Skip to the record
The gold standard in government transparency.

Original source · versioned page text

Sealed Judgement

of 206

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file (118 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 3, section 1. The text section number identifies this passage in the reader.

                                        "Annexure A"


When Conditions must be Complied With
1.     Unless otherwise stated, all conditions of this Decision Notice must be complied with
       prior to the use commencing, and then compliance maintained at all times while the use
       continues.
Currency Period
2.     This development approval lapses if the use has not happened by 1 September 2031,
       unless an application to extend the currency period is approved by Council.
Approved Plans
3.     Development authorised by this approval must be undertaken generally in accordance
       with the Approved Plans listed in the table/s below. The plans must be amended to
       incorporate the amendments listed within the table below and resubmitted to Council
       prior to the issue of any Development Permit for Operational Works*.

         Plan No.      Rev.   Plan/Document Name                                 Date

         10-01          P     Site Plan, prepared by Aspect                      15.05.2025

         10-02          O     Zoning Site Plan, prepared by Aspect               15.05.2025

         10-03          K     Site Disturbances Plan, prepared by Aspect         15.05.2025

         10-04A         N     Tree Species Plan A, prepared by Aspect            15.05.2025

         10-07         GG     Site Plan – Tree Retention vs Tree Removal Plan,   15.05.2025
                              prepared by Aspect

         10-07A         Q     Tree Retention vs Tree Removal Plan A, prepared    15.05.2025
                              by Aspect

         10-07B         Q     Tree Retention vs Tree Removal Plan B, prepared    15.05.2025
                              by Aspect

         10-07C         O     Tree Retention vs Tree Removal Plan C, prepared    15.05.2025
                              by Aspect

         10-08          S     Site Plan – (TPZ) Tree Retention/Removal,          15.05.2025
                              prepared by Aspect

         10-08A         P     (TPZ) Tree Retention/Removal Plan A, prepared      15.05.2025
                              by Aspect

         10-08B         P     (TPZ) Tree Retention/Removal Plan B, prepared      15.05.2025
                              by Aspect

         10-08C         N     (TPZ) Tree Retention/Removal Plan C, prepared      15.05.2025
                              by Aspect

         10-09          N     Site Plan - Tree Retention Value, prepared by      15.05.2025
                              Aspect

         10-09A         N     Tree Retention Value Plan A, prepared by Aspect    15.05.2025


                                                                                        8274014_1

3459-9154-4892, v. 1
                                                                                        8309250_1




                                                                                                    1
Log in to download the original file

Sealed Judgement.pdf · 118 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.