Original source · versioned page text
Information Response
Very large file: it may take a few minutes
The original of this document is very large (10.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Figure 2: Existing access - aerial imagery
Item 8
Provide justification for the building extent, particularly the need for individual buildings
external to the main dwelling, which are visible from the river. Submit amended plans
where possible.
Item 9
Provide perspectives as viewed from the river, which also consider Rehabilitation area 1 as
shown in the Ecological Assessment.
Response: The building designer has confirmed that when viewing the site from the river, the existing
river bank vegetation will obscure most of the building area. Passerbys would be able to have a clear view
of the building from about 2km (halfway across the lake towards the township of Boreen Point) from the
building platform. Refer to Figure 3 below.
Figure 3: Approximate location of the proposed development when viewed from the river
3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.