DIRECTED.
     VE3.        SUITABLE MATERIAL IS TO BE MULCHED FOR REUSE ON SITE.                                                       FULLY OPERATIONAL BEFORE COMMENCING UP-SLOPE EARTHWORKS.                                                        MAXIMUM CATCHMENT AREA 0.6 HA PER 100M LENGTH OF
                                                                                                                                                                                                                                             FENCE.
     EARTHWORKS AND PAVEMENT                                                                                     EW12.       ALL EXISTING UNDERGROUND SERVICES TO BE LOCATED AND MARKED                                                  i.  WOVEN FABRICS ARE PREFERRED, NON-WOVEN FABRICS
                                                                                                                                                                                                                                                                                                                  DRAINAGE NOTES
                                                                                                                             PRIOR TO COMMENCING EARTHWORKS.                                                                                 MAY BE USED ON SMALL WORK SITES, I.E. OPERATIONAL
     CONSTRUCTION NOTES                                                                                                                                                                                                                      PERIOD LESS THAN 6 MONTHS OR ON SITES WHERE                          DN1.    1.5m WIDE EASEMENTS SHALL BE CREATED OVER ALL INTER-ALLOTMENT
                                                                                                                 EW13.       FILL DENSITY TESTING SHALL CONFORM TO THE FOLLOWING:                                                            SIGNIFICANT SEDIMENT RUNOFF IS NOT EXPECTED.                                 DRAINAGE LINES UNO.
     EW1.        THE CONTRACTOR SHALL PROVIDE CERTIFICATION FROM A RPEQ QUALIFIED                                                  a. 1 TEST PER 500 cu.m - GENERALLY                                                                    j.  WHERE FENCES NEED TO BE LOCATED ACROSS THE
                 ENGINEER THAT THE WHOLE OF THE EARTHWORKS AND GEOTECHNICAL                                                       b. 1 TEST PER 2 LAYERS PER 40m - TRENCH BACKFILL                                                           CONTOUR - REFER IPEAW STANDARD DRAWING D-0040 FOR                    DN2.    PIPE BEDDING AND BACKFILL ARE IN ACCORDANCE WITH LOCAL AUTHORITIES
                 SUPERVISION COMPLIES WITH AS3798 FOR                                                                                                                                                                                        DETAILS.                                                                     REFERENCED SPECIFICATION AND/OR STANDARD DRAWINGS.
                                                                                                                 EW14.       PLACEMENT OF FILL SHALL CONFORM TO THE FOLLOWING MINIMUM DRY                                                k. FENCES ARE REQUIRED 2m MIN FROM TOE OF CUT OR FILL
     EW2.        THE CONTRACTOR SHALL REFER TO GEOTECHNICAL INVESTIGATION                                                    DENSITY RATIO (M.D.D.R.) COMPACTION STANDARDS:                                                                  BATTERS, WHERE NOT PRACTICAL ONE FENCE CAN BE AT                     DN3.    PIPE MATERIALS ARE UPVC SEWER PIPE MINIMUM CLASS SN4; UPVC DRAINAGE
                 REPORT - (IF AVAILABLE)                                                                                         c.   ALLOTMENTS = 98% STD                                                                                   THE TOE WITH A SECOND FENCE 1M MIN AWAY. FENCE                               PIPE PLASCOR OR EQUIVALENT OF EQUIVALENT CLASS TO UPVC SEWER CLASS
     EW3.        ALL EXISTING UNDERGROUND SERVICES TO BE LOCATED AND MARKED PRIOR                                                d. ROAD VERGES/EMBANKMENTS = 98% STD                                                                        SHOULD NOT BE LOCATED PARALLEL WITH TOE IF                                   SN4; R.C.P. CLASS "2" RUBBER RING JOINTED OR F.R.C. PIPE CLASS "X" RUBBER
                 TO COMMENCING EARTHWORKS.                                                                                       e. PAVEMENT SUBGRADE = 100% STD FOR NON-COHESIVE                                                            CONCENTRATION OF FLOW WILL OCCUR BEHIND THE FENCE.                           RING JOINTED.
                                                                                                                                      MATERIALS, M.D.D.R. = 80%
     EW4.        THE LIMITS OF CUTTING AND FILLING SHALL BE GENERALLY AS SHOWN ON THE                                                                                                                                         SE3.   TEMPORARY CONSTRUCTION ENTRY/EXIT SEDIMENT TRAP:                             DN4.    UPVC PIPES ARE EITHER RUBBER RING JOINTED OR SOLVENT WELD JOINTED.
