Skip to the record
Search everything, all in one place.

Original source · versioned page text

Beach Road Retreats Stage 2 Conditions

Attached to the e-mail 132008.1779.01 - Request to Extend Relevant Period (Stage 2).

of 19

Page text read automatically using OCR, there may be inaccuracies

NEW - Referzal azecey reponse 2008010131

Schedule A — Glossary
Clearing, for vegetation:
© means remove, cut down, ringbark, push over, poison or destroy in any way
including by buming, flooding or draining; but
e does not include destroying standing vegetation by stock, or lopping a tree.

Clearing as a result of the MCU includes:
© clearing of assessable vegetation that will result from the change in use,
consisting of any of the following
— clearing for infrastruchire—including buildings, stormwater management
systems, water supply and sewerage systems—that are proposed as part of
the MCU application
- clearing for reads, vehicle parking, vehicle and pedestrian access, utilities
eorridors, services, fences, firebreaks and fire management lines that are
proposed as part of the MCU application
— clearing that may not be necessary for developing infrastructure but is
associated with the use applied for.
And
e clearing of assessable vegetation that will become exempt if the development
application is approved. This includes any of the foliowing examples
— clearing for routine management and essential management purposes
associated with the approved development including cleaning to maintain
proposed infrastructure, facilities, roads, access routes, utilities, services
and ferices, and clearing ta maintain the safety of persons and property that
will be associated with the development
— clearing for necessary fire breaks and fire management lines associated
with the development. This will be assessed as follows
i. afl buile infrastructure other than waderground services, roads and
fences will be assessed as requiring clearing for firebreaks with a
width of 1.5 times the height of the tallest vegetation adjacent to the
infrastructure, or 20m, wiichever is the greater, However. evidence
may be provided to NRW that confirms that an alternative firebreak
width is required that is consistent with the State Planning Policy
(SPP) 1/03 Guideline
ii. all proposed allotment boundaries will be assessed as requiring
clearing for fire management lines with a width of 10m constructed
on either side of the allotment boundary. unless NRW is provided
with evidence that confirms that an alternative width of fire
management line is required or an alternative configuration of fire
managenient lines are required that is consistent vith the SPP 1/03
Guideline
iii, im the case of evidence being presented that demonstrates altemmative
fire management guidelines as bemg sufficient and consistent with
the SPP 1°03, NRW may condition the development so that the full
extent of exempt clearing prescribed for essential management under
Schedule § of the IPA cannot be carried out by current or future
landholders
— where there is a concurrent application for Reconfiguring of a Lot (RaL)
for the same land that has not yet been decided—clearing as a result of the
”RaL as ser out in the RaL Policy item 2 will be assessed.

 

Baga 2 of 4

PD-DA-FM58/5-02/04/2009 Page 17 of 19

132008.1779.1

Log in to download the original (Beach Road Retreats Stage 2 Conditions.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.