102995-10 Permissible change request
Attached to the e-mail REC12/0014.02 Change to existing approval - Bunnings Noosaville.
Page 2 of 3 samples. On completion, the bores were observed for groundwater seepage and then backfilled with spoil tamped into the holes. The field work was undertaken by experienced geotechnical personnel who logged the bores, collected disturbed samples for visual and tactile assessment. 3. Field Work Results The subsurface conditions encountered in the bores are described in detail on the attached borehole logs. In summary the subsurface conditions encountered in the bores typically comprised filling to between 4.1 m and 5.9 m depth. The filling typically comprised a gravelly sandy clay overlying a sandy clay which was in turn underlain by a silty clay in Bores 2, 3, and 5. The filling was underlain by natural sandy then silty clays. No groundwater seepage was observed during the investigation; however, it should be noted that groundwater depths and ground moisture conditions are affected by climatic conditions and soil permeability, and will therefore vary with time. 4. Comments 4.1 Appreciation of Ground Conditions DP previously carried out geotechnical investigations on the site in 2006 and 2008. In the area of the site, uncompacted to poorly compacted filling with foreign material (ie. bricks, timber, steel sheeting, steel pieces, tree roots) was encountered up to 4.7 m depth. As mentioned above, filling was encountered to between 4.1 m and 5.9 m depth in the recent bores. The near surface filling encountered in the bores at the time of this investigation appear to be clean of any foreign, deleterious material or topsoil material rich in organics or root matter. Any organics or foreign material including concrete, plastic, wire and bricks encountered within the recent bores was encountered typically in the sandy clay filling material below 1 m depth consistent with the ‘uncontrolled’ filling previously encountered. The settlement of ‘uncontrolled’ filling cannot be reliably predicted as it is unknown whether the filling has been placed and uniformly compacted to an appropriate engineering standard. The presence of voids within the ‘uncontrolled’ filling as well as potential soft/loose zones or inclusions of deleterious materials may lead to potentially significant settlements, with possible large settlement over short distances (ie. differential settlements) where looser pockets occur in the filling. 4.2 Recommendations for Future Construction Given the above, future development on the site will need to be planned, designed and constructed in accordance with sound and proper engineering principles, and more specifically take into consideration the potential long term settlement or creep of the ‘uncontrolled’ filling. Report on Geotechnical Investigation Project 33984.02 178 Eumundi-Noosa Road, Noosaville September 2015
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.