                 DRAWINGS. THE CONTRACTOR SHALL SET OUT THESE LIMITS FOR INSPECTION                              EW15.       ALL ALLOTMENTS OR AREAS SUBJECT TO EARTHWORKS ARE TO BE FREE                                                l. ADJACENT STORMWATER RUNOFF TO BE DIVERTED AWAY                                STANDARD MANUFACTURER'S FITTINGS ARE USED IN BOTH CASES.
                 BY THE ENGINEER PRIOR TO CONSTRUCTION. AMENDMENTS TO EARTHWORKS                                             DRAINING WITH A MINIMUM SLOPE OF 1:100.                                                                        FROM ENTRY/EXIT.
                 AND FINISHED SURFACE CONTOURS MAY BE ADJUSTED BY THE WRITTEN                                                                                                                                                            m. WHEEL - WASH OR SPRAY UNIT MAY BE REQUIRED DURING                     DN5.    FRC AND RCP SYSTEMS ARE CONSTRUCTED BY EMBEDDING THE LOWER PRECAST
                 DIRECTION OF THE ENGINEER DURING CONSTRUCTION.                                                  EW16.       ALL EXISTING GRASSED AREAS DISTURBED DURING CONSTRUCTION SHALL                                                 WET WEATHER.                                                                  SECTION INTO A WET CAST-INSITU CONCRETE BASE. CUT OUTS FOR PIPE
                                                                                                                             BE TOP SOILED TO A MINIMUM DEPTH OF 100mm AND TURFED OR SEEDED                                                                                                                               PENETRATIONS ARE MADE USING CONCRETE SAWS/DRILLS WHILE MINIMIZING
     EW5.        SITE PREPARATION:                                                                                           WITH A MINIMUM STRIKE RATE OF 80% PRIOR TO ANY 'ON MAINTENANCE'                                  SE4.   SAFETY ISSUES MUST BE CONSIDERED AT ALL TIMES, INCORPORATE                           DAMAGE TO THE ADJACENT PIPE MATERIALS.
                 a. STRIP TOPSOIL MIN 150 OR MORE AS REQUIRED TO REMOVE ALL                                                  INSPECTION.                                                                                             TRAFFIC CONTROL DEVICES .
                      VEGETABLE MATTER TO THE BASE OF THE SUB GRADE.                                                                                                                                                                                                                                              DN6.    LIDS TO CAST-IN-SITU MANHOLES ARE LIGHT DUTY, CLOSE FITTING BOLT DOWN
                                                                                                                 EW17.       ALL TEMPORARY STOCKPILES (IF APPLICABLE) TO HAVE 1:6 MAXIMUM SIDE                                SE5.   IT IS THE CONTRACTOR'S RESPONSIBILITY TO ENSURE THAT ALL                             CAST IRON OR GALVANISED STEEL, CONCRETE INFILL TYPE (GATIC LIGHT DUTY,
                 b.    FURTHER EXCAVATE IF REQUIRED TO BOX OUT TO MINIMUM PAVEMENT                                           BATTERS (GRASS SEEDED).                                                                                 SEDIMENT AND EROSION CONTROL MEASURES HAVE BEEN                                      POLYCRETE BROADSTEL OR SIMILAR) OF APPROXIMATELY THE SAME INTERNAL
                       THICKNESS. REMOVE AND RE-COMPACT FILL AS PER GEOTECHNICAL                                                                                                                                                     ADDRESSED AS STIPULATED IN THE ENVIRONMENTAL MANAGEMENT                              DIMENSIONS AS THE MANHOLE.
                       REPORT NOTE ON THIS DRAWING.                                                                     SEDIMENT & EROSION CONTROL PROGRAM                                                                           PLAN. ADDITIONAL OR DIFFERENT SEDIMENT & EROSION CONTROL
                                                                                                                             OBJECTIVE/TARGET                    THE CONTRACTOR MUST COMPLY WITH ALL STATUTORY                       DEVICES MAY BE REQUIRED DURING CONSTRUCTION PHASE TO                         DN7.    ALL STEEL GRATES AND FRAMES TO BE HOT DIPPED GALVANIZED AND SHALL BE
                                                                                                                                                                 REGULATIONS AND MAINTAIN THEM DURING EARTHWORKS/                    COMPLY WITH THE ABOVE.
                 c.    COMPACT SUBGRADE TO A MIN RELATIVE DENSITY RATIO OF 98%                                                                                   CONSTRUCTION. ALL PROVISIONS AND SPECIFICATIONS                                                                                                          CYCLE PROOF IN ACCORDANCE WITH AS 3996.
