Original source · versioned page text
1856-R30_R70
Very large file (11.7 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Original PDF page 6, section 1. The text section number identifies this passage in the reader.
JOINS PLAN 1856-R37
100
CH
LEGEND - NEW WORKS EXTENT
SM4
PROVIDE MULCH CH80 NEW FOOTPATH PRAM CH0
CH20
CH40
CH80
027
TO 1:2 BATTER TO IPWEAQ RS-090
CH60
HOF
98.
CH MAN
2m
PROPOSED AC SEAL 220
CH
LOT 15 ND
RIVE
80
4172m² B1 KERB
CH
PROPOSED CONCRETE DRIVEWAY
TO IPWEAQ RS-051 REFER 1856-R34 FOR TYPES 9 <1.5% CH2
2m
CH100 .4
6
0
5m
4
60
FL
4.7
11 1
<2.5%
CH
<1.5%
3. 4.1
B1
CH200 RO
FL
PROPOSED AC DRIVEWAY KE
AD RB
S
N
A
40
B1
CH
2m
KE
PROPOSED CONCRETE FOOTPATH CH40 RB
CH120
6m
20
80 LOT 16
CH
PROPOSED CONCRETE ISLAND CH1
LOT 14 4443m²
4005m² BREAK UP EXISTING AC
CH SEAL, BARRIER KERB (B1
0
PROPOSED TURFING 60
CH
04
140 TYPE) & FOOTPATH TO TIP
4.
CH 0
FL
16
CH
PROPOSED VEGETATION AREA
m
%
10
.5
CH
<1
34 3
LOT 10
80
2. .6
140
60
S 3
PROPOSED BIO-RETENTION BASIN 1 4
N FL
CH 1: 4733m²
CH
5%
<
2m
BASIN 1.
CH10
0.
B
ROAD
CH120
<
75
B1
%
KER
0
PROVIDE MULCH B
PROPOSED TREE PIT TO 1:2 BATTER
00
4.
0
18
FL
B1 KERB CH % FOR NEW STORMWATER
PROPOSED BARRIER KERB (B1 TYPE) .5
80 7
<2 WORKS REFER TO
5. .1
450mm CHANNEL [ROAD EDGE]
S 6
STORMWATER DRAWINGS 'SW'
N FL
LOT 13 1:4
1:
4
1.
1.5%
SM4 KERB 4117m²
5%
PROPOSED SEMI MOUNTABLE KERB 6
1.5%
.5
>
TYPE (SM4) 160mm FACE [TRAFFIC ISLAND] 3 0 PROVIDE MULCH
20
63
FL
>
CH
1.5%>
1.5%>
2.
TO 1:2 BATTER
>
LOT 11
S
LOT 12
N
PROPOSED EARTHWORKING
SLOPE 7972m² 4999m²
98 1
5
3. .4
.4
FOR NEW EARTHWORKS OVER
S 5
4
N FL
FL
0
LOTS 10 TO 16 REFER TO
22
PROPOSED SWALE DRAIN
CH
38
PLANS 1856-EW01 TO EW09
CH240
4.
2.5%
FL
PROPOSED STORMWATER FOR NEW EARTHWORKS OVER
CH260
CONNECT EXISTING FOOTPATH TO
DRAINAGE LOTS 10 TO 16 REFER TO
>
NEW FOOTPATH WITH DOWELL JOINT
PLANS 1856-EW01 TO EW09
TO IPWEAQ RS-065
0
28
07 3
CH
3. 0
S 4.
N FL
13 6
PROVIDE MULCH
3. .9
S 3
TO 1:2 BATTER
N FL
0 1:4
30
CH
LOT 5 PROVIDE MULCH
JOINS PLAN 1856-R36
15 5
SP222982 TO 1:2 BATTER
3. .4
S 5
N FL
0
32
CH
PROVIDE DOUBLE SWING
340
GATE TO IPWEAQ GS-048
CH
0
.00
VE
360
HAY .781
DRI
370
LT ER
WA
PROJECT: JOB NUMBER
REV DATE DESCRIPTION BY CHKD DRAWN
I GDETAL
IS SCALE APPROVED PROPOSED SUBDIVISION 1856
A 19-02-20 FOR APPROVAL MM CL AT NOOSA CIVIC, WALTER HAY DRIVE
B 25-08-20 REVISED FOR APPROVAL - WALTER HAY DRIVE TURN AROUND MM CL DATUM AHD SHEET: 6 OF 42
0 10 20 30 40 50m
FOR STOCKWELL PTY LTD
DESIGN MM ................. DRAWING NUMBER REV
DRAWING TITLE:
DRAWN MM Director: CAMERON LANDRETH
SCALE 1:1000 A3
DESIGN CHECK (RPEQ 19358) p 07 5443 8285 ROAD WORKS LAYOUT PLAN 1 OF 8 R35 B
CL
This drawing is not to be copied or amended without written permission from e [email protected] w www.barlowshelley.com.au
DATE 13-09-19 Barlow Shelley Consulting Engineers a PO Box 899, Maroochydore,4558 ABN 89 215 591 077
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.