Skip to the record
Trusted by locals. Built for Noosa.

Original source · versioned page text

Engineering Hydrology Plans (IWMP)

of 32

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
3.3     Developed Scenario
The proposed development has been incorporated into the WBNM model by
adjusting the site sub-catchments and the fractions impervious values. Fraction
impervious values of the existing and proposed scenarios are provided in Table 16
below.

Table 16: WBNM Sub-Catchment Fraction Impervious Values – Developed Scenario

      WBNM Sub-                          Developed Scenario      Existing Scenario
                        Area (ha)
      Catchment                            Impervious (%)         Impervious (%)
        SUBA              1.11                  90                       58
        SUBB              0.65                  90                      89
        SUBC              0.46                  90                      90
        SUBD              0.31                  90                      90
        TOTAL             2.52                   -                       -

Peak flows tabulated in this report represent the peak values extracted from the
modelled range of storm events.

Table 17: Developed Scenario WBNM Outlet Peak Flows

                    Existing Peak Flow     Developed Peak Flow   Change in Peak Flow
                           (m3/s)                 (m3/s)               (m3/s)
Outlet 1
       2 year              0.73                      0.69                -0.04
       10 year             1.02                      0.95                -0.07
      100 year             1.40                      1.31                -0.09
Outlet 2
       2 year              0.14                      0.19                    0.05
       10 year             0.19                      0.26                    0.06
      100 year             0.26                      0.35                    0.09
Outlet 3
       2 year              0.07                      0.13                    0.06
       10 year             0.10                      0.18                    0.08
      100 year             0.14                      0.25                    0.11



The catchment boundaries have changed slightly between the existing and
developed scenarios. It can be seen that the peak flows have increased to Outlets 2
and 3. This is a result of the catchment areas increasing. Peak flows from Outlet 1
have decreased as the catchment area has reduced by 0.25ha. Mitigation within the
catchment draining to Outlets 2 and 3 will be required. The developed scenario
WBNM model layout is shown in Figure 8 of this report.




                                                                                      18
Log in to download the original file

Engineering Hydrology Plans (IWMP).pdf · 5.0 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.