                       STANDARD COMPACTION AS DEFINED IN AS 1289 IN THE TOP 200.                                                                                 OUTLINED WITH THE APPROVED ENVIRONMENTAL
                                                                                                                                                                 MANAGEMENT PLAN MUST BE ADHERED TO, ALONG WITH               SE6.   TEMPORARY STOCKPILES TO HAVE 1:6 SIDE BATTERS (MAXIMUM) AND
                                                                                                                                                                 ALL EROSION AND SEDIMENT CONTROL MEASURES                                                                                                        DN8.    LIDS MATCH FINISHED SURFACE GROUND SLOPE AND SIT PROUD AS SHOWN ON
                 d.    COMPACT AND PROOF ROLL ALL PREPARED SUBGRADE AREAS PRIOR TO                                                                               PRESCRIBED WITHIN THESE DRAWINGS BY THE                             BE SHAPED TO ENSURE RUN-OFF IS TREATED AND MANAGED TO THE                            THE LOCAL AUTHORITIES STANDARD AND ARE MARKED "STORMWATER"
                       PLACING ANY FILLING. COMPACTION SHALL BE 100% COMPACTION AS                                                                               SITE ENGINEER                                                       SATISFACTION OF THE SUPERINTENDENT. ALL EXPOSED STOCKPILE                            IMPRESSED INTO THE CONCRETE INFILL. INFILL CONCRETE IS CLASS N25.
                       MEASURED BY THE STANDARD METHOD DESCRIBED IN AS1289 UNO.                                              MANAGEMENT                          THE SITE FOREMAN IS TO IDENTIFY AND CHECK THE                       SURFACES TO BE GRASS SEEDED. SEDIMENT FENCES AND CUT-OFF
                                                                                                                             STRATEGY                            DIRECTION OF STORMWATER FLOWS AS SHOWN ON PLAN.                     DRAINS MAY BE REQUIRED.                                                      DN09.   UPVC PIPE AND KERB ADAPTORS ARE USED WHERE DISCHARGE IS INTO THE KERB
                                                                                                                                                                 PROVIDE BARRIERS AND OTHER MEASURES SHOWN ON
                 e.   EXCAVATE AND REPLACE WITH STRUCTURAL FILL ANY SOFT SPOTS OR                                                                                PLAN TO PREVENT STORMWATER FLOWS OVER                                                                                                                    AND CHANNEL.
                      HEAVING SUBGRADE AREAS. STRUCTURAL FILL SHALL BE APPROVED                                                                                  EMBANKMENTS, AND SEDIMENT INTO GULLY PITS
                      GRANULAR FILL (100mm MAXIMUM PARTICLE SIZE, MINIMUM SOAKED CBR                                                                                                                                                                                                                              DN10.   INTER-ALLOTMENT DRAINAGE LINES ARE LOCATED 0.5 METRES FROM REAR OR
                                                                                                                             TASKS / ACTIONS                     ERECT SEDIMENTATION BARRIERS AS DETAILED.
                      15 PLACED IN LAYERS NOT EXCEEDING 200mm AND COMPACTED TO                                                                                   STRATEGICALLY PLACE CHECK DAMS                                      NOTE:                                                                                SIDE BOUNDARIES WITHIN THE PROPERTIES SERVED.
                      ACHIEVE NOT LESS THAN 98 % MAXIMUM RELATIVE DRY DENSITY                                                                                    AROUND GULLY PITS
                                                                                                                                                                                                                                     EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE DESIGNED
                      (STANDARD), OR 75 % DRY DENSITY INDEX IN ACCORDANCE WITH AS 1289.                                      PERFORMANCE                         THE SITE FOREMAN IS TO CHECK FOR EROSION AND                        AND PROVIDED IN ACCORDANCE WITH THE INTERNATIONAL EROSION                    DN11.   MATERIALS AND CONSTRUCTION ARE IN ACCORDANCE WITH COUNCIL'S
                      SITE FILLING MATERIAL AND COMPACTION UNDER THE PAVING AND                                              INDICATORS                          SEDIMENT FLOWS AT THE BASE OF EMBANKMENTS AFTER
                                                                                                                                                                                                                                     CONTROL ASSOCIATION (AUSTRALASIA) 2018's "BEST PRACTICE                              STANDARD SPECIFICATION FOR STORMWATER DRAINAGE.
