Original source · versioned page text
Sealed Judgement
Very large file (118 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Original PDF page 167, section 1. The text section number identifies this passage in the reader.
_ e —
: \ on
oe ei : /a
Fer /
e Se | = 4 \ f
er & Ly / =
ee ——— ar ENTION TANK VOLUME = 60m?
o G oy DETAILED DIMENSIONS AND —~.
CONFIGURATION TO BE CONFIRME x
_& 4 : VER) CUNDER.OPW ii LICATION
10m WIDE BUSHFIRE ASSET 1X2 “/f L 4
PROTECTION ZONE Om?
fe eS XISTING SEWER HAN ofES S
PRE-CAST HEADWALL FOR p) Pad» San TO SUIT ;
ROOFWATER DRAINAGE WITH & s
\FROG FLAP. ROCK PITCHING T 43 :
BE PROVIDED AT OUTLET TO ff ee nee [
—_\ REQUCE VELOCITY
y}
Jina —TL {]— go / oe /
] /
- ee e /
— __ sy | & \ \ eo
; \ \voy’3 /;
\\ / {
i * © CABINS 12 &
bs /
\\\4 / \ CABINS 2 & 3 e- 7
| \‘ / |
| ' é
@=.. Mf
i / /
1 iS oor WATER BRaINAGe 0 cOLTECT — 4
\ (3, RAINWATER RE-USE TANKS UNDER /
\> HYDRAULIC HEAD AND TO BE ATTACHED -
\ 10 SUSPENDED TIMBER WALKWAY WITH
\ “GALVANISED CLAMP FITTINGS
\3 Se | E |
aA } |
‘3 CABINS 104 11/9775 ] P12
ec ” & / 7
\é @.
hy INS 4 “A
\ cs
0 e>
CABINS 8 & 9
«\
\\ <
0 5 10 Sm
ee |
Figure
Figure 3-4
3-4 Indicative
Indicative Pipe
Pipe Location
Location
WEP | Water Engineering R.30199.001.03_SMP.docx
R.30199.001.03_SMP.docx || 15
15
165
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.