Council archive · source document
_As Published -Change to Existing Approval & Extension to Relevant Period - 152006 862 02 - 1030538 · 152006.862.02
152006.862.02
7 ADVISORY NOTES
The following Advisory Notes are for information purposes only and do not form conditions of
approval:
1. For the purpose of these conditions, the following definitions apply: -
1.1. A Plan of Survey means the plan for the reconfiguration of a lot required to be
endorsed by Council pursuant to S3.7.1 of the Integrated Planning Act 1997.
1.2. A Registered Professional Civil Engineer means an engineer who is
registered with the board of Professional Engineers of Queensland.
1.3. The person acting on this permit means any person or company who
undertakes development pursuant to this permit.
2. As the site is located partly located below 5m AHD, any excavation works consisting of
100m3 or greater and/or any filling works consisting of 500m3 or greater and with an
average depth of 0.5m or greater below 5mAHD will need to be carried out in
accordance with State Planning Policy 2/02 Planning and Managing Development
Involving Acid Sulfate Soils. In this regard appropriate testing and supporting
documentation prepared by a suitably qualified specialist shall be submitted to Council
for approval prior to obtaining a Development Permit for Operational Works.
3. The applicant is advised that a Compliance Permit for all plumbing and drainage works
within the boundaries of the development site shall be obtained from Council’s
Plumbing Services Section prior to obtaining a Development Permit for Building Works.
4. Any building or clearing works on the proposed allotments should take into
consideration that the remnant bushland vegetation on these lots, subject to the
provisions of Local Law 10 – Vegetation Management (2003) and The Noosa Plan’s
Biodiversity Overlay Code.
Infrastructure Contributions and Infrastructure Charge
5. An advice notice outlining the estimated infrastructure contributions payable and the
basis for their calculation under the current Planning Scheme Policies and Council
Policies is attached with this Development Permit.
6. For properties located in the catchment area for the Coastal Major Road Network
Infrastructure Charges Plan, this development permit may trigger an Infrastructure
Charge to be issued in accordance with the Infrastructure Charges Plan and Chapter
5 of the “Integrated Planning Act 1997”.
7. Please contact Council's Infrastructure Charges Officer (email:
[email protected]) a minimum of 5 business days prior to payment of
the infrastructure contributions and/or charge notice so a payment advice detailing the
amounts applicable at the time of payment may be issued to accompany the payment.
8. Payment of infrastructure contributions and/or infrastructure charge notices will not be
accepted by credit card transaction.
Aboriginal Cultural Heritage Act 2003
9. There may be a requirement to establish a Cultural Heritage Management Plan and/or
obtain approvals pursuant to the Aboriginal Cultural Heritage Act 2003 (ACH Act).
The ACH Act establishes a cultural heritage duty of care which provides that: “A
person who carries out an activity must take all reasonable and practicable measures
to ensure the activity does not harm Aboriginal cultural heritage”. It is an offence to fail
to comply with the duty of care. Substantial monetary penalties may apply to
individuals or corporations breaching this duty of care. Injunctions may also be issued
Page 7 of 36
Document Set ID: 19816636
Version: 1, Version Date: 02/11/2014
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
_As Published -Change to Existing Approval & Extension to Relevant Period - 152006 862 02 - 1030538.pdfRelated documentApplication case desk ↗
About this file
- File size
- 6.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.