Original source · versioned page text
Refused Decision Notice - Council Meeting Decision - DBW21 0216 [As published]
Attachment 1—Referral agency conditions 2112-26696 SRA (Under section 56(1)}(b)(i) of the Planning Act 2016 the following conditions must be attached to any development approval relating to this application) (Copies of the plans and specifications referenced below are found at Attachment 5) No. Conditions Condition timing Building work seaward of the coastal building line 9.3.1.1.1—The chief executive administering the Planning Act 2016 nominates the Director-General of the Department of Environment and Science to be the enforcement authority for the development to which this development approval relates for the administration and enforcement of any matter relating to the following conditions: 1. The development must be carried out generally in accordance with the following plan: ¢ Plans (Lower Ground Floor Plan, Ground Floor Plan and First Floor Plan) prepared by Durbach Block Jaggers dated 30/11/2021, reference DA-0002 and revision A. At all times Erosion and sediment control measures which are in accordance with Best Practice Erosion and Sediment Control (BPESC) guidelines for Australia (Intemational Erosion Control Association), are to be installed and maintained to prevent the release of sediment to tidal waters. For the duration of the works State Assessment and Referral Agency Document Set ID: 22512729 Version: 8, Version Date: 27/07/2023 Page 3 0f7 Page 6 of 14
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.