                                                                                                                                                                 SIGNIFICANT RAINFALL AND SHOULD ASCERTAIN THE
                      BUILDING SHALL BE AS ABOVE.                                                                                                                WORKING EFFECTIVENESS OF CHECK DAMS DURING                          EROSION AND SEDIMENT CONTROL FOR BUILDING AND
                                                                                                                                                                 THIS WET WEATHER                                                    CONSTRUCTION SITE.                                                           DN12.   THE CONTRACTOR SHALL CONFIRM ALL LEVELS BEFORE COMMENCING WORK.
      UNDERGROUND SERVICES                                                                                                   FREQUENCY /                         SITE FOREMAN TO MONITOR PERFORMANCE AFTER
                                                                                                                             DEADLINE                            EVERY HEAVY DOWNFALL                                                                                                                             DN13.   THE CONTRACTOR SHALL CONTACT ALL RELEVANT AUTHORITIES AND LOCATE
      UNDERGROUND SERVICES HAVE BEEN LOCATED ONLY WHERE OBVIOUS. SOME SERVICES                                                                                                                                                                                                                                            ALL SERVICES BEFORE COMMENCING WORK.THE CONTRACTOR SHALL BE
                                                                                                                             RESPONSIBILITY                      THE SITE FOREMAN IS RESPONSIBLE FOR ALL INSPECTIONS
      THAT WERE NOT OBVIOUS AND ARE NOT SHOWN ON THE PLAN MAY STILL BE PRESENT. IT                                                                                                                                                                                                                                        RESPONSIBLE FOR ANY DAMAGE CAUSED TO SERVICES BY THE WORKS
      IS THE RESPONSIBILITY OF ANY PERSON EXCAVATING / BUILDING, ON OR ADJACENT TO                                           REPORTING REVIEW                    SITE WORKMEN ARE TO ADVISE THE FOREMAN IF ANY                                                                                                            IRRESPECTIVE OF WHETHER THE SERVICES ARE SHOWN ON THE DRAWINGS OR
      THE SITE TO CONFIRM WITH THE RELEVANT AUTHORITY THE LOCATION OF SERVICES.                                                                                  SEDIMENT & EROSION CONTROL DEVICES ARE FAILING
                                                                                                                                                                                                                                                                                                                          NOT.
      THE AUTHOR OF THIS PLAN ACCEPTS NO RESPONSIBILITY FOR DAMAGE TO SERVICES                                               CORRECTIVE ACTIONS                  THE SITE FOREMAN IS TO REPORT AND ORDER THROUGH
      SHOWN OR NOT SHOWN ON THIS PLAN.                                                                                                                           SUPERVISOR, EXTRA BARRIER OR CHECK DAMS AS
                                                                                                                                                                 REQUIRED

                                                                                                                                                                                                                                                                                                 PROJECT:                                                                             JOB NUMBER
REV DATE DESCRIPTION                                                   BY   CHKD DRAWN
                                                                                     I GDETAL
                                                                                            IS                                            SCALE                                                       APPROVED                                                                                   PROPOSED SUBDIVISION                                                                     1856
 A    19-02-20   FOR APPROVAL                                          MM    CL                                                                                                                                                                                                                  AT NOOSA CIVIC, WALTER HAY DRIVE
 B    25-08-20   REVISED FOR APPROVAL - WALTER HAY DRIVE TURN AROUND   MM    CL   DATUM           AHD                                                                                                                                                                                                                                                                            SHEET:    2   OF   42
                                                                                                             0             1.0            2.0             3.0            4.0              5.0m
                                                                                                                                                                                                                                                                                                 FOR STOCKWELL PTY LTD
                                                                                  DESIGN         MM                                                                                                  .................                                                                                                                                                           DRAWING NUMBER       REV
                                                                                                                                                                                                                                                                                                 DRAWING TITLE:
                                                                                  DRAWN          MM                                                                                              Director: CAMERON LANDRETH
                                                                                                                                        SCALE 1:100 A3
                                                                                  DESIGN CHECK                                                                                                         (RPEQ 19358)                   p 07 5443 8285                                             GENERAL NOTES                                                                        R31                B
                                                                                                  CL
                                                                                                            This drawing is not to be copied or amended without written permission from                                               e [email protected] w www.barlowshelley.com.au
                                                                                  DATE           13-09-19   Barlow Shelley Consulting Engineers                                                                                       a PO Box 899, Maroochydore,4558 ABN 89 215 591 077
Log in to download the original file

1856-R30_R70.pdf · 11.7 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.