Nkerene ee Checklist - Applications Involving Land
oy Development & Land Use Sections
IDAS APPLICATION
This checklist should be used for any IDAS application. Please check each.of the following items before accepting an
application at the counter.
AREA BBL IGA TION: ORIG ree ae RPE BAND TBR TPL A RIND ge INN a oa
_ -TSEARBEICATION|FORMSS SO owcee Wittin ne Oe eee ARIE 25 ie Tae
1.1. Form PartA
1.1.1 Ensure that the form is fully completed.
1.1.2 In the case of an MCU or Op Works below the high-water mark, owners consent is required. .
‘ 1.1.2.1 If there are multiple owners, the consent of each owner is required.
1.1.2.2 If the owner of the land is a company, either ACN No. or Company Seal required.
1.2 Form’ Part B-O Supporting Information
1.1.2 Ensure that for each box checked on Form A, the relevant additional Forms B-O are attached. L/] .
1.1.2.1. Ensure that each of Forms B-O which are attached are fully completed. LZ]
20 REFERRAL INFORMATIONS Ske an ate eer ORNL
© 2.1 Ensure that items 1-23 have been checked and/or completed with regard to referrals.
as a eT a WY Tot SL ot RSV OM Por ba WIPO SY Woe WT ied Per sas SEPSIS EASES FR ERO SEA BENT LY RI ETRY
SHS ENVIRONMENTALLY: RELEVANT ACTIVITIES 3 Suen Ma Le ED
3.1. Ensure that Part G is completed if EPA referral is required.
3.2. Where EPA is delegated to Council (see * in ERA checklist), ensure that the correct application
fee is paid and recorded on the application.
422 FORM 2& REQUEST O:C HANGE'ARPROVAL HS Rap eos ime son cae hones Creat
‘ 4.1. Ensure that items 1-28 have been checked and/or completed including information regarding
applicant details and owners consent.
SISPS BEANS aM ies ee Ry Men eae We ua Ce MEERUT A COOP aN en aUBRE Eye Mey Pend
5.1 Ensure that at least 6 sets of the Plan of Development (5 for Reconfiguration and Operational! wa
’ Works) accompanies the application. tn addition ensure that each set is complete.
. §.2. Ensure that 1 of the copies of the Plan of Development is in an A3 or A4 format and is [Vv]
unbound.
GE SUPBORTINGINFORMATION Ge aun an hoa Cana cn uve Ce UE DA TNE
, 6.1 Ensure that at least 6 copies of any report accompanies the application (5 for Reconfiguration [7]
and Operational Works). If the application is accompanied by a covering letter, ensure that it is ,
@ capable of reproduction.
6.2 In the case of reports, ensure that 1 of the copies is in an A3 or A4 format and is unbound. v
ACRE ERE is ns a eR San ea TC eH rae a ee ao
7.1. Ensure that the application fee, as determined from the Council's adopted scale of fees,
accompanies the application or has been paid.
7.2: Ensure that the fee which has been paid is recorded on the application form. .
Receiving Officer Noerde MINE. pate ....09:.6: Z0Q7...........
Having completed this form and accepted the application, please deliver both to the following IDAS Application Receiving |.
trays:-
e If the application is for a Material Change of Use exclusively -AOP1’s desk in the Land Use Section.
e {f the application is for an Material Change of Use & Reconfiguration - AOP1’s desk in the Land Use Section.
e ifthe application is for Operational Works (for parking, access, sewerage or drainage) exclusively - AOD2 in the ;
Land Development Section. ,
¢ In all other circumstances — AOP1’s desk in the Land Use Section.
Please DO NOT leave the application at the counter and DO NOT deliver the application to Records.
SEP 1 g:\ant\orms\application checklist.doc -See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 20 sections
Section 2
‘ ir ws : *
INTEGRATED PLANNING ACT 1997 Part A, Version 2.4, 29 May 2006
VU med PL a= (6) eases) ell (e-leln GEG |
"The completion of all applicable questions on Part A is mandatory for all applications. Part A must be accompanied by the completed IDAS Assessment Checklist if
._Fequired, and by one (1) or more other completed: parts of the Form as required. For more information:on the parts of the Form refer to www.ipa.qWi.govau. 7.
Any information requested in the form may be provided in an attachment to the application. For further information about completing the following details, refer to Guide 1.
Descriptionofland =. S| 4. ‘Street address: fncludinghouse number, street name, suburiviocality name & postcode) if applicable) ©.”
“identfed, However, 8 description oft land i fot 67 Saltwater Avera Nooas Waters _ —
. Ervrmentay Relvant acy EF) “+12. Name of water. body or watercourse, within which the development is proposed: (if applicable)
_ development is proposed within a water body or” . - — — or as ms me GREE He ae
} . watecoursé; = “ole. “13. - Lot on plan description (eg. Lot 123 on RP 4567)/ GPS coordinates: =. tg So
* Advice for completing Q3- Most landcanbé “| - * . a : aa
_identifed by a lot on plan description. Thesedetais | - | Lot 150 on RP 883847 :
; i om & th ‘ : tea gg Gi me 48.0 3 cd Be ser we Cegh eee
maps ee ° 4. - The above description is for: (tick applicable box) . ceed, .
* However, ifthe land on which the developmentis |. Dx] (i) the larid on which the development is proposed; or - Pky
te development proposed ina wate body Gr ~ E/(ii) the lard adjoining the water body or watercourse, within which the development is
watercourse) provide = sf propésed;or oe CR ae
0 eninge > 1-1 Gi) the water body or watercourse, Fe
} GPS coordinates where thereisno « ele . Cee . Le i
m adiingfaciacent and (gin Moreton Bay / 5. _Shop/ tenancy number: ~ 6.- Storey/level: =~ 7. Total area of land: (m? or ha):
development is within a water body ‘or watercourse. “| ; —— — a ss . = i — =
Advice for completing Q8- 08 applies if are ee ee ee Slant te eihiatane £ ‘. Se
developments win alocal goverment area, 8. Local government area in which the land is situated: (eg. Esk, Hervey Bay, Woocoo etc) (if applicable)
local government's area unless provided for under the J. = TSE 7 = oT = a
Local Government Act 1993. , 9. — Port authority for the strategic port land or strategic port land tidak area on which the’ «
Advice for completing Q9~- Q9 applies if > - er sa ic Mean «fn Dod At Drichaia Dai ainevittes [if annlicah Pe .
developmentis on strategic portlandorastatege |. development is proposed: (ég. Port of Brisbafte, Port of Townsville) (if applicable). - ey .
‘Proposal details ~ 1 40." Existing use of the land: (eg. vacant single house, Sshopet;) = se we
@ provided in an ‘attachment to the application. Detached Dwelling — = - _ = - ETE
, ~ | 11. Proposed use of the land::(eg. 6 unit apartment building, 30 lot residential subdivision, ERA for aquaculture in
. : . ponds with a total area of 7 ha for which wastes are released into waters fc). oe ccs ca
~< | * | Home Based Business -Type 2 {interior design service) z
Other applicablé parts of Form 1 «| 12. Other parts of Form 1 completed as. part of this application: (eg. Part D, Pariet)-
cy | :
completed parts of Form 1. For information about . | |PartD and referals checklist , :
when.a part of Form 1 may apply refertoGuidet, |. : we RT eee
‘Applicant details = 113: Applicant'sname: ___. 15. Contact person: ee
epnantneed fate te omer fthelnd,, |, Peter Selinger . | [eter Selinger ;
When slaning and lodging this application | ./44. Contactnumber: 16. ‘Facsimile number/e-mail address:
ile op rc Ged fs conor Thaiass weg | + | 8474-2255 : _ | [email protected] :
narod oy Stale Lea 17. Postaladdréss; =. sc Pee
komdetPoncamesD oconGony | | [POBox TOHONecsawleDC 4568
byl be shih oO 1 VO*: 148, Signature; ge ne a Date, Uy
REIN gor YS Ligl6 fot
BY. & cS os be . 0 ™~ = a, - i :
es ‘" gy Ag. f. { or Bese Nt ur Ss oF # iz “oO & - _—_ : “3
WT a OO
“LZ ‘ ae . ,
, a: mM
|Section 3
oye a *
‘INTEGRATED PLANNING ACT 1997 Part A, Version 2.4, 29 May 2006
Land owner's corisent (applicable) "| 20. Land owner's consent to the making of this application: ae , }
application must contain, of be supported by, the 2
written consent of the land owners, if the application ° : ) ¢ iWwawm Berry Cf
involves: mS we ate SE yee be SL /4-] cf
(i) amateriatchange ofuse; . MAY VT. >» Ff. i eee 4 RN ee feet ES /o7}
(i) reconfiguration of a Jot, L ee VAT AR.- F. / ;
(iii) work on fand below high-water mark & not within at -. i)
canal as definéd under the Coastal Protection and | + Stole reer tay... voce eee eee fo beep
Management Act 1995:0r - “ (i :
{iv) work of rail corridor land defined under the ‘ : a i
Tanspotinfasinctu act 1994 Tf MOI AIM. |
Section 3:8,1(2)(a) ofthe IPA provides that 2c | .
