22 January 2007
Morgan & Beiers Pty Ltd
CARE Ken Hicks & Associates Pty Ltd
PO Box 6380
MAROOCHYDORE BC QLD 4558
Dear Sir or Madam,
Re: Application for Commercial Business Type 1 - Office situated at 249 & 247
David Low Way Peregian Beach, described as Lot 1 & 2 on RP903222
I refer to the above application and advise that following preliminary examination of the
plans, the following information is required to be submitted:-
Land Use
1. Please provide a plan indicating levels on all points of the roof and top of the lift
room.
2. Please amend plans or provide justification with reference to non-compliance with
Scheme requirements relating to:
2.1. Site Cover (calculated at 60%) maximum allowable site cover is 40%
2.2. Car parking spaces required = 56
2.3. Outcome 38 of the Eastern Beaches Locality Code. It is considered that
the proposal does not present a domestic scale and form of architecture. It
is considered that amalgamating sites to cater for larger commercial
developments is not intended for the site.
2.4. Please address Outcome 02 & 19 of the Landscaping Code. It is
considered that the proposal does not comply with the following solutions:
2.4.1. Below ground components of buildings do not extend beyond the
above ground footprint to allow for landscaping, particularly within
the buildings setback areas.
2.4.2. Provide adequate screening along the perimeters of the
development (contained within the site).
2.4.3. Minimise the extent of impervious paved areas.
Award Winner - Australian Clean Beach
Challenge 2004 Litter Prevention
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 5 pages
Page 2
2.4.4. Adopt landscape solutions that reduce the visual impact of building
bulk (refer to figure 14-24 of landscape code)
2.4.5. Minimum dimensions for landscaping, frontage shall average a
minimum of 2 metres soft landscaping. Side and rear boundaries
that adjoin land a residential zone shall provide soft landscaping
3m in width.
2.5. The building setbacks to boundaries are considered non- compliant with
Outcome 5 of the Eastern Beaches Locality Code.
Land Development
3. Please arrange a licensed land surveyor to prepare a detailed survey plan of all
existing features on site, including the David Low Way road reserve. The plan
shall show all services (including their alignment, size, depth, invert level, etc), all
vegetation, existing building structures (on the subject site and on the adjoining
allotments), pathways, the edge of the frontage road (the David Low Way),
topography of the site and surrounding land (with contours at 200mm intervals)
and any other relevant information. All level information shall be to the Australian
Height Datum (AHD).
4. Illustrate all proposed finished surface levels on site, such as the driveways,
carparking areas, the areas around the buildings, the levels of the actual
buildings, levels and grades on any ramps, etc, based on the AHD.
5. Provide plans, elevations, and sections that indicate the existing ground levels
and ground profile, as the relationship of this development needs to be
determined with that of the surrounding land.
6. Demonstrate that the proposed driveway and carparking area comply with all
aspects of the Australian Standard (AS2890.1) for Parking Facilities, Part 1: Off
Street Car Parking, as the present proposal does not comply with many aspects
and is unacceptable.
Revised plans should show that every aspect of the carparking complies with
AS2890.1 by providing dimensions, levels, grades, manoeuvring paths, etc.
In this regard it is noted that the present proposal contains, blind aisles, has no
provision for vehicles to turn around in blind aisles, contains blind corners, has
steep grades for the ramps, has no clear access to the lift or stairs on the ground
level, has a disabled space positioned far away from the lift area, insufficiently
sized car park spaces, etc.
7. It is noted that one disabled car park space is proposed on site, but a
development of this size should aim to achieve at least two disabled spaces, one
for customers and one for staff.
Award Winner - Australian Clean Beach
Challenge 2004 Litter Prevention
Page 3
8. Demonstrate that vehicles can enter, manoeuvre throughout the site, park on
site, and leave the site without scraping and/or bottoming. This shall be
undertaken for all types of vehicles expected to enter the site, such as standard
cars, maintenance vans, and emergency vehicles (ambulance) with consideration
given to the height of such vehicles and the headroom required under the
building. Plans of the driveway and driveway profiles need to extend from the
actual David Low Way road into the site, and not just within the bounds of the
site.
9. Illustrate on the proposal plans that suitable sight distances can be achieved from
the proposed access driveway to pedestrians on the pathway network and to
vehicles on the David Low Way based on the 85-percentile design speed of the
David Low Way, not the sign posted speed limit. In this regard a design speed of
70km/h would be more realistic and consideration should also be given to
existing vegetation and/or proposed vegetation that may restrict these sight lines.
10. Illustrate on the proposal plans all “end of trip facilities”, such as bicycle storage
lockers for staff, bicycle storage areas for customers, showers, change rooms,
seating areas, drinking fountains, etc.
11. Demonstrate that the site can be drained without the use of pumps in accordance
with Specific Outcome O17 of Table 14-46 of the Driveways & Carparking Code.
12. Demonstrate that the site can be developed with no net increase in runoff from
the site for storm events up to a 1 in 100 year Average Recurrence Interval. In
this regard the stormwater drainage system designed for the site will need to
incorporate an adequate detention system (holding tanks) to retain these flows
which can be utilised for irrigation, toilet flushing, hose down of paved surfaces,
and ground water recharging.
The present proposal to add these flows into the existing drainage system in the
David Low Way is not supported.
13. Illustrate on the proposal plans the location of the electrical substation and the
location of the fire hydrant booster boxes that are likely to be required in order to
serve the proposed development, with consideration given to how maintenance
and/or emergency vehicle access to these services will be obtained.
