Skip to the record
Mmm.. taste the original NoosaWatch™

Original source · versioned page text

Engineering Hydrology Plans (IWMP)

of 32

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
Table 7: MUSIC Rainwater Tank Demands

                                      Units     Average             Demand             Daily
      Use           Usage                       Persons             (L/P/D)           Demand
  A-Residential        Toilet           27            1.2             26               842
                   Laundry              27            1.2             35               1,134
 A-Commercial          Toilet           10             2              25               500
    B-Shops            Toilet           3              2              25               150
    C-Tavern           Toilet           1              -               -               1,800
    D-Shops            Toilet           4              2              25               200



Based on the roof catchment areas and the demands estimated for each use, the
rainwater tank modeling parameters are detailed in Table 8.


Table 8: MUSIC Rainwater Tank Parameters

       Parameter                A-Res         A-Comm        B-Shops        C-Tavern    D-Shops
 Total Tank Volume (KL)          30             5             3               60             4
                   2
    Surface Area (m )            10             2             1               25             1
  Overflow Pipe (mm)             90             90            90              90           90
 Annual Demand Scaled
                                  -             -              -             311             -
  by Daily PET (kL/yr)
  Daily Demand (kL/d)           1.98           0.45          0.15            1.80         0.20


2.4.2 Bioretention System




Bioretention systems use ponding above a treatment surface to maximise the
volume of runoff flowing through the filtration media. They typically convey flows
above the design event through overflow pits. The treatment system operates by
firstly filtering surface flows through surface vegetation and then percolating runoff
through prescribed filtration media. This media provides treatment through fine
filtration, extended detention and biological uptake of nutrients. They also provide
flow retardation for smaller events and are particularly efficient in removing
nutrients. These devices can be installed at various scales, from planter boxes in
streetscape to within large detention basins.




                                                                                                 10
Log in to download the original file

Engineering Hydrology Plans (IWMP).pdf · 5.0 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.