landowners consent is not required for amobiieor |. “| (iv)
For more informatiori refer to Guide 1, (v) |
Resourceentitlement (if applicable) | 21. Does this application involve a State resource prescribed under a regulation (other than involving
; Section 3.2.1(5) of the IPA requires evidence cf + —<_quarry'material on State coastal land under the Coastal Protection and Management Act 1995)?
resource entitlement be given for anpficatiéns that : nO es a Me Bt
involve a prescribed State resource. . . . DX] NO - goto Q24 & “ ., LI] Yes = gotoQ22 : -
Seéfion 3.2.1(10)(a)(i) of the 1PA prescribes that ee Sg ay NE a
zppteion cannot ve tekan to be propetyinade 22. This application is accompanied by evidence: (tick applicable box) PMR
Niven one. - (1) of the allocation of, or entitlement to, the resource - attach evidence and go to Q23(v) =
i r completing O21 & 2: # : - aia ce NL vp os ie : oa - bb te ae ‘s
Refer to schedule 10 of the integrated Planning - | ~ [_] (ii) the chief executive of the department administering the resource is satisfied the ~
Regulation 1998 that prescribes the nature Ofevidence| - de nent i ‘i t with an. <atign of entitiement to. tt “0 SS
required by the Staten support of the lodgig of his developrient is consistent with an allocation of, or entitlement to, the resource =90
@ - davelopment:application’” “3 Sapo Ry . pee ee a bose os *, s |
“| _ = =| 3. C1 (iii) the chief executive of the department administering the resource is satisfied the
“ : cn = . development application may proceed in the absence of an allocation of, or
so Se - - entitlement to, the resource ~g0t0Q23 “
Advice forconipletingQ23 == — 193 Evidence ofthe résourceentilement’” =<:
uit noone ._ (i) ~Resoutce entitlement / authority details (vil) Official stamp of the department
The official stamp of the Department of Natural «., ~ & administering the resource (if
Resources, Mines and Water's riandatory where the | 2 7 = LF are -.. €pplicable) . Es so
application involves any water ortiverine quay “* (ii) ?-Name of delegated officer’ 8 |g :
- Section 3.2.1(5A) allows tha resource manager tofimit} — —— -
thé time the evidence may be used. 023 (vi) must be Fy. Position leaaied officer. :
completed the evidence se tind. . (i) Position —— Officer 3k
oo et — officer .
| Dae
@ . (vi) a date of evidence a So Boe
Assessmenttriggers = =———S=«&S 244. I the IDAS Assessment Checklist Completed and attached to this application? a
This checklist does £ if the apptication requ A yee : ee CaS ee ‘a ot dpi ee tins pin
the complefon oP enna Meta tca ony It &] YES » .. LINO-the assessment manager may refuse fo accept this application on the
must be completed for all other. applications. . E ee grounds that the epplication hes not been property made oe
Plans/ drawings !reports ==» | 25. ‘Plans/drawings/reports accompanying this application,»
An application should be accompanies ils to . " —
manager, referral agencies. and any person viewing ,
the appication during public scrutiny or public” (i)
notification to: understand the scope of thé proposal cr ntosrrsessccsesercccacs se cccsec ccc ece pace n nec cc cee cc eee eee a ene ae
and any potential impact. Sods (ii)
ee | li
Cg (iv)
PLEASE NOTE: The assessment manager may refuse to accept an application that, at the time of lodgement, fails to provide all applicable information required by Part A
and any other relevant part of Form 1.
eee
OFFICE USE ONLY (applicable to assessment manager's)
Tee,” ; DATE, RECEIVING OFFICER'S : REFERENCE.
FES) 1460-00 (9-6 -07 uertn Hern _| Fuses | 2007/57 _
HSS ss “Notification of Eigagement of Private Certifier (Optional format,
To: a ath ee a ___ Council. | have been engaged as the private certifi for the building work refered toin this application...
“Date of engagement’, -/ 4 Accreditation Number. Names Signatures.Section 4
oa 5 . .
INTEGRATED PLANNING ACT 1997 Part D, Version 2.0, 4 October 2004
XS Form 1 Development Application idas
YW’ aterial change ofuse t&
assessable against a local government's planning scheme ¢
“© 5)" Completion of all applicable questions on Part D is mandatory for alapplications involving ssessmentofa=
Boe material change of use (MCU) assessable against alocal goverimenis planning scheme, =
Nature of the application “ | 4, This application is for: (tock tor both if applicable)
2 ge jeiopment permit authorises __|.°° [} Preliminary approval for a material changé of use of premises including concéptual
Serle See ree emnay |. * design for any associated works that require approval under the planning scheme (ie. © ~
approval is a Step in the approval process -.. © ggridigeration of the ‘al concept} : LS o i : fe a x :
and does not authorise development to occur.| 3. fons oe one propose o cep ) . . “ ‘ : - _
ee es fee ANDIOR
© i , = 18.) Development permit for a material change of use of premises including conceptual
cre Se design for any associated works that require approval under the planning scheme. =
The subject land _ _, |2, How the subject land is identified in thie platining scheme (name the zone, precinct etc.) oe
te planning scheme againstwhich tte |." Lelached housing , — /
application will be assessed.” - eS Boe OE TT —
‘. , _ 3. Existing gross floor area: (if applicable). | 293m2 -
: , : S ae STE 7 = CZ = = 7
eo 14.» Are there any existing easements on theland? = -
VG ia = . Sa - £1) YES = attach plans of the focation and details of the purpose of the easement :
Az ophif changigf use détails, 5... Details of the change to the use of the land: (eg. vacant land io shopping céntré, house to apartment building,
; e\ |. « aeeitland io industy (bre manufacturing) ett) TS
RECEI ED “| Home Based Business Type 2
en rma, £2) (® Memetenaness [ge
HOOSA SHIRE COUNCIL BO eg Ser =
FRONT COUNTER &) 1, Operating days and hours: | Monday to Friday - 9am to 5 pm
@ sega tapi way syefails (f |g Site cover. 29% ( exsting detached dwelling) Co oo
aréat and storey’ go tothe planning schesne ‘9. Gross floor area:, | 50m2 (home based business) | 7 2
jdinst which the application willbe =” Pes, a ae a Ba
Sty 11. Number of storeys / maximuni height above natural ground: we oy and approx 8
: ; 143. Hours and days the use willoperate . | Monday to Friday - 9am to § pm =
Associated operational works details | 14. Details of associated operational works (eg. landscaping, cut and fil, drainage, road works etc)
epee) | lated Op i WOTKS (eg. landscaping, cut and fil, drainage, road works etc)
PLEASE NOTE
This application cannot be accepted unless accompanied by Part A of Form 1. °
The assessment manager may refuse to accept an application that, at the time of lodgement, fails to provide all applicable information
requested by Part A and any other relevant part of Form 1.
OFFICE USE ONLY feppiicabie to assessment manager) .Section 5
. 7
dee , INTEGRATED PLANNING ACT. 1997 , IDAS Assessment Checklist, Version 20, 2 April 2007 ,
ay BOMB oncule elec ees
y Assessment _
rey , St, ri 7
fj = —~— Checklist
iH ; ,
- - _ {Formerly the “Referrals Checklist”) ,
; IMPORTANT NOTE FOR ALL APPLICANTS: ;
. 1. This checklist was formerly referred to as the "Referrals Checklist’. Some of the ‘Guides’ to using the IDAS Application Forms continue to refer to this document as the .
“Referrals Checklist’. The name of this checklist was changed from 25 July 2005 to more accurately describe its function. . ,
. 2. Under the IPA and IDAS framework, an application may require assessment by the loca! Council and/or certain Queensiand State entities (e.g. Environmental Protection .
Agency, Dept. of Natural Resources and Water, Queensland Heritage Council etc.). : .
3. This checklist is provided to assist applicants to determine when an application requires assessment by a Queensland State entity and may also assist the applicantto
determine the assessment manager’ for the application. . . a
4: Therefore, the completion of al! questions in section 4 of this checktist is mandatory for all applications (other than those requiring the completion of Parts A & B only). .
- 5. Itis the responsibility af the applicant to accurately complete this checklist. . . .
: 6. — Section 2 is mandatory only if the proposed development is located in any part of a wild river area declared under the Wild Rivers Act 2005, . ,
3S. Depending on the nature of the apptication, an applicable State entity may be either the assessment managér or an iDAS referral agency for the application.
8. The assessment manager for the application will rely on the information provided in this checklist (as well as any material lodged in support of the application) to identity
: . _ any applicable referral agencies for the application in the Acknowledgement Notice. The assessment manager will also rely on this information when identifying if the
: . application triggers referral coordination?. .
. 9. To assist you'in answering the following questions a series of guides are available free from the IPA website www.ipa.gld.gov.au. Guide 25 explains the role of the IDAS
Assessment Checklist in the DAS application process, and its relationship’ to the Form 1 development application.
, 10. Any other parts of Form 1 that this checklist requires to be completed are available from the Council or the applicable State entity, or can be downloaded free from
www. ipa.qid.gov.au. : . .
