MUSIC modelling of the proposed treatment train for the tavern site at Noosa Fair,
was performed to ensure the identified load based Water Quality Objectives were
achieved. Table 10 and Table 11 present the overall load-based outputs at the
receiving node. It is to be noted that the site and road catchments have been
reported separately to demonstrate compliance with the WQO.
Table 10: MUSIC Results – Load-Based Pollutant Outputs at Outlet to Site
Reduction
Unmitigated Mitigated Target
Pollutant Achieved Compliance
(kg/yr) (kg/yr) Reduction
(%)
Flow 21.10 19.20 8.9 - -
TSS 5,500 1,030 81.3 80%
TP 10.4 3.9 62.5 60%
TN 67.4 32.2 52.2 45%
GP 480 0 100 90%
Table 11: MUSIC Results – Load-Based Pollutant Outputs for Road Area
Reduction
Unmitigated Mitigated Target
Pollutant Achieved Compliance
(kg/yr) (kg/yr) Reduction
(%)
Flow 12.9 12.5 2.8 - -
TSS 4,680 914 80.5 80%
TP 8.19 2.9 64.5 60%
TN 41.1 21.8 47 45%
GP 293 0 100 90%
13
[OCR of page images]
~~
aquaintel
2.5 Results
MUSIC modelling of the proposed treatment train for the tavern site at Noosa Fair,
was performed to ensure the identified load based Water Quality Objectives were
achieved. Table 10 and Table 11 present the overall load-based outputs at the
receiving node. It is to be noted that the site and road catchments have been
reported separately to demonstrate compliance with the WQO.
Table 10: MUSIC Results — Load-Based Pollutant Outputs at Outlet to Site
Reduction
Unmitigated Mitigated : Target .
Pollutant (kg/yr) (kg/yr) nee) Reduction Compliance
Flow 21.10 19.20 8.9 - -
Tss 5,500 1,030 81.3 80% v
TP 10.4 3.9 62.5 60% v
TN 67.4 32.2 52.2 45% v
GP 480 ) 100 90% v
Table 11: MUSIC Results — Load-Based Pollutant Outputs for Road Area
Reduction
Unmitigated Mitigated . Target .
Ach
Pollutant (kg/yr) (kg/yr) cI ee Reduction Compliance
Flow 12.9 12.5 2.8 - -
TSS 4,680 914 80.5 80% v
TP 8.19 2.9 64.5 60% v
TN 41.1 21.8 47 45% v
GP 293 0 100 90% v
13
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.