Skip to the record
Accept no substitutions.

Original source · versioned page text

Sealed Judgement

of 206

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file (118 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 170, section 1. The text section number identifies this passage in the reader.

4.1.2           Pollutant export parameters

Table 4-2 nominates the pollutant export parameters adopted for the purposes of modelling:

x     Pre-development scenario: Forest land use parameters were used to model the vegetated
      portion of the Site, while the Urban Residential land use was used to model a small portion of
      the external sealed road.

x     Post-development scenario: the Forest land use parameters were adopted for the ground
      portion of the Site that will be retained undeveloped and the suspended walkways, while the
      Urban Residential land use was used for the roof and carpark areas.

Table 4-2      Pollutant Export Parameters

    Land Use            Flow      TSS Log10 Values       TP Log10 Values         TN Log10 Values
                        Type
                                   Mean      St. Dev     Mean       St. Dev      Mean       St. Dev

    Forest           Base Flow      0.51       0.28       -1.79      0.28        -0.59        0.22

                     Stormflow      1.90       0.20       -1.10      0.22       -0.075        0.24

    Urban Roof       Base Flow      N/A        N/A         N/A        N/A         N/A          N/A

                     Stormflow      1.30       0.39       -0.89      0.31         0.26        0.23

    Urban Road       Base Flow      1.00       0.34       -0.97      0.31         0.20        0.20

                     Stormflow      2.43       0.39       -0.30      0.31         0.26        0.23



4.2             Catchment Properties
Table 4-3 and Table 4-4 present the properties of catchments modelled under the pre-development
and                  post-development                    scenarios                  respectively.




Figure 4-1 shows the post-development MUSIC catchment plan.

Table 4-3      Pre-development Catchment Properties



                                                                            R.30199.001.03_SMP.docx | 18




                                                                                                           168
Log in to download the original file

Sealed Judgement.pdf · 118 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.