: 11. Section 3 provides advice about the referrals that can be required for applications for building work assessable against the Building Regulation 2006. : :
. bas: "ea Tat eS SECTION: STATE ASSESSMENT; (completion man datory) eae tsias Fake 24
ra ge Vn Rae ak ; SS oie A Pe nme hee poe vibe Pe Cee ye Beh Pi Shoe Fi ied
Nae Speke vibe’ Gap? OR RR gente Sky a4 SE SB a wa cM UM ME HO AR eS
: Note:The following state assessment triggers apply.lo development other.than for.building-work assessable against the Building Regulation 2006 ihe ag gee S
. Environmentally relevant activity 1. . The application involves: (tick appticable box/es)
For more information referto Guided =) (C7 (i) an environmentally relevant activity (ERA) for which a code for environmental compliance
“Unless You answered “none of tie above" to 1, has not been made - complete Part G of Form 1 .
“the application requires assessment by the . . , ae . . .
administéring authority?: ’ O (ii) a mobile or temporary ERA for which a code of environmental compliance has notbeen_. _
if'an entity, other than the administeririg- ‘Made - complete Part G of Form 1 ;
” ggpaithority,is thé assessment nianager for the (iii) none of the above : ,
Dvicersn the- administeting- authority is a : . 4 oT
concurrence agency for the appfication in relation . -
. to-this matter. “7 “ - . : Co .
Note: An‘appiication involving ERA 19 and/or, 20 , _— , Lot
will also. rons oFPart K7 of Form: . . :
for approval where an alldgationtindexthe Water / ‘
. Act 2000 is requirbat~ thf» oN ‘ . _— . eo / , .
NY i an eA oo _ ° Continued overteat
~y RECEIVED \7\ | OS
4g sun 2007 = | . | a
~ * . , . se .
\AA HOPQNT COUNTER. . :
iQOSA SHIRE COMAL . : _Y Oo
PPEASE NOTE: Thé assessment manager may refuse to accept an application, which, at the time of lodgement, fails to provide the
Y a \ completed IDAS Assessment Checklist (if applicable). ,
. “ uF — . ee — a? x i ee — at . . . -
OFFICE USE-ONEY-tampicabie fo assessment manager) - no
Ga in pak ae ee DEER Ses SR GwoN a eT : _ : }
RADATERECENEDES| TURREFERENGE NUMBERS ET _
1 The.assessment manager is responsible for assessing and deciding an {DAS apptication. The assessment manager for an application Is prescribed in schedule 8A of the IPA.
2 For additional information refer to Guide 6 ‘Does my application trigger the referral coordination process?" :
3 The ‘administering authsrity' inay be either the Environmental Protection Agency, the retevant local government (for a devolved ERA) or the Queensland Department of Primary Industries and
"Fisheries (for adelegated ERA). : -
. . , Paget - . : ; .Section 6
. : . . | . : x . t
INTEGRATED PLANNING ACT 1997 Oe IDAS Assessment Checklist, Version 20, 2 April 2007"
‘State-controlled.road matters = '| 2.‘ The application involves: (tick applicable boxes) a a
For more information refer to Guides. | — [-](i) development on land contiguous* to a State controlled road and for - ‘\
- Unless you answered "none of the above” to Q2,.| . . , »
“the application triggers referral to the Department (1 (a) material change of use assessable against the planning scheme;
‘ofMain Roads (DMR) as areferral agency. (C] (b) reconfiguring a jot unless - : ‘
In'certain circumstances’ DMR will’be,an advice’. . : . .
agency, while in other circumstances DMR will: * - « the total number of lots is not increased; and .
be aconcurrence agency, « the total number of lots abutting the State-controlled road is not increased;
dclonhowen ikeetiee toy (J (c) operational work (not associated with a material change of use assessable against the
concurrence.agency for the application: planning scheme or reconfiguring a lot mentioned in (b) above}-
. ‘ .| - » associated with access to a State-controlled road; or
, , a _ «for filling or excavation; or ~
‘| "> « involving the redirection or intensification of site stormwater from the land, through a
os 4 __ pipe with a cross-sectional area greater than 625 cm? that directs stormwater to a
- . _,otate-controlled road." :
nT 1 (ii) development on land not contiguous to a State-controlled road and - ,
- — a (J (a) material change of use - so -
; . De * assessable against the local government’s planning scheme; and
noe , SF - + Mentioned in schedule 5 of the IP. Regulation and exceeding the thresholds set by
: that schedule; ,
ee : “8 _. {1 (b) reconfiguring a fot for a purpose mentioned in schedule 5 of the IP regulation _
er "and exceeding the thresholds set by that schedule; .
- ceuks Po , " ne ht * [1 (c) operational work (not associated with a material change of use assessable against ®
o Soe / a) planning scheme or reconfiguring a lot mentioned in (b) above)- mc ,
a a _® assessable against the local government's planning scheme; and; «|
. ce / __® mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
-. PE that schedule. Do
Se oo. [XI (iti). none of the above .
- Clearing vegetation . . , » «= 4/3. The application involves: (tick applicable box/es) . ,
For- more information refertoGuide‘12..-. . O (i) material change of use -
Unless you answered “noné of the.above” to Q3, lanni heme: oO
"+ the application requires assessmentby'the {a) assessable against the planning scheme; .
“Department of Natural Resources and Water: - , (b) on a lot containing - , * : .
' difan agency other:thar’NRW a theiassessrtent . * acategory 1, 2 or 3 area shown on a property map of assessable vegetation; or
“manager for.the application NRWis.a °°. « if there is no property.map of assessable vegetation-for the lot - remnant vegetation;
sgoncurrence agency forthe application in relation (c)_ where’the existing use of the land is a rural or environmental use; and .
fyou ticked 03(i or (i), Your application requires (d) - where the size of the land is 2 hectares or larger - complete Part J of Form 4 *
sreferral.to NRW for-assessment regardless of ~ Cc] (ii) reconfiguring a lot - .
“Whether vegetation clearing is proposed or.niot: _ x . —
i ae’ " - (a) on alot containing a category 1, 2 or 3 area shown on a property map of .
- ee, assessable vegetation or, if there is no property map of assessable vegetation "@
, . ; the lot, remnant vegetation; Ss
. . uO __ {b) where the size of the lot before the reconfiguration is 2 hectares or larger;
. Bef (c) where 2 or more lots are created: and
mo : a ; (d} where the size of any lot created is 25 hectares or smaller - complete Part J of Form 1
(CJ (iii) operational work: -
_ my , {a) for the clearing of native vegetation where the vegetation clearing is made
. yo. _ ” assessable under Schedule 8 of the IPA; and
: oO . (b) not associated with a material change of use assessable against the planning
: scheme mentioned in (i) or reconfiguring a lot mentioned in (ii) - complete Part J of
Form t , - Co,
. [xl {iv) none of the above, . ;
“Strategic portland = =, * 14. The application involves: = -
© Rormore information eter to Guide 11” =! __- [[}.(i) development on strategic port land as defined in the Transport Infrastructure Act 1994 (TI
. Atyou'ticked (i) theselevant Port Authoniy isthe | Act) - complete PartiofForm{ — , :
"+ “assessment mangger forthe application. a a
‘you ticked (i) Queeristarid Transports a. (] (ii) a material change of use that is inconsistent with the land use plan approved under the
- [email protected] forthe-application. TI Act for the strategic port land - complete Part! of Form 1 .
Te TX) (ill) none of the above - | —
. 4 ‘Land contiguous to a State-controlted road is defined in schedule 14 of the IP Regulation fo mean fand - itpart of the tand is within 100m of the State-controlled road; or that is part of a future State- .
controlled road. , _ oO . .
; : Page 2Section 7
"0 AE GRATED PLANNING ACT 1997 _IDAS Assessment Checklist, Version 20, 2 April 2007
Acid sulfate soils 5. The application involves development on land situated in an identified’ local government area
“For more information refer to Guide 10. and where the surface of the land is: (tick appticable box)
* Unless you answered ‘none of the above’ fo Q5, (} (i) below 20m AHDS and the development will involve the excavation of 1000m3or more of
the appfication requires assessment by , it A tor below 5m AHD Lo
. ‘Department of Natural R and Water soil or sediment at or below 5m , or
— RW) ee | 7 ii) ator below 5m AHD and the development will involve filling the site with 1000m3 or more
. ___;ifan agency other than. NRW is the assessment of material oe
" manager for the application, NRW is an advice .
. “agency for the application in rétation tothis =| (ii) none of the above -7
“Majot Hazard facilities of possible“ |6. Does the application involve a material change of use for a major hazard facility or possible
major hazard facilities. = =. "| __ major hazard facility as defined under the Dangerous Goods Safety Management Act 2001?
. For more information refer to Guide:4?. NO . .
:fyou artswered "YES" to Q6, the application XX]
" Fequires assessment by the Departnent of LJ YES - complete Part L of Form? - an
. Emergéney. Seivices (DES). ~ , .
_ . ‘Ifanvagency ottier than OES is the assessment . oo .
. 7 mariager-for the application; DESisa’ 6 , . Lo :
jeoncurrence:agency-for the application in- : co,
elation tothismatier __. oe . oo .
‘Water related development under the |7. The application involves: oS vO
“Water Act 2000 , (1 (i) operational work, for taking or interfering with water under the Water Act 2000, that is:
‘For more information about items (a) — (f, refer (tick applicable box/es) .
