_As Published -Change to Existing Approval & Extension to Relevant Period - 152006 862 02 - 1030538 · 152006.862.02
152006.862.02
In this regard, an approved ENERGEX Electrical Design Consultant shall work in
conjunction with Council to prepare detailed designs of the electrical proposal.
The detailed deigns shall then be submitted to ENERGEX for approval and a copy of
their approval submitted to Council in conjunction with a “Certificate of Electricity Supply
for Proposed Subdivisions” (prepared by an approved ENERGEX Electrical Design
Consultant) prior to Council endorsing the Plan of Survey.
Any agreement with ENERGEX or an approved ENERGEX Electrical Design Consultant
shall be wholly at the applicant’s expense and shall not entail a financial encumbrance
on future purchasers of the proposed lots. A Development Permit for Operation Works
shall be required.
21 The requirements of ENERGEX shall be satisfied in relation to any existing or proposed
services that traverse this site or any other property in relation to providing electricity
service to this development site. Written confirmation by ENERGEX that satisfactory
arrangements have been made to formalise any required easements and/or existing
informal services shall be submitted prior to Council endorsing the Plan of Survey.
Telecommunication
22 The requirements for TELECOMMUNICATION services shall be satisfied in relation to
the provision of new telephone services to the proposed lots. In this regard written
confirmation from an approved telecommunication agency shall be submitted to the
Council prior to Council endorsing the Plan of Survey.
Effluent Disposal
23 The design and construction of any on-site effluent disposal system and disposal area
(land application area) shall be in accordance with Council’s Planning Scheme Policy
PSP24 - Effluent Disposal
Specifically, the land application area shall be positioned to achieve the greatest
possible setback to the dam/lake and to any permanent or intermittent watercourse.
The land application area shall also be positioned at least 15m from any underground
rainwater tanks.
Erosion and Sediment Control
24 Any person acting on this permit shall prevent erosion and sediment export from leaving
the site. Site control measures such as silt fencing, controlled gravel access to the site
and controlled disposal of waste, will be necessary.
In this regard, plans detailing the methods of controlling erosion and sediment are
required to be submitted to the Council for approval prior to obtaining a Development
Permit for Operational Works.
Compliance Bond
25 Prior to Council giving approval for Development Permit for Operational Works the
applicant shall submit $10,000 bond to ensure compliance with the conditions contained
within this approval. The bond will be returned following the acceptance of all works.
Infrastructure Contributions
26 The applicant must pay contributions towards trunk infrastructure in accordance with the
following Planning Scheme Policies and Council Policies:
(a) Planning Scheme Policy 12 – Public Open Space Contributions;
(b) Planning Scheme Policy 13 – Contributions in Lieu of Off Street Parking;
(c) Planning Scheme Policy 16 – Sewerage Headworks Contributions;
Page 5 of 36
Document Set ID: 19816636
Version: 1, Version Date: 02/11/2014
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
_As Published -Change to Existing Approval & Extension to Relevant Period - 152006 862 02 - 1030538.pdfRelated documentApplication case desk ↗