Council archive · source document
00155885.001
Text sections not matched to the original PDF pages. See original document to check page numbers.
; ; ~ om wed ty
"INTEGRATED PLANNING ACT 1997, . IDAS Assessment Checklist, Version 20, 2 April 2007
- Integration of land use and public 22. The application involves: (tick the applicable box/es}-— mo
transport . : : , Co . .
For more information refer to Guide 23, schedule. (C) (i) a material change of use assessable against the planning scheme for a purpose
8A of the IPA, & schedule 2 of the IP Regulation. | ~ " mentioned in schedule 13C of the JP Regulation and exceeding the thresholds set by that
Unless you answered “none of the above", the schedule. , . . .
- application triggers réferral to QT as a . . .
_ Concurrence agency. - oe . [1 (ii) reconfiguring alot— ,
me - . - ’ [J(@) __ onland that is completely or partly within a public transport corridor, and the
pO total number of lots increases; |
, (“J (b) on land that is completely or partly within a future public transport corridor or
an airport's public safety area, 0
DC 7 " [1 {c). on fand that is within 400m of a public passenger transport facility or a future
a : TS " public passenger transport facility, and the total site area is 5000m? or greater;
oO , _ (1(4) . for a residential purpose within the 25 ANEF contour for an airport; , .
. * (1e) _ fora residential purpose resulting in 100 or more allotments. .
: |. C1 (iii) operationat work assessable against the planning scheme, but not associated witha -
- ee ik material change of use mentioned in (i) above or reconfiguring a lot mentioned in (ii)
a oO mt “above, on land that— ; ;
oo . po! [-} (a) is completely or partly within a public transport corridor or a future public
; — . . transport corridor; >
. . i — [J (b) _ will result in work that encroaches into an airport's operational airspace.
Co (iv) none of the above. = , So , -
Raitway safety and efficiency . . _ 23. The application involves: (tick the applicable box/es)— = .
. For more information refer to Guide 23, schedule. J (i) a material change of use assessable against the planning scheme for apurpose =
. , BAotIne IPAS schedule 2-af he Regulation, } mentioned in schedule 13D of the IP Regulation and exceeding the thresholds setby that
Unless you answered “none of the above”, the . oF
. application triggers referral to QT asa _ schedule. . . ’ ae
concumence agency. = _ D1 (i) reconfiguring a tot— | ,
. oo (1 (a) on land that is completely or partly within a future public transport corridor,
; ; mo . future railway land or a railway tunnel easement; .
SC , - [)(b) _ on land that is within 400m of a Citytrain passenger railway station or a future
, Citytrain passenger railway station, and the total site area is 5000m? or
, : : greater; en? ; . : .
sO _ - [J (c} on land that abuts rail corridor land, commercial corridor land or future railway
— oo , - dand, and the total number of lots increases;
a (J (d)} on land that abuts rail corridor tand, commercial corridor land or future railway
: land.and an easement abutting the corridor or future railway {and is created;
Lo. [_]{e) on land that is completely or partly within 100m of, and abutting an approach
Co , an to, a railway level crossing, and the total number of lots increases; .
po (J (f) for a residential purpose resuiting in 100 or more allotments.
[I (iii) operational work assessable against the planning schéme, but not associated with a
. material change of use mentioned in (i) above or reconfiguring a lot mentioned in (ii) @
- ; ot above, involving extracting, excavating or filling greater than 50m3, on tand that— ,
; : { ] (a) is completely or partly within rail corridor land or commercial corridor land, and ;
. , se . : the work is not for rail transport infrastructure or other rail infrastructure; ‘
sO (7 (b) _ is completely or partly within future railway land, or a railway tunnel easement;
soos . [J (c) abuts rail corridor land, commercial corridor land or future railway land, and
vos oo oS -the work is within 25m of the railway boundary. -
mo, * PBd{iv)noneoftheabove. Lo i
"Moonie to Brisbane pipeline 24. The application involves the easement for the construction or operation of the Moonie to *
. For more information refer to schedule 2of the IP Brisbane strategic pipeline, and ‘involves: (tick the applicable box/es|—~ .
Requaton _.. | (1 @ amaterial change of use assessable against the planning scheme atid not associated --
soptesion tiggersretonatto te holder o the with reconfiguring a lot, and any structure or work will be located wholly or partly inthe.
* pipeline licence No 1 issued under the Petroleum easement. : ;
. Act 1923, currently Santos QNT Pty.Ltd, for ~ [7] (ii) reconfiguring a fot -
. advice. : ie . : ' . .
[_].(iii) operational work assessable against the planning scheme, thats filling, excavation,
. compaction, drilling, boring or piling not associated with a reconfiguring a lot, and the
‘ DO work is located wholly or partly in the easement. .
- [4] (iv) none of the above. Co oo
, oo. : : PageB , ,See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
00155885.001.pdfRelated documentPublic source context ↗
07/1137 - MCU - Home based business - Type 2 Evident Interior Design [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.4 MB (small file)
- File type
No other editions are linked here.