‘ ‘to Guide-15. Formoréinformation about item |. 7 . . . — ;
. Q), réfer to Guide +4: Does my application [[] (a) in a watercourse, lake or Spring, (eg. a pump, gravity diversion, stream re-direction, weir or
unvoNe assessment ofareferabiedam? =) - dam) - complete Part Kz, Ka, Ka, Ke, or Ka of Form 1 whichever is applicable;
Q vie: you answered “hone. of the above" to:Q7, [J (b) for an artesian bore anywhere in the State, no matter what the use - complete Part °
- the’ application: requires assessment bythe - . . . uo :
3 Debartiient of Natural Resourées and Water Ks of Form 1, . - .
. 7 NRW) ey. os [J (c) fora subartesian bore, in declared subartesian area’, or in a certain area covered
alfan agency other than NRW is the assessment . by a water resource plan, for use for purposes other than stock and/or domestic
Smanagét for the application; NRWis'a us fete Part K; of Form f: . .
____ #ebficufrénce’agency: for-the application in , © - complete Pan Kr of Form 7, . . * |
“relation to tis matter. (J (d) for a subartesian bore, in certain declared subartesian areas, for use for stock
« ue a oe and/or domestic purposes - complete Part K; of Form f:
. Se [_] (e) for taking overland flow water in certain areas covered by a water resource plan
z . - — complete Part Ks of Form 1:
; )(f} for interfering with overland flow water in a drainage and embankment area -
, wo. complete Part Kioof Form 1 . .
; . an ‘ (-] (g) for constructing a referable dam® or works that will increase the storage capacity =.
; Lo . of-a referable dam by more than 10% - complete Part Ks of Form 1; or
oO oon _ §I (i) none ofthe above. 7
"Removal of quarry thaterial froma |8. Does the application involve development for the removal of quarry material from a watercourse?
swatercourse — . requiring an allocation notice under the Water Act 2000? " ,
“For mhdre iniformationrefer to Guide 16. . NO - , : . .
you answered “YES” to'Q8, the application MM Do. . ; : .
us réquires assessment by the Department of (J YES - complete Parts Kr and G of Form 1 :
__. BH Natuial Resourves and Water (NRW). cs
“lf an-agency othér than NRW is the assessment |. ae
' — :ffiatiager for the application,NRWisa =.
‘concurrence agency for the application in ‘ . oan
"> Telation to this matter: : ’ | ‘
é NGté: PartG of Form’ istequired tobe : , :
: completed as thé activity of removing quany ~ - . , ; .
. material from @ watercourse is also an :
_ Environmentally Relevant Activity (ERA): ; -, ‘ . :
- . . « . . ;
. 5 The identified local government areas are: Aurukun; Bowen, Brisbane, Broadsound, Bundaberg, Burdekin, Burke, Burnett, Caboolture, Cairns, Calliope, Caloundra, Cardwell, Carpentarla, Cook,
Cooloola, Dounglas, Fitzroy, Gladstone, Gold Coast, Hervey Bay, Hinchinbrooke, tsis, Johnstone, Livingstone, Logan, Mackay, Maroochy, Maryborough, Mirium Vale, Momington, Noosa, Pine Rivers,
Redcliffe, Redland, Rockhampton, Sarina, Thuringowa, Tiaro, Torres, Townsville, Whitsunday.
. 6 Austratian Height Datum (AHO). / mo . : .
7 The declared ground water areas are listed In Guide 13 Develooment in a dectared catchment area. . , _
8 Referable dam is defined under the Water Act 2000. .
“9 Watercourse is defined in sch 10 of the IPA. :
; , Page 3 . .
. . . . . :Section 8
: . ry ' Vy .
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 20, 2 April 2007 ~
Operational work that is tidal work or |9.__ The application involves operational work that is: ( tick the applicable box/es) *
a work in Coastal management district C1 (i) tidal work" as defined under the Coastal Protection and Management Act 1995 (the :
; move information about prescribed tidal work in Coastal Act) that is not prescribed tidal work - complete Part M of Form 1, OF . .
ne goverment tidal areas refer to Guide 24} [7] (jj) tidal work that is prescribed tidal work" other than in a canal'2 -complete Part P of Form 1; of
’ Unless you answered ‘none ofthe above” to Q9, | ve . ut loge! . ‘ .
the apprcaton requires assessment by the CJ (iii) carried out within a coastal management district under the Coastal Act and for - complete
-Environmentat Protection Agency (EPA). | Part M of Form 1 if any box/es (a} fo (i) below are ticked. .
Han agency other than EPA is the assessment [1] {a) constructing or installing works in a watercourse between MHWS and HAT (ie.
: ree yet athe aplication a other than those works in tidal water) where the development has been determined not
relation to this matter, to be assessable against the Water Act 2000 ; 7
a {ca goverment the assessment manager , [] {b) constructing a canal12 intended. to be connected to tidal waters;
lor all prescribed tidal work. . ape .
[J {c) constructing an artificial waterway;
, [(-} (d) reclaiming tand under tidal water; .
— [1 (e) disposing of dredge spoil or other solid waste material in tidal water;
, oO oo, ~ [J (f) ” interfering with quarry material on State coastal land above high-water mark; 7
. So : ‘ [-] (9) draining or allowing drainage or flow of water or other matter across State
. ‘coastal land above high-water mark; ; Oe
(J (h) removing or interfering with coastal dunes on land, other than State coastal land,
. ‘that is in an erosion prone area and above high-water mark;
od — (J (i). constructing a bank or bund wall to establish a ponded pasture on land, other
oo than State coastal land, above high-water mark; or oo ©
: (iv) none of the above. os i my
~Operational-work below high water .!10. The application involves:operational work that is: (tick the applicable box/es)
maT. nformatog ele to Guide 18. For (1 {i) tidal work’? as defined under the Coastal Protection and Management Act 1995 (the
" moreiinformation about prescribed tidal tidal work in _ Coastal Act) that is not prescribed tidal work = complete Part M of Form 1; or
bocal goverment dal areas refet.to Guide 24. [71 (ii) tidal work that is prescribed tidal work" - complete Part P of Form 1; or
ey Unless you answered "none of the above’ to coy ws ye :
Q10, the application triggers referral to [-] (iii) carried out within a coastal management district'® under the Coastal Act and for -
Queerisland Transport (QT) (Maritime Safety i j i i Storial in ti _
‘Qld) as a concurrence agency. . C] (a) asposing of dredge spoil or other solid waste material in tidal water - complete Part
: of Form 7;
Local government is the assessment manager . ;
- for all prescribed tidal work, ~ [J (b) reclaiming land under tidal water - complete Part M of Form 1; of
: . (J (c) ° constructing a canal12, if the canal is associated with reconfiguring a lot -
_ ‘ - complete Part M of Form 1; ‘
_— (iv) none of the above. Te ;
"Coastal management ‘111. The application involves: (tick the applicable box/es) = ‘
For mare information refer to Guide 18. [J (i) amaterial change of use assessable under a planning scheme involving operational
Ot Re opplcalon ronates assessment by the work carried out completely or partly in a coastal management district'§
"Environmental Protection Agency (EPA). LJ (ii) a material change of use assessable under a planning scheme involving building @
tf an agency other than EPA is the assessment - work, carried out completely or partly in a coastal management district that is -
manager for the application, EPA is a : : . .
concunence agency for the application in * the construction of a new premises with a GFA" of atleast 1000m?_ .
relation to this matter. * « the enlargement of the GFA of existing premises by more than 1000m? .
, ; — . : C1 (ili) reconfiguring a fot assessable under schedule 8 of the PA where the land is situated
Do. Lo completely or partly in acoastal management district = =
; - C1) (iv) reconfiguring a lot’? assessable under schedule 8 of the IPA and in connection with
’ : the construction of a canal12 - complete Part M of Form 1 .
4] (v) . none of the above , ; .
10 ‘Tidal work is defined in sch 10 of the IPA. O . co
11 Prescribed tidal work is defined in the Coastal Protection and Management Regulation 2003 and includes certain tidal works completely or partly within a local government tidal area.
12 Canal means canal as defined under the Coastal Profection and Management Act 1995 . .
t3 Tidat work is defined in sch 10 of the IPA. .
14 Prescribed tidal work is defined in the Coastal Protection and Management Regulation 2003 and includes certain tidal works completely or partly within a iocal government tdal area.
15 Coastal management district is defined in sch 10 of the IPA and means a coastal management district under the Coastal Protection and Management Ac{ 1995, other than an area declared as a° :
coasta! management district under section 47(2) of that Act. . _ , : , 7
. 16 GFA is defined in sch 14 of the IPA lo mean the gross floor area. For-a definition of how to calculated GFA, go to the planning scheme against which the application is being assessed.
a "17 Under $117 of the Coastal Protection and Management Act 1995, an application for reconfiguration, where the reconfiguration fs associated with the construction of an artificial waterway, must be
, accompanied by the application for the operational works to construct the artificial waterway. . . :
. . Page 4 : , ,Section 9
“ . INTEGRATED PLANNING ACT 1997 . : IDAS Assessment Checklist, Version 20, 2 April 2007
, Development within the limits of a 12. Does the application involve development below high water mark'® and within the limits of a port
“ port = . under the Transport infrastructure Act 1994? -
. For more information refer to Guide 18. For Xx NO : ,
information aboiit prescribed tidal work refer to: - . :
. Gide 24. _] YES - complete Part M of Form 1, or Part P of Form 1 if the work is prescribed tidal work
. you answered “YES" to Q12, the application | ;
striggers referral to the Port Authority. . . .
