2.1 Design Objectives
This report identifies the stormwater quality management objectives for the
operational phase (post-construction phase) of the proposed development.
Construction based stormwater quality management objectives will need to be
addressed as part of operational works documentation.
2.1.1 Typical Pollutants
Typical pollutants generated during the operational phases of a development are
outlined in Table 1. These pollutants are to be addressed in the management of
water quality discharged from a development site. Construction based pollutants
will be managed through appropriate erosion and sediment control measures.
Table 1: Pollutants typically generated during the operational phase
Pollutant Potential Source
Construction packaging, construction waste materials,
Litter
paper, food packaging
Sediment Exposed soils and stockpiles
Hydrocarbons Fuel or oil spillage, equipment leakage
Toxic materials Washwaters, cement slurry, paints, cleaning agents
Acid or Alkaline substances Acid sulphate soils, cement slurry, washwaters
Oxygen demanding substances Organic or chemical matter
Nutrients Nitrogen, phosphorous
Pathogens/Faecal coliforms Sewage
Heavy metals Sediment runoff
Surfactants Detergents, cleaning agents
2.1.2 Operational Design Water Quality Objectives
Water quality objectives or performance criteria for the proposed development are
those stipulated in the SRC Planning Scheme Policy No 6 – Operational works
(Section 7). The applicable water quality design objectives for the site are shown in
Table 2 below.
Table 2: Site stormwater quality objectives (operational phase)
Minimum reductions in mean annual loads from unmitigated development (%)
Total Suspended Total Phosphorous Total Nitrogen Gross pollutants
Solids (TSS) (TP) (TN) >5 mm
80 60 45 90
4
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.