3.3 Pre-Development Model
3.3.1 Catchment Properties
Sub-catchment delineation was undertaken based on the 2015 LiDAR DEM. For the pre-development
case, the drainage area was divided into three (3) sub-catchments (namely, A, A1 and EXT as shown
in Figure 3-1). It is noted that the west end of the Site (designated as Wetland Rehabilitation zone)
was not included in the catchment delineation as this portion of the Site will not be affected by the
development.
It was also assumed based on available contour data that the external catchment (EXT) drains down
Sanctuary Drive, bypassing the Site. Table 3-2 provides the main catchment properties (area and
impervious percentage).
Table 3-2 Pre-Development Catchment Properties
Sub-catchment Area(ha) Impervious Value (%)
A 0.326 2.9
A1 0.124 0
EXT 0.099 80
Figure 3-1 Pre-Development Catchment Plan
R.30199.001.03_SMP.docx | 8
158
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.