The Port Authority is'a cancurtencé agency if the TS . m :
_ development is - . . , . : .
; _ © within 200i of a shipping channel or an entiy . . : ——
and exit shipping corridor-for the port . . :
. “@ within 100m of 4 swing basin,.a commercial . ‘ . .
‘ shipping wharf, a mooring, anchorage or spoil ; : , .
grounds;- a | ; . me : . 7
- * within 1000m of a planned port facility ; co i -
_ ‘identified in’d land-use plan approved under . . ms
* the Transport Infrastructure Act 1994. . Oo . , . . :
In all other situation the Port Authority is an : : ‘
advice agency. a Tak hat eae ect tea EO een a tt
_ Marinas : we 13. Does the application involve operational work that is tidal work for a marina’? with more than 6
For more information refer to Guide18. For vessel berths? - cs . - a
information about. whether a'marina is prescribed . - . .
"tidal work refer to Guide 24. The local NO . FO , .
“government is the assessment mariager for all (J YES - complete Part M of Form 1, or Part P of Form 1 ifthe tidal work is prescribed tidal work ;
prescribed tidal.work. : . . : os - :
, if you answéréd “YES” to Q13, the application : . :
‘triggers referral.to Queensland Fire and.Reséue * , ; : :
, @ serie acer advice‘agency. eo . eee, aeons igeemete, esate any = cw . ce peg : .
Tidal works.in Strategic port land:tidal| 14, Does the application involve tidal works within a strategic port land tidal area?
bali A woes DJ NO - . . . ; : .
JFOF More information fefer to Guide 18, ; J YES - complete Part M of Form 1 ~’-
Unless you.answered“NO” to Q14, the retevant . : . . ; ;
‘Port Authority is the assessment manager for the . . : ‘
‘ application and the Environmentat:Protection / . . :
‘Agency (EPA) and Queensland Transport (QT) : : .
2 conourrence agencies forthe application, fe ee ete yt
_ “Heritage 7 . | 15. Does the application involve.development in a heritage registered place as defined under the ~
‘For further information refer. to Guide 19. Queenstland Heritage Act 1992?
* Ifyou answered “YES” to Q15, the application Ano : . :
——- ~ triggers referral-to the Queensland Heritage ° . , : Do,
: ‘Council as concurrence agency for the C] YES = complete Part C of Form 1 co
. pplication. * ° > ooo : ;
. ‘ . : : ves: . . \ . . . .
“Ufiless you answered "none of the abave” to en e application ones (ret applicable bene®) inst th . lanni h d the lot sh ; :
“ Q15(b), the application involves referral to the (i) amaterial change o use assessable against planning scheme and the lot shares a
- “Environmental Protection Agency as an advice common boundary with a protected area or registered place under the Queensland ;
. agency for the application . ; Heritage Act 1992; .
, ; C4 (ii). reconfiguring a lot if the lot shares a common boundary with a protected area or
@ . registered place under the Queensland Heritage Act 1992:
- (iii) none of the above. _ oe
Declared catchment areas 16. The application is in an area declared to be a catchment area under the Water Act 2000 and SO
For more information, including a list of the involves: (tick the applicable box/es) Ce ; .
-Geclared catchment areas within Queensland, . ‘ee : . : sy .
; refer to Guide 13. : L){i) reconfiguring a fot if any lot resulting from the reconfiguration is less than 16 hectares;
Unless you answered “none of the above” to LJ (ii) development assessable against the planning scheme involving the establishment or
Q16, the application requires assessment by the expansion of a waste water disposal system, other than a disposal system for carrying
Department of Natural Resources.and Water. . . . ns . .
(NRW). ‘out an environmentally relevarit activity under the Environmental Protection Act 1994: .
If an agency other than'NRW Is the assessment rg) (iii) none of the above —_
‘manager for the application, NRW is a , . ;
: concurrence agency for the application in ; . : . : : .
relation to this matter. oO _ ; 7 ae oC , - . .
"18° High water mark.is defined in the Coastat Protection and Management Act 1995’and means the ordinary high water mark at spring fide.
19 Marina is defined in the Transport Operations (Maritime Pollution) Regulation 1995. . .
20 Strategic port land tidat areas are the areas generally 50 metres’ seaward of high water mark adjacent to strategic port land. ‘ . : /
. . . Page 5. . :Section 10
, / , 4 woh.
- INTEGRATED PLANNING ACT 1997 ee ___IDAS Assessment Checklist, Version 20; 2 April 2007
Contaminated-land , 17. The application involves: (tick the applicable boxes) : so.
Applications involving material change of use ; ‘ hi i _ - .
| ‘andi of reconfiguring a lot may bigger this LJ {i) reconfiguring a fot for which all of part of the premises are
_feferral, (a) premises mentioned in the IPA, schedule 8, part 1, table 2 - :
For mare information refer to Guide 5. __» item 5, including the exemption otherwise provided for by paragraph (d);
Unless you answered “none of the above" to « item 6, including the exemption otherwise provided for by paragraph (e); or. -
Q17, the application requires assessment by the ej i ing-the exemption wi ‘ ini ivi :
“Envgonmental Protection Agenoy (EPA). tan os en 7, including the exemption otherwise provided for a mining activity or petroleum
agency other than-EPA is the assessment ac ity, or . . . . , , :
manager for the application, EPA willbe a (b} in an area for which an area management advice has been given for unexploded
concurrence agenty for the ‘application in ordnance - complete Part N of Form 1 se
relation to this matter. . . . a
C1 (ii) a material change of use -
. : | {a) made assessable under the IPA, schedule 8, part 1, table 2, items 5 to 7; or
. . (b) assessable against the planning scheme and if all or part of the premises isin an area -
| . for which an area management advice has been given for unexploded ordnance -
mo complete Part N of Form 1 a
eo a ed (iii) none ofthe above
“Electricity infrastructure — "| 48. The application involves: (tick the applicable boxes)
Regulator refer to schedule 2of the IP [J (i) reconfiguring a lot where any part of the lot is — ; me
Wiiske woe re “| « subject to an easement in favour of a distribution entity or transmission entity under the =~
Unless you-answered “none.of the above"to «. . ; . rere
_ °Q18;the application triggers referral to the °”” Electricity Act 1994 and the easement is for a transmission grid or supply network under
agency to which'the-easemientis granted in ‘ that Act; or —_
favour of as advice agency.” *' situated within 100m of a substation site; 6
ae 2 — + _] (ii) a material change of use, assessable against a planning scheme and not associated ;
Phy ee oy _ with reconfiguring a lot if -
mo ys - » any part of the premises is subject to an easement in favour of adistribution entity or
7 4. _ transmission entity under the Electricity Act 1994 and the easement is for atransmission —_-
. grid or supply network under that Act; and - ‘ : .
, * any structure or work that is the natural and ordinary consequence of the use is, or will be,
ot . - . located wholly or partly in the easement; © , :
; - i, a (1 (iii) a material change of use, assessable against a planning scheme and not associated
. oe 7 with reconfiguring a lot if any part of the premises is situated within 100m of a substation
: , . Site; . . —
_ _ Cl (iv) operational work that is filling or.excavation assessable against the planning scheme,
. not associated with reconfiguring a fot, if - ; |
: _ * any part of the premises is subject to an easement in favour of a distribution entity or
. . . . . transmission entity under the Efectricity Act 1994 and the work is located wholly or partly in
= - oF _ the easement; . , ,
Bee ‘ e the work is located wholly or partly within 10m of a substation site; ;
ee Es [A (v) none of the above. : a
, ‘Land:designated'forcommunity’:: “119. Does the application involve development assessable against the planning scheme and on any
_ Infrastructure designated for community infrastructure? = ,
Applications involving-developmenton land = | ye : '; a . ‘ .
designated for community infastucture may. (i) intended to be supplied by a public sector entity; and . . . .
“liggerthisteferal, (ii) on land not owned by or on behalf of the State; and ue
‘For more information refer-to schedule 2 of the Se : Lo ,
; IPReaulaton. ~~ |. (iii) other than development ~ a
If you-answered “YES"to-Q19;ithe application -| _ (a) for the designated purpose; or oa Le . a,
“ ”_ Fequires-assessment by ‘the. chief-executive of. : . : ‘ .
the department administering the’Act authoring, (b) carried out by, or on behalf of, the designator. Co a,
-the development for the designated purpose. NO , -
' * lfani agency other than the designatoris the: ‘ ch
___ asSessmerit manager for the application,the O Yes . : :
. “designating-agency-witl be a.concurence af? . ‘ . : _- .
, agency for the application in relation to this - ; ,
oe a so , Page 6 ; aSection 11
"INTEGRATED PLANNING ACT 1997__-__ . _ IDAS Assessment Checklist, Version 20, 2 April 2007
~--SEQRegional Plan 20. The application involves (tick applicable box/es) -
* . "For more information refer to schedule 2 of the C) (i) amaterial change of use of premises - - .
