Original source · versioned page text
Beach Road Retreats Stage 2 Conditions
Attached to the e-mail 132008.1779.01 - Request to Extend Relevant Period (Stage 2).
132008.1779.1 [7.._ ADVISORY NOTES | These Advisory Notes do not form part of this approval or the conditions attached thereto. The following Advisory Notes are intended to provide guidance to the applicant where necessary and inform the applicant of actions that Council may take with respect to the development site or the approval: Development Plans 1. The proposed layout and number of retreats may be required to be amended pending the results of the Stormwater Treatment Design. Infrastructure Charges 2. Please contact Council's Infrastructure Charges Officer (email: [email protected]) a minimum of 5 business days prior to payment of the infrastructure contributions and/or charge notice so a payment advice detailing the amounts applicable at the time of payment may be issued to accompany the payment. Payment of infrastructure contributions/charges will not be accepted by credit card transaction. Environmental Health 3. The Environmental Protection Act 1994 states that a person must not carry out any activity that causes, or is likely to cause, environmental harm unless the person takes all reasonable and practicable measures to prevent or minimise the harm. Environmental harm includes environmental nuisance. In this regard persons and entities, involved in the civil, earthworks and construction phases of this development, are to adhere to their ‘general environmental duty’ to minimise the risk of causing environmental harm. Environmental harm is defined by the Act as any adverse affect, or potential adverse affect whether temporary or permanent and of whatever magnitude, duration or frequency on an environmental value and_ includes environmental nuisance. Therefore, no person should cause any interference with the environment or amenity of the area by reason of the emission of noise, vibration, smell, fumes, smoke, vapour, steam, soot, ash, dust, waste water, waste products, grit, sediment, oil or otherwise, or cause hazards likely in the opinion of the administering authority to cause undue disturbance or annoyance to persons or affect property not connected with the use. In accordance with the Public Health Act 2005, rainwater tanks must be constructed with mosquito proof screens (made from either brass, copper, aluminum or stainless steel), and constructed with a mesh size of no more than 1mm, and must be installed in a way that does not accelerate corrosion. Tanks that contain flap valves must be installed so that when closed, mosquitoes cannot pass through the valve. It is unlawful under the Public Health Act 2005 to construct, install or be in possession of a tank that does not comply with these requirements. Plumbing 4. The applicant is advised that a Compliance Permit for all potable water supply, recycled water, plumbing and drainage works within the boundaries of the development site shall be obtained from Council’s Plumbing Services Section prior to obtaining a Development Permit for Building Works. Separate water supply and sewerage hydraulic drawings shall be submitted detailing all internal plumbing installations for water and sewer house drainage for approval, as part of the building application process, and in accordance with the Plumbing and Drainage Act 2002. Equitable Access and Facilities 5. The plans for the proposed building work have NOT been assessed for compliance with the requirements of the Building Code of Australia — Part D3 as they relate to PD-DA-FM58/5-02/04/2009 Page 11 of 19
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Beach Road Retreats Stage 2 Conditions.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.