Original source · versioned page text
Beach Road Retreats Stage 2 Conditions
Attached to the e-mail 132008.1779.01 - Request to Extend Relevant Period (Stage 2).
NEW - Referzal azecey reponse 2008010131 Schedule A — Glossary Clearing, for vegetation: © means remove, cut down, ringbark, push over, poison or destroy in any way including by buming, flooding or draining; but e does not include destroying standing vegetation by stock, or lopping a tree. Clearing as a result of the MCU includes: © clearing of assessable vegetation that will result from the change in use, consisting of any of the following — clearing for infrastruchire—including buildings, stormwater management systems, water supply and sewerage systems—that are proposed as part of the MCU application - clearing for reads, vehicle parking, vehicle and pedestrian access, utilities eorridors, services, fences, firebreaks and fire management lines that are proposed as part of the MCU application — clearing that may not be necessary for developing infrastructure but is associated with the use applied for. And e clearing of assessable vegetation that will become exempt if the development application is approved. This includes any of the foliowing examples — clearing for routine management and essential management purposes associated with the approved development including cleaning to maintain proposed infrastructure, facilities, roads, access routes, utilities, services and ferices, and clearing ta maintain the safety of persons and property that will be associated with the development — clearing for necessary fire breaks and fire management lines associated with the development. This will be assessed as follows i. afl buile infrastructure other than waderground services, roads and fences will be assessed as requiring clearing for firebreaks with a width of 1.5 times the height of the tallest vegetation adjacent to the infrastructure, or 20m, wiichever is the greater, However. evidence may be provided to NRW that confirms that an alternative firebreak width is required that is consistent with the State Planning Policy (SPP) 1/03 Guideline ii. all proposed allotment boundaries will be assessed as requiring clearing for fire management lines with a width of 10m constructed on either side of the allotment boundary. unless NRW is provided with evidence that confirms that an alternative width of fire management line is required or an alternative configuration of fire managenient lines are required that is consistent vith the SPP 1/03 Guideline iii, im the case of evidence being presented that demonstrates altemmative fire management guidelines as bemg sufficient and consistent with the SPP 1°03, NRW may condition the development so that the full extent of exempt clearing prescribed for essential management under Schedule § of the IPA cannot be carried out by current or future landholders — where there is a concurrent application for Reconfiguring of a Lot (RaL) for the same land that has not yet been decided—clearing as a result of the ”RaL as ser out in the RaL Policy item 2 will be assessed. Baga 2 of 4 PD-DA-FM58/5-02/04/2009 Page 17 of 19 132008.1779.1
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Beach Road Retreats Stage 2 Conditions.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.