_ “Rp , in a Major Development Area in the Urban Footprint for :
- Refer to Chapter 2, pat 5A ard schedule 10 of. (a) ina lajor Deve. opmen ’ @ Urban Footp ;
~ “the intearated Ptanning Act 1997, and schedule - (9 (i) anurban activity -
suo Provisions for eleva a, {1} in an area included in a structure plan where the IPA, section 3.1.6
iss you dione "nne ofthe atnetto | applies; —— oe
“Saran lication requis assessment by the [7] _ in an area not included in a structure plan where - oo
yy ree : aa ne omen (OUM). | . + the IPA, section 3.1.6 applies to the application for the material change
» ee ° of use; or Lo
re — e the premises exceeds 10,000m2; or .
be ah oe ‘#’ the gross floor area (GFA) on the premises will exceed 10,000m2; or
yoo i 7 . . | impact assessment is required under the relevant planning scheme’
- ee . C] (ii). intensive animal husbandry, or co -
- , ~) (ili) residential devetopment involving a rural residential purpose
- i ao. oo : . ‘(b) in the Regional Landscape and Rural Production Area for -
- ne wo, [) (i) an urban activity and not specified in section: 2:4(2); or
. Was - ~~ [J (i) residential development involving a rural residential purpose and not
be. . So specified in section 2.6(2) .
Be sf ~. (c) in the Rural Living Area for an urban activity and not specified in section. 2.8(2);
@:. to . oe . (d) in the Investigation Area for - .
wo CJ: (i) an urban activity and not specified in section 2.10(2);
is ware : CD fii) residential development involving a rural residential purpose and not _
per te, os specified in section 2.12(2); or _ 4
op , CL) (ii) intensive animal husbandry
ity et C1 (ii) reconfiguring a lot- ° . .o
my : ae . On land in a Major Developnient Area in the Urban Footprint that is:
Bote. . a _ (a) not included in a structure plan; and
Looe {b) not specified in section 3.1(2).
oo oo (X) (iii) none of the above _°
- {Fisheries matters 21, The application involves: (tick the applicable box/es) .
{Formofe information refer to schedute 2of the tP [| (i) an assessable material change of use for aquaculture - complete Part O; of Form 1; .
. jRequlation. ‘ . . - _ ,
- * “Unless you answered “none of the above" to [_J (ii) assessable operational work that is the construction or raising of a waterway barrier -
“021, the application requifes assessinentt by the complete Part O3 of Form 1; :
. Fae ition Inusies ae Fisheries CJ (ii) assessable operational work completely or partly within a declared fish habitat area-
-if an agency other than DPISF is the assessment complete Part Oz of Form 7, a o .
Onsen the “bpscaton, Or isa CJ (iv) assessable operational work that is the removal, destruction or damage of a marine
concurrence agériéy for the application-in (| : . : . :
Lo _ Felation:to items (}) - (iv) and an advicé. agency - P fant complete Pait Or of Form 1, , co
“in‘rélation to item (v).. (J (v) development assessable under the IPA, schedule 8, part 1, on land that adjoins a -
a declared fish habitat area: .
ge —— ~ , PA (vi) -none of the above. a .
| , Fo Page? . — . moSection 12
; ; ~ om wed ty
"INTEGRATED PLANNING ACT 1997, . IDAS Assessment Checklist, Version 20, 2 April 2007
- Integration of land use and public 22. The application involves: (tick the applicable box/es}-— mo
transport . : : , Co . .
For more information refer to Guide 23, schedule. (C) (i) a material change of use assessable against the planning scheme for a purpose
8A of the IPA, & schedule 2 of the IP Regulation. | ~ " mentioned in schedule 13C of the JP Regulation and exceeding the thresholds set by that
Unless you answered “none of the above", the schedule. , . . .
- application triggers réferral to QT as a . . .
_ Concurrence agency. - oe . [1 (ii) reconfiguring alot— ,
me - . - ’ [J(@) __ onland that is completely or partly within a public transport corridor, and the
pO total number of lots increases; |
, (“J (b) on land that is completely or partly within a future public transport corridor or
an airport's public safety area, 0
DC 7 " [1 {c). on fand that is within 400m of a public passenger transport facility or a future
a : TS " public passenger transport facility, and the total site area is 5000m? or greater;
oO , _ (1(4) . for a residential purpose within the 25 ANEF contour for an airport; , .
. * (1e) _ fora residential purpose resulting in 100 or more allotments. .
: |. C1 (iii) operationat work assessable against the planning scheme, but not associated witha -
- ee ik material change of use mentioned in (i) above or reconfiguring a lot mentioned in (ii)
a oO mt “above, on land that— ; ;
oo . po! [-} (a) is completely or partly within a public transport corridor or a future public
; — . . transport corridor; >
. . i — [J (b) _ will result in work that encroaches into an airport's operational airspace.
Co (iv) none of the above. = , So , -
Raitway safety and efficiency . . _ 23. The application involves: (tick the applicable box/es)— = .
. For more information refer to Guide 23, schedule. J (i) a material change of use assessable against the planning scheme for apurpose =
. , BAotIne IPAS schedule 2-af he Regulation, } mentioned in schedule 13D of the IP Regulation and exceeding the thresholds setby that
Unless you answered “none of the above”, the . oF
. application triggers referral to QT asa _ schedule. . . ’ ae
concumence agency. = _ D1 (i) reconfiguring a tot— | ,
. oo (1 (a) on land that is completely or partly within a future public transport corridor,
; ; mo . future railway land or a railway tunnel easement; .
SC , - [)(b) _ on land that is within 400m of a Citytrain passenger railway station or a future
, Citytrain passenger railway station, and the total site area is 5000m? or
, : : greater; en? ; . : .
sO _ - [J (c} on land that abuts rail corridor land, commercial corridor land or future railway
— oo , - dand, and the total number of lots increases;
a (J (d)} on land that abuts rail corridor tand, commercial corridor land or future railway
: land.and an easement abutting the corridor or future railway {and is created;
Lo. [_]{e) on land that is completely or partly within 100m of, and abutting an approach
Co , an to, a railway level crossing, and the total number of lots increases; .
po (J (f) for a residential purpose resuiting in 100 or more allotments.
[I (iii) operational work assessable against the planning schéme, but not associated with a
. material change of use mentioned in (i) above or reconfiguring a lot mentioned in (ii) @
- ; ot above, involving extracting, excavating or filling greater than 50m3, on tand that— ,
; : { ] (a) is completely or partly within rail corridor land or commercial corridor land, and ;
. , se . : the work is not for rail transport infrastructure or other rail infrastructure; ‘
sO (7 (b) _ is completely or partly within future railway land, or a railway tunnel easement;
soos . [J (c) abuts rail corridor land, commercial corridor land or future railway land, and
vos oo oS -the work is within 25m of the railway boundary. -
mo, * PBd{iv)noneoftheabove. Lo i
"Moonie to Brisbane pipeline 24. The application involves the easement for the construction or operation of the Moonie to *
. For more information refer to schedule 2of the IP Brisbane strategic pipeline, and ‘involves: (tick the applicable box/es|—~ .
Requaton _.. | (1 @ amaterial change of use assessable against the planning scheme atid not associated --
soptesion tiggersretonatto te holder o the with reconfiguring a lot, and any structure or work will be located wholly or partly inthe.
* pipeline licence No 1 issued under the Petroleum easement. : ;
. Act 1923, currently Santos QNT Pty.Ltd, for ~ [7] (ii) reconfiguring a fot -
. advice. : ie . : ' . .
[_].(iii) operational work assessable against the planning scheme, thats filling, excavation,
. compaction, drilling, boring or piling not associated with a reconfiguring a lot, and the
‘ DO work is located wholly or partly in the easement. .
- [4] (iv) none of the above. Co oo
, oo. : : PageB , ,Section 13
“7+ “INTEGRATED PLANNING ACT 1997” IDAS Assessment Checklist, Version 20, 2 April 2007.
Koala habitat area 25. The application involves: (tick the applicable box/es)— a
rmaale 2 ote P Regie and * [1() a‘material change of use of premises in a koala conservation area or koala
Unless you-answered “none of tie above’, the . Sustainability area made assessable under a planning scheme, that is not for a domestic
, - application requires referral to the Environmental ©. activity and willresultin- .
_ Protection Agency as a.concurence agency.” "| ° [_] (a) clearing of native vegetation over an area greater than 2500m?;
4 _ (_] (b) anew building and any reasonably associated structure with a total footprint. .
- , greater than 1000m?; :
. 1. (-] (c) an extension to an existing building and any reasonably associated structure if
Oo . the extension has.a total footprint greater than 1000m?; ,
, - ue - (1) (d) extracting gravel, rock or sand from an area ‘greater than 5000m2;
a 1] (e) excavating or filling an area greater than 5000m?; .
oe , (J (f} additional traffié in a koala conservation area or koala sustainability area,
- , . _ between 6p.m. on a day and 6a.m. on the following day.
