response to information request - 12 wyandra
11. Provide an amended plan that demonstrates a 1.5m wide footpath will be
constructed along the frontage of the subject site. The amended plan must
be prepared by a suitably qualified person (RPEQ – Registered Professional
Engineer of Queensland) and align with the proposed footpath along the
frontage of 14 Wyandra Street.
12. Provide additional detail on the proposed driveway and crossover. The detail
must be prepared by a suitably qualified person (RPEQ – Registered
Professional Engineer of Queensland) and include, but not be limited to:
a design generally in accordance with RS-049, RS-050 and any associated
addendum;
b. levels and grade of the access driveway;
c. a longitudinal section extending from the centre of the formation along
Wyandra Street to the finished floor level of the proposed garages; and
d. demonstrate that a B99 vehicle will not scrape or bottom out while
entering or exiting the driveway.
13. Provide additional detail demonstrating how trip hazards will be eliminated
within the road reserve due to the construction of the proposed driveway
crossover. The amended plan must be prepared by a suitably qualified
person (RPEQ – Registered Professional Engineer of Queensland) and
include, but not be limited tothe full extent of the transition to the adjoining
areas of verge.
14. Provide an amended Turning Path Plan demonstrating that vehicles are able
to enter the proposed garages, manoeuvre on site, and exit the site in a
forward without colliding with any other vehicles, structures or future
landscaping. The additional detail must be prepared by a suitably qualified
person (RPEQ – Registered Professional Engineer of Queensland) and
include, but not be limited to:
a. the adjacent garage carpark must be occupied with a B99 vehicle
during the vehicle swept path analysis.
15. Provide additional detail demonstrating how the rainwater collected in the
south-western corner of the on-site will be controlled, collected and released
without causing scour damage to neighbouring properties. The additional
detail must be prepared by a suitably qualified person (RPEQ – Registered
Professional Engineer of Queensland).
16. Provide sufficient detail to demonstrate that the development achieves
compliance with The Noosa Plan 2020 – Water Quality and Drainage Code
and Sustainable Building Design Code. The detail must be prepared by a
suitably qualified person (RPEQ – Registered Professional Engineer of
Queensland).
Recor provides specific comment and plans addressing the additional engineering
requirements setout above. The architectural and landscaping design changes work in
with these technical engineering modifications, including the removal of retaining
structures from the frontage and including battered landscaping, as well as a 3k water tank
to attenuate the water and provide water for landscaping.
---------------------------------------------------------------------------------------------------------------------
Page 6 of 7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.