Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
Maintenance schedule, monitoring and reporting
This section outlines the required monitoring and maintenance actions for the rehabilitation areas, and the person/s responsible for undertaking these tasks. The maintenance schedule is shown in Tables 5 & 6. A 12 month maintenance and monitoring period
is to be provided.



Table 5: Maintenance and Monitoring Schedule for the Rehabilitation Zone

      TIME PERIOD                         MONITORING TASKS                                                            REMEDIAL ACTIONS                                                      MONITORING AND REPORTING
     Months 0 – 3      • Identify priority areas for treatment, rubbish and weeds to be   Not Applicable                                                                  Not Applicable
                         removed, identify necessary weed control techniques etc.
                       • Initial weed control for all rehabilitation zones
                       • Implement revegetation works including installation of stakes,
                         tree guards, jute mat/mulch, fencing etc as required
                       • Watering of any planted stock
     Months 4-6        • Check appropriate weed removal/control has been implemented      • Undertake replacement planting if tubestock death is apparent.                • Monthly monitoring must be undertaken to ensure the rehabilitation is
                         and is working.                                                  • Ongoing weed management                                                         undertaken in accordance with this plan
                       • Check on survival rates of planted tube stock                    • If plants are being excessively grazed by wildlife, then implement suitable
                       • Check levels of herbivory on planted stock                         protection measures to reduce grazing




     Months 6-12       • Check on the performance of weed removal/control methods         • Increase weed management works if required, or implement alternate weed       • Monthly monitoring must be undertaken to ensure the rehabilitation is
                       • Check on survival rates of planted tube stock                      control technique.                                                              undertaken in accordance with this plan
                       • Check levels of herbivory on planted stock                       • Undertake replacement planting if tubestock death is apparent                 • Perform any final remedial works are required to achieve the nominated
                                                                                          • If plants are being excessively grazed by wildlife, then implement suitable     performance criteria
                                                                                            protection measures to reduce grazing (better/more fencing, better/more
                                                                                            tree guards)
                                                                                          • Provide watering and maintenance of any newly planted stock
                                                                                          • Undertake any other works required to achieve the performance criteria and
                                                                                            obtain off-maintenance status at the 12 month mark




                                                                                                                                                                                                                                           DISCLAIMER:
   PROJECT TITLE:                                    SHEET TITLE:
                                                                                                                                                                                                                                           Designs documented on this drawing are the property of Green
   Rehabilitation Management Plan –                 Maintenance Schedule                                                                                                                                                                   Tape Solutions and are not authorised for reproduction or use in
                                                                                                                                                                                                                                           whole or part without written permission. These plans have been
   178 Davis Rd, Cootharaba                                                                                                                                                                                                                prepared for the exclusive use of the client. Green Tape Solutions
                                                                                                                                                                                                                                           does not accept responsibility for any use of or reliance upon the
                                                                                                                                                                                                                                           contents of these drawings by any third party. Confirm all
   CLIENT:                                          SHEET NUMBER:                Compiled by      QA       DATE                                                                                                                            dimensions on site and clarify any discrepancies prior to
                                                                                                                                                                                                                                           construction.
                                                                                     RH           RH       27.10.22
   Paul Desouza                                     RMP9_REV A                                                                                                                                                                             ABN: 20 162 130 627
Log in to download the original file

Rehabilitation Management Plan.pdf · 1.3 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.