Se ("J (ii) reconfiguring a lot in a koala conservation area or koala sustainability area that will
oO - resultin- —
. SS / (_] (a) an increased number of lots; Oo - ,
oo, ; [-] (b) clearing of native vegetation over an area greater than 2500m?, -
re co |. C1 (iii) operational work ina koala conservation area or koala sustainability area made
oS assessable under Schedule 8, Part 1, Table 4, items 1A to 1G (not associated with
, De - reconfiguring a fot mentioned in (ii) above) that will result in the clearing of native vegetation:
Se over an area greater than 2500m?, 2 -
@ (_} (iv) operational work in a koala conservation area or koala sustainability area made
; , " - assessable under a planning scheme {not associated with a material change of use
7 no, mentioned in (i) or reconfiguring a lot mentioned in (ii) above) that is not for a domestic activity
and will result in - . ,
a . [1] (a) clearing of native vegetation over an area greater than 2500m?;
7 C1 (b) extracting gravel, rock or sand from an area greater than 5000m:?;
: ‘C1 (c) excavating or filling an area greater than 5000m?,
[X) (v) none of the above. oO . _
- Wild river.area " |26. Does the application involve development in a wild river area declaréd under the Wild Rivers Act:
, For more information, refer to Guide 27. - 2005? oO a TS .
; you answéred YES to. Q26, you mustalso | Ga No
complete section 2 ofthis checklist. This wil . 7 : , : .
ehable you'to determine:if your application.can (1 YES oo : -
‘proceed in a wild river area and which referral _ : ‘
, agency will assess your application against the . . tee : .
Wild Rivers Code, or ifthe proposed . . : . vs
: development is “prohibited” in-a wild river area. . ; me .
Nota: Development can be ‘prohibited’ in a wild : 7
_ Fiver-erea because the application cannot be . : . ‘ .
. accepted by the assessment manager, oo i ‘
@ Preliminary Appfoval _ ° | 27. Does the application involve a development for which preliminary approval is sought under
"Ifyou answered YES to Q27, the application Section 3.1.6 of the Infegrated Planning Act 1997? Se
triggers referral to the Department of Local ‘ : o .
Government, Planning, Sport and Recreation as XX] NO . .
“an advice agency. oo CIYEs: : .
Wetlands , 28. The application involves: (tick the applicable boxes) - sO
, Lo a 7 LI (i) ‘amaterial change of use, other than for a domestic activity, assessable against the
ofa single residence on alt and sey reesovably | planning scheme that is in or within 100m of a wetland; a .
. associated building of structure, Examples of a iii reconfiguring a lot— ~ . , ‘
; a smcure vat could be reasonay . In or within 100m of a wetland that will result in
. associated with a single residence include: - . . , Fi .
caretaker’ residence granny fa bulding or - _()@) more than 10 lots being created; or oo
structure used for a home business. - _ L)(b) lots tess than 5 hectares;
(iii). none ofthe above: - oo
~ Note: Wetland:is defihed in the Integrated . , mo,
"Planning Regutation 1998. ; : a
_ Unless you answered:*none of the above’ to , : . : ,
. Q28, the application involves referral to the : . ‘
Environmentat Protection Agency as an advice .
‘agency for the application. Of ee a
a, . . "Page g : sO .Section 14
. . , woe, : os
INTEGRATED PLANNING ACT 1997 : ‘ IDAS Assessment Checklist, Version 20, 2 April 2007
Conservation Estate 29. The application involves: (tick the epplicable box/es}— : my - =
. “Urban purposes is defined inthe integrated. | CO (i) a material change of use for urban purposes that is in or within 100m of any of the. ;
Planning Act 1997 as “purposes for which land is , following - : . . , '
eed n A spateg resection Sones 7 ‘ [J (a) aprotected area, forest reserve, critical habitat or area of major interest under
purposes, but not including-environmental, - _ the Nature Conservation Act 1992;; . . . .
conservation, ‘ural, natural-or wildemess area [2] (b) a State forest or timber reserve under the Forestry Act 1959:
PAPO Bo (1 (c) amarine park under the Marine Parks Act 2004;
" ”. *Unless'you answered “none of.the above"to° (J (d) arecreation area under the Recreation Area Management Act 1988;
: Q29, the application.invotves:referral to tie’ > 5 i ‘ 5 yn ‘
Envionmental Protection Agency as an advice. [J (e) a world heritage area listed under the World Heritage Convention; .
" agency for the application:” [-](f} Brisbane forest park under the Brisbane Forest Park Act 1977. |
Coa oe, 1° [1 fil) reconfiguring alotif- ; - me
moe ray 1 (_}{a) any part of the lotis situated in, or within 100m of, any of the following —
4 re od. LJ (i), aprotected area, forest reserve, critical habitat or area of major :
J Ss . _ interest under the Nature Conservation Act 1992; sO,
_ . [-] (ii) a State forest or timber reserve under the Forestry Act 1959; -
. Dt as |e , [] (iii) amarine park under the Marine Parks Act 2004;
Sy oO [J (iv) a recreation area under the Recreation Area Management Act 1988;
mo, oe o C](v) — aworld heritage area listed under the World Heritage Convention;
a gael . Brisbane forest park under the Brisbane Forest Park Act 1977; and
By a ~ [] (b) the reconfiguration involves more than 10 lots being created, or any lot
. wid agyeg te? resulting from the reconfiguring is less than 5ha; mo @
ae Rae Be iii none of the above. . ; ”
; oo oN .
Loe . o Page 10 . co wo,Section 15
° nicne SEL
eo : . : ce ‘NV ‘<, »
Y is - a ~y _ : RECE ye 5 =
- eS| Q| NO et YUN 2997
- > | = | FRO RE Cou i }
ta . 1 Coun Ten /
aAWindowssolutions) iim
@
niche design window solutions
po box 1030 (43 rene street)
noosaville, qld 4566
t 5474 2255 f 5474 2270
[email protected]
|Section 16
estes!
. ee .
niche 4, 2 ;
| design, ps qa,
a
Ree eae RECEIVED on 2
Dennis Wallace | 44 JUN 2007 ,
Noosa Council \ © ;
; 7% MOOSA SHIRE COUNCIL
Planning Department \ Le FRONT COUNTER
XB A June 2007
By Hand Nv
~f 6 1 8 }
- | Home Based Business — Type 2
Application 67 Saltwater Avenue, Noosaville
Dear Mr Wallace
. I have now completed the documents which you provided to me, these are
all attached to this letter.
@ This application is for a home based business, type 2.
. No 67 Saltwater Avenue is to be my family's primary residence; we are in the
process of buying it from the current owner. |
The part of the site that we intend to use for my home based business:
e Is marked on the attached plan as Studio
e This is an existing structure
e We do intend to insert a door into the front wall of the structure and
have marked this on the attached plan
e We will be using the existing built form and do not require any new ~
works
My home based business is:
e An interior design company currently focused on window treatments
e« The studio is to be used for demonstrating to prospective clients the
© range of styles and also fabric samples that we have available
e This is as part of the total sales process enabling prospective clients.
to see and feel our products for themselves
e In order to complete a sale we would visit the home of the
prospective client for a consultation, measure and quotation
e We install the blinds at the clients home
e We donot manufacture at home
e We buy in our products from our suppliers, firms such as Silent Gliss,
Verosol and Designed Blinds Australia
Having read the business uses code I do believe that we comply. I have
listed below the key points to ensure that I have understood the code
correctly.
Dene aa TAPP COT
[Office (07) 5474 2255 9M Fax] (07).547412270
Buns, Werosdl ‘Ashiilenteliss) yr A |
DESIGNED ® .Section 17
es
niche .
design | |
: |
. Specific outcome Acceptable solutions Compliance .
Probable solutions
Extent of use and $24.1 (a) detached house in | We comply (a)
residential amenity | a town / village business is mo
a 024 level of impact | under house or associated :
of business is minor | structure, or |
’ 4 with regard to _| (6b) Detached house in any }
amenity of area other. area provided , .
oS AND associated building not
within 6 m or boundary, or
(c) From within dwelling unit
for any other dwelling unit .
025 remains — $25.1 towns and villages We comply (a) 50 m2 is
ancillary to the (a) max 50m2 used for net floor area, i:e.,
@ residential use of business excluding parking, | excludes toilets and
the dwelling unit and store for dwelling
. AND (b) max of 3 people on site ‘
026 evidence of for business purposes at any | see plan
business use is one time (operator,
minimal employee, client), not more
than 1 of 3 is a client
$25.2 other areas max
300m2
Visual amenity $27.1 only goods We offer a service and
027 activities manufactured on site are do not manufacture on
conducted are offered for sale by business | site.
appropriate to 27.2 no vehicle servicing
residential area .
Traffic and parking | S28.1 business is directly $28.1 yes
028 traffic impacts | accessible from a sealed
are no greater than | road . .
that which might be | S28.2 minimum of 4 parking | S 28.2 two garage, 2
@ expected in the spaces are provided on site. | open
zone in which use is | Visor spaces may be in
located tandem with garages or
carports 28.3 we comply - 2
28.3 Commercial deliveries | deliveries by courier van
or collections are limited to | per day
. a vehicle no bigger than a ,
courier van and no more
than 2 deliveries or
collections per day.
