Response: Please refer to the Engineering Plans prepared by SCG Consulting Engineers. The plans
provide details of the extent and volume of proposed cut and fill.

Item 11

Provide a preliminary Erosion and Sediment Control plan that demonstrates how best
practice methods will be used to ensure sediments will be contained and potential erosion
within the site will be managed. The plan should be prepared by a suitably qualified person.

Response: Please refer to the Engineering Plans prepared by SCG Consulting Engineers.

Item 12

Provide a preliminary Stormwater Management Plan that demonstrates how rainwater on
landscaped and impervious areas will be collected, reused and released. The preliminary plan
must be prepared by a suitably qualified person (RPEQ – Registered Professional Engineer of
Queensland) and include, but not be limited to:
     a. demonstrate that the proposed drainage grates (D38 & D39) are suitable to collect
         the catchment area from the downward slope of the driveway;
     b. demonstrate where the proposed drainage grates (D38 & D39) will release; and
     c. provide a comment certifying the basement will not experience flooding/pooling.

Response: Please refer to the Engineering Plans prepared by SCG Consulting Engineers.

Item 13

Provide additional detail demonstrating the full extent of clearing and the extent of civil
works required to ensure the existing ingress and egress is suitable to comply with the
recommendations made by Queensland Bushfire Planning. The additional detail must be
prepared by a suitably qualified person.

Please note that Council is unlikely to support further clearing of Koala Habitat within the
subject site as the proposed dwelling it sufficiently clear according to Queensland Bushfire
Planning.

Response: Please refer to the Engineering Plans prepared by SCG Consulting Engineers. No further
vegetation clearing is required for access as discussed in Item 7 of this response.

Item 14

Provide additional comment discussing how the “BendPak HD-14TL” car lifts will be utilised
and how their use will affect the functionality of the proposed basement garage for other
users. The comment must address:
     a. whether additional cars will be parked under the car lifts while they are occupied;
         and
     b. the maximum allowable height of vehicles utilising the car lifts.

Response: Please refer to the revised Proposal Plans prepared by Skale Building Design, which removes
reference to the BendPak HD-14TL car lifts. Sufficient car parking is provided to support the proposed
development.

Item 15

Provide the following detail:


                                                                                                    5
Log in to download the original file

Information Response.pdf · 10.9 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.