Original source · versioned page text
SARA referral Response
Noosa Council documents MCU15/0111 SDA-121E-L2€783, delay construction. on Bus stop compliance To ensure compliance with Condition 3 of this concurrence agency response, the applicant is requested to provide the detailed design of the bus stop pair to the TransLink Division of the Department of Transport and Main Roads for endorsement prior to construction or any works commencing. Please contact the TransLink Division by phone (07) 3851 8700 or via email at [email protected] TransLink’s Public Transport Infrastructure Manual May 2012 is available at: http:/Atranslink.com.au/about-translink/what-we-do/public-transport-pianning. The northbound bus stop should maintain an adequate clearance from the maintenance access gates for the North Coast Line railway. 6 Stormwater Compliance The Stormwater Report with detailed stormwater management design should be submitted to the North Coast District Development Assessment Team of the Department of Transport and Main Roads for review and endorsement prior to obtaining operational works approval associated with bulk earthworks, stormwater or drainage is sought or construction commences. Please quote the Department of Transport and Main Roads reference number: TMR16- 016077. The review and endorsement of the stormwater management design, will ensure that the detention basin and stormwater management system complies with the requirements of this condition and achieves a “no worsening” outcome. Deoartnest of Infrastructure. Loca’ Government and Planning Page 2 Page 29 of 37 Document Set ID: 20103451 Version: 1, Version Date: 25/07/2016 Print Date: 25 July 2016, 3:34 PM
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (SARA referral Response.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.