Services and $29.1 no greater load is We comply
utilities imposed than would be
029 do not impact | reasonably expected from a
on capacity of detached house
, infrastructure ,
lOtficel(07) 547422559 bax] (07),5474 2270 Email [email protected])
suns’. Verosol ‘AsSSientalies) v
AUSTRALIA® Ma |Section 18
a: ae
° es |
—— .
niche
design
3
— Hours of operation | $30.1 do not operate We comply, Mon to Fri . |
~ . +. * ‘| Q30 hours do not. | outside of 8-6 Monto Sat |9.00amto 5.00pm - , vets
oe cause " excluding public holidays i
environmental | }
nuisance to J
. neighbours .
Signage $31.1 not more than one We will comply an
: O31 unobtrusive sign
. and in keeping with | - fence, wall of freestanding oo —_
amenity of max 750mm x 400mm ot
neighbourhood (0.3m2) - -
. - displays name, occupier, :
occupation, contact details
- no movement or
) ‘illumination
_ You did mention the possibility of fast tracking this application. If this is at all
possible I would be grateful.
If there is any more information that you require please do not hesitate to
' contact me. :
Yours Sincerely
Peter Sel r fo 3
Director ‘ ce
RE A ee
6 Attachments: CEIVEN <a
1 1
Form 1A ~- Common Details o 4 JUN 2007 an
. Form 1D - Material Change of use — ree SHIRE Councn 3 /
Form 1 - IDAS assessment checklist . TOOUNTER = /
Plan \e Sf .
| WL OPE
. NY
arr e at nee Aafia f\ Gyn Fal
MO fice}(07) 5474, 2255 MME raxt (07).5474.2270 mm Email[ peter @nichedesign:com.au)
| ae". Verosol ‘Sastianams df
AUSTRALIA® e€roso SilentGliss aut |Section 19
A
ue , .
2 3 Be wy =
Tre A
4a HR A Ona } em
. 4 game Het wo: ae : .
~ g He 4 Keane fe SU ya
. eA fis. Ne i Sera fom
" a 1 gees AS EY
af . pees a poy ies I" so
FI alee Sor io 7 By
ve ; Dee My * gee im QO | : si} f
Ie SNES el OE a. Bind.
i ff ee whe tg a tae Sa oe vs a — i
iy * eee 4 _ = Ll |
ase . i fs oa ee Abe Be - } t
i | Sc Se nn
id CA . cee Mt ~\
it pea ant ui fo. & a EG ; cr: o
Hetty he : be as SS STi
He Bot ee 5 PabAes Sab. B Lt Sains
i f “ , v 9 Deane ee FM oe ? an fe & f ai
Bob sh. eB Cee 225 Creer are vi
© ire POS, a LE Pe heed 335 * LEU
- \, a Le ESS A 7 5 % 3
~ ie eS ep Soe Ge i S
mad iy per, BOY cage | Ta. Pre.
fot oe AT eee aa cma
\ I 3 BS Pea aee :
é #* a Gia s pee sea} tO a
we # ? =: j bean Lye pL
pe P hie ak oS ew ei - . j al
j SoS ad eer || sO : Aki
i} \, Fgeg-eemnymoo so Pda ‘call Bo eT g a [ |
fi cameos ae Dog wr
i icone Ire eee oaks sates opp tay || Li
fa a ee sete a eer, 2
? ii O50 Kae ror eas ee eS ue er Oo. eae a | wan ee a
sz } tore ee ee NW OF bie
Y oy wt oe FOE ey! + es the Mis $253 cone all ; fl
Map is ~ FEN ea ne - woe te NS Sade ty
> § i 2 i ' MT ee rE een 2
% 3 # - a | Aj : 1 a) BL Fes Ear METS pn ae i rar q
de f i a eid Po - aga ;
2 it . io re ES *
“ o # S 5 . y sat \ iN A wR aie = oa ¥ '
a oe a nS Hie Tea CCG ot a
32 # OS | | | Ee Ney cA Re
& lt Oo | fe - tg tk AN \ \\
g a | ¥ a + PY WO : sin ih Nt x N A
VV of BH x . DL|° Pep es) Oat AY \ x RN 28
& an —— AN it j RSL fet Ni \ vn a NN \ Ne Ne
f ae”
@ ct Eng ‘| i. Sey a “Ss of = ee N eA ‘ NE SOG uN XY M ay
ee VON Sh GS EAN NNN
if i 4} 0 = «f 3 Q ETE ANN BN ; cece ee gee enasiae
i | PNae : wwlLe’ aN WM _
uy i ¢ QD t o§) Hh) ok RNS ae ; =
nde? | a; i ef Sea Ural pete
NO iow wi % lie t Be nO i tee
epee Wet ehin ey geese i f i
See [TT | fe at ee Lek ian
Saas 4. | aes Swe - ® pee pe pos, 1B Dh :
ON | | Wi been LH pe Lu.
sare Mellgel eR Hol 4 . Mia ees eer es ef [oe he { — Fy
Pe yye ey | tee eee aa oe
ae eS IL 3 \Y Ne eae ST [ae ad ¢ :
as ee stasaxteNn ee WG Rh
PR Pe Meets Come ao -
i; Sas fs Bag cre Weseetese| | Lal ys
Sak, 7 Nee ney gis HE a smi ba ghee as ie i , ae af = Eee | ‘
. : ENE eet Sar ‘fy oe ae Bl? oben . ead m 1
ah Rens ~ * : Na pare epee raetcet he ES . te ee fe ee a et By Se oye rn Wet see Ft
‘ oo tik saa ; ak Paes ie aot ae ea” Shs. re : ps eth ue ty
ae PASAT MUS Cr oe ACB CE ages he Spe Rew os - ee te gos oof "
o ae he Fro 34 ~e ee oa hess : te Baca ope
Medi cs) yh See te Hb bo eee She os an
b 4 ER aa : Bae is peer 7 tee Soa ag ao “he . . ge wy Svenee ot wey. Sh 4 oe s a u tek a ,
af A _f ae ee Bees. “ets ats 3 oie SS, ioahig y, ae Be fac te pre
aah Etgn eta, | pee cian ; Bo ea “eh es Wale | ig RA wig gies RRS wD fbn
preg bes Ode eee Sanaa ety ho Kore ee ae Beng ee : Pepin yes Sore St
Reina ai pot Sarhety Bh £8 Pals ‘ Pea rw ES aris ca ell as PURER A} SRE Bou Fase vee Bey NE, r
ee LONER Sea BS oe eaalies Pee et poe ee ae agama
: See eee z yew ee ae ais Pet wood Se gS yt
- ¥ of i) pais oe Sg BRN ed ‘og Ripe ae Neco Em Ste Ws hwnd Eee : aie ‘a i we cy,
a as Bee one eee on se Be . Soe i en heen att
ee tara thats Riba Boas a el Dare gate Ao bef a NN mie BM Ss oe
UES cee i ee ee ae oe ae ES
sinetie BS SG hE (Bae
es
|Section 20
} LAND USE SECTION FEES a
NOOSA — :
| ae RECEIPT TYPE
SALE OF DOCUMENTS
Superseded Planning Scheme’Documentation 520
Copy of Permit/Approval Letter a 110
‘The Noosa Pian Documentation . .111 :
APPLICATION FEES. : oo :
st Material Change of Use - osbiimpact a
copii . ; 1960-00 521
Inconsistent , 521
, - Assessment under Superseded Planning Scheme _ 521: ,
Modification to a Development Permit i 521 oo
oe Extension of a Currency Period . m 521
Operational Works - Landscaping 521
@ ' Bldg Work assessable against the Planning Scheme’ - §21
PRE LODGEMENT REVIEW , oe :
Half Hour — | 522 |
. One Hour 522 ,
ADVERTISING : an SO
Purchase Advertised Applications — §23
JETTIES” SO : |
Jetty Application Fee 524 ,
' Jetty Bond. : 51 ,
pO (Category 4)
BONDS . oo me -
Performance Bond co 51
; (Category 9) -
SIGNS 7 a Co
Registration Fee mo, oS OO 222 .
sce FEE tt So |
Search of Land Use Section file 112
_ Liquor Licensing Request 113 .
: a __ TOTAL. $ /479.00 |
NAME: ado vale ry Ltd. : : .
appress: (/- #¢ ft/ Lelivg ZA _ -
0 Box 1040, Noppavilll 80 4566 : |
FILENO: p07 1h DATE: /4¢-6-:7007 |
RECEIPTNO: 21S : Signature of TP Officer: /- | ot
autHorityno: _14/ 7007/1137/ ae |Section 21
: ee CALCULATION OF FEES | oe a
APPLICATION FEE TOTAL -
: he | : FEES
MCU - CODE ASSESSMENT } ~ :
Details of Development HD .
Consistent 1.0 _ | oO - Oo
Inconsistent 3.0 .
_ |FEE CALCULATION ~ | - | |
MCU - IMPACT ASSESSMENT @
Details of Development a
Consistent 1.0 | .
‘tInconsistent 3.0 .
FEECALCULATION = | a
OPERATIONAL WORKS ~ — " ne
Details of Development . . os, a So,
FEE CALCULATION 7 - Be a @
TOTAL FEES — —$ |Used in these records
00155885.001.pdfRelated documentPublic source context ↗
07/1137 - MCU - Home based business - Type 2 Evident Interior Design [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.4 MB (small file)
- File type
No other editions are linked here.