Council archive · source document
00155885.001
Text sections not matched to the original PDF pages. See original document to check page numbers.
. : . . | . : x . t
INTEGRATED PLANNING ACT 1997 Oe IDAS Assessment Checklist, Version 20, 2 April 2007"
‘State-controlled.road matters = '| 2.‘ The application involves: (tick applicable boxes) a a
For more information refer to Guides. | — [-](i) development on land contiguous* to a State controlled road and for - ‘\
- Unless you answered "none of the above” to Q2,.| . . , »
“the application triggers referral to the Department (1 (a) material change of use assessable against the planning scheme;
‘ofMain Roads (DMR) as areferral agency. (C] (b) reconfiguring a jot unless - : ‘
In'certain circumstances’ DMR will’be,an advice’. . : . .
agency, while in other circumstances DMR will: * - « the total number of lots is not increased; and .
be aconcurrence agency, « the total number of lots abutting the State-controlled road is not increased;
dclonhowen ikeetiee toy (J (c) operational work (not associated with a material change of use assessable against the
concurrence.agency for the application: planning scheme or reconfiguring a lot mentioned in (b) above}-
. ‘ .| - » associated with access to a State-controlled road; or
, , a _ «for filling or excavation; or ~
‘| "> « involving the redirection or intensification of site stormwater from the land, through a
os 4 __ pipe with a cross-sectional area greater than 625 cm? that directs stormwater to a
- . _,otate-controlled road." :
nT 1 (ii) development on land not contiguous to a State-controlled road and - ,
- — a (J (a) material change of use - so -
; . De * assessable against the local government’s planning scheme; and
noe , SF - + Mentioned in schedule 5 of the IP. Regulation and exceeding the thresholds set by
: that schedule; ,
ee : “8 _. {1 (b) reconfiguring a fot for a purpose mentioned in schedule 5 of the IP regulation _
er "and exceeding the thresholds set by that schedule; .
- ceuks Po , " ne ht * [1 (c) operational work (not associated with a material change of use assessable against ®
o Soe / a) planning scheme or reconfiguring a lot mentioned in (b) above)- mc ,
a a _® assessable against the local government's planning scheme; and; «|
. ce / __® mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
-. PE that schedule. Do
Se oo. [XI (iti). none of the above .
- Clearing vegetation . . , » «= 4/3. The application involves: (tick applicable box/es) . ,
For- more information refertoGuide‘12..-. . O (i) material change of use -
Unless you answered “noné of the.above” to Q3, lanni heme: oO
"+ the application requires assessmentby'the {a) assessable against the planning scheme; .
“Department of Natural Resources and Water: - , (b) on a lot containing - , * : .
' difan agency other:thar’NRW a theiassessrtent . * acategory 1, 2 or 3 area shown on a property map of assessable vegetation; or
“manager for.the application NRWis.a °°. « if there is no property.map of assessable vegetation-for the lot - remnant vegetation;
sgoncurrence agency forthe application in relation (c)_ where’the existing use of the land is a rural or environmental use; and .
fyou ticked 03(i or (i), Your application requires (d) - where the size of the land is 2 hectares or larger - complete Part J of Form 4 *
sreferral.to NRW for-assessment regardless of ~ Cc] (ii) reconfiguring a lot - .
“Whether vegetation clearing is proposed or.niot: _ x . —
i ae’ " - (a) on alot containing a category 1, 2 or 3 area shown on a property map of .
- ee, assessable vegetation or, if there is no property map of assessable vegetation "@
, . ; the lot, remnant vegetation; Ss
. . uO __ {b) where the size of the lot before the reconfiguration is 2 hectares or larger;
. Bef (c) where 2 or more lots are created: and
mo : a ; (d} where the size of any lot created is 25 hectares or smaller - complete Part J of Form 1
(CJ (iii) operational work: -
_ my , {a) for the clearing of native vegetation where the vegetation clearing is made
. yo. _ ” assessable under Schedule 8 of the IPA; and
: oO . (b) not associated with a material change of use assessable against the planning
: scheme mentioned in (i) or reconfiguring a lot mentioned in (ii) - complete Part J of
Form t , - Co,
. [xl {iv) none of the above, . ;
“Strategic portland = =, * 14. The application involves: = -
© Rormore information eter to Guide 11” =! __- [[}.(i) development on strategic port land as defined in the Transport Infrastructure Act 1994 (TI
. Atyou'ticked (i) theselevant Port Authoniy isthe | Act) - complete PartiofForm{ — , :
"+ “assessment mangger forthe application. a a
‘you ticked (i) Queeristarid Transports a. (] (ii) a material change of use that is inconsistent with the land use plan approved under the
- [email protected] forthe-application. TI Act for the strategic port land - complete Part! of Form 1 .
Te TX) (ill) none of the above - | —
. 4 ‘Land contiguous to a State-controlted road is defined in schedule 14 of the IP Regulation fo mean fand - itpart of the tand is within 100m of the State-controlled road; or that is part of a future State- .
controlled road. , _ oO . .
; : Page 2See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
00155885.001.pdfRelated documentPublic source context ↗
07/1137 - MCU - Home based business - Type 2 Evident Interior Design [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.4 MB (small file)
- File type
No other editions are linked here.