14. Demonstrate how the various vegetation and landscaping treatments proposed
on site, such as large trees etc will be retained (and or new trees established)
given the shear size of the buildings and basement carparking areas proposed
and the structural elements required to support such structures, i.e. concrete
retaining walls built to the boundary and concrete carparking slabs leave little
room for plants and their root systems. In this regard the drip line of all trees and
vegetation proposed on site should be kept free of hard surfaces based on the
mature (fully grown) tree size, not the size when planted.
15. It is noted that a fence is planned to be provided along the southern boundary of
the site to reduce noise levels, however no details of this fence have been
provided to illustrate the type of material that will be used to construct it, nor its
height in relation to the existing residential building to the south and existing
windows.
Award Winner - Australian Clean Beach
Challenge 2004 Litter Prevention
Page 4
16. Please arrange for all engineering design plans and engineering reports
submitted with the application to be certified by an appropriately qualified
Registered Professional Engineer Queensland (RPEQ), as it is noted that none of
the plans nor any of the engineering reports have been prepared, checked, and
approved by an authorised person. In this regard none of the plans or the
engineering reports will be assessed in detail until a RPEQ has authorised them.
Council therefore reserves the right to make a second request for further
information upon review and assessment of the authorised documentation with
no consequence to IDAS time lines set by the Integrated Planning Act.
The applicant and any consultants assisting in the preparation of this
development proposal are advised that an independent check of some or all of
the technical reports and plans submitted may be forwarded to Council’s own
expert specialists, and the cost of this independent review will be borne by the
applicant.
Buildings Services
17. Please indicate how the building will comply with section C (Fire Resistance) of
the BCA (Building Code Of Australia) on the northern boundary and from building
to building.
18. Please indicate how the basement will comply with part F4.11 of the BCA
(Building Code Of Australia).
19. Please indicate how the basement will comply with part D1.4 (Exit travel
distances) of the BCA (Building Code Of Australia).
20. It appears that the building does not comply with the disable access or disable
toilet facilities. The building and environs should be designed to meet the
requirements of the Human Rights and Equal Opportunity Commission “Advisory
Notes on Access to premises” and AS 1428.1. Any services and facilities in the
building complex must allow independent, dignified and equitable use of the
facilities for all people. Show how the building will comply.
Environmental Health
21. Waste management is not suitably planned and point 4.4 of the Report
contradicts the ground floor plan. Therefore please submit a Waste Management
Plan (Operational) in accordance with Planning Scheme Policy No. 9 “Waste
Management Multi-Dwellings and Commercial and Industrial Premises”, for the
day-to-day operation of the development. It is critical that waste areas are
properly planned. A copy of Planning Scheme Policy No. 9 explaining exactly
how to predict waste quantities and design waste areas is available from Council
and the web. The Plan shall include the following information: -
The types of waste that will be generated from the activities approved
within the development.
Estimated volumes or tonnage of both recyclables and waste generated.
Methods to be used for dealing with garden waste.
Award Winner - Australian Clean Beach
Challenge 2004 Litter Prevention
Page 5
Initiatives to minimize waste either by waste prevention, reduction, re-use
or recycling.
Description of procedures for getting all waste to the bins; the storage of
bins and the collection of bins by the contractor.
A description of the design details of waste storage and recycling areas
including size, location, elevation and floor plan, methods of bin washing
and system to prevent storm water getting into sewer via the bin wash.
A description of types and volume of waste storage containers to be used.
The waste and recycling storage area shall include the provision of
containers for all waste and recycling materials including putresable matter,
non-recycling waste, paper/ cardboard, glass, aluminium/steel cans, waste
oil, styrofoam boxes, etc, and bin washing facilities connected to sewer.
A detailed description of vehicular access to collect waste outside the front
of the property, for either wheelie bins or bulk bins and without causing any
traffic hazards.
22. Noise nuisance prevention to the residential property on the southern side is
insufficient. Therefore please detail exactly how noise nuisance will be prevented
from any noise source including amongst other things vehicle movements and
the installation of mechanical plant eg: air conditioning, refrigeration motors. This
information may require directions from a registered professional Acoustic
Consultant.
Please provide four (4) copies of all information that you are providing. In addition, it
would assist Council if you could also provide an electronic copy of your response.
Please be aware that under Section 3.2.12 of the Integrated Planning Act, the applicant
is to respond to any information request within 12 months of the request or otherwise,
the application lapses.
Under the provisions of the Integrated Planning Act 1997, you as the applicant, have
three options available in response to this Information Request. You may give the
assessment manager (in this instance Council) and each referral agency (if any):-
1. all of the information requested; or
2. part of the information requested together with a letter asking the assessment
manager and each referral agency to proceed with the assessment of the
application; or
3. a letter:-
3.1. stating that you do not intend to supply any of the information requested;
and
3.2. asking the assessment manager and each referral agency to proceed with
the assessment of the application.
Award Winner - Australian Clean Beach
Challenge 2004 Litter Prevention
Page 6
The above information is required to be submitted, prior to assessment of the
application. If any further matters arise as part of assessment of this application, you
will be advised accordingly.
Should you have any further queries in relation to the above, please do not hesitate to
contact on the above number.
Yours faithfully,
Nick Cooper
PLANNING OFFICER
Award Winner - Australian Clean Beach
Challenge 2004 Litter Prevention
Used in these records
Request for Further Information - 010.2006.00002689.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 25 KB (small file)
- File type
No other editions are linked here.