Original PDF page 164, section 1. The text section number identifies this passage in the reader.
Figure 3-3 Post-Development Split Catchment Plan
3.4.2 Characteristics of Detention System
Table 3-6 contains the dimensions and outlet configurations of the modelled detention system.
Table 3-6 Modelled Detention System
Detention Dimensions Outlet Configuration
A1_Rainwater tank - 2 x 3 kL = 6 kL - 80 mm diameter orifice at tank invert
- 0.98 m height - 4x300mm diameter pipes at 0.9m above the tank
invert to cater for surcharging from the tank when
full.
A_Rainwater tank - 5 x 3 kL = 15 - 100 mm diameter orifice at tank invert.
kL - 10x300mm diameter pipes at 0.89m above the
- 0.98 m height tank invert to cater for surcharging from the tank
when full.
Underground - 120 m2 - 50mm diameter orifice at tank invert.
detention tank - 0.5 m height - 4.0 m weir at 0.46m above the tank invert.
- 60 m 3
(a grate would also be provided in the car park to
allow for surcharging in extreme events).
With reference to the above table, it is noted that although Catchment A drains to the bioretention
basin, no detention is considered to occur within the basin.
R.30199.001.03_SMP.docx | 12
162
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.