2020-09-14 General Committee Meeting Notes
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
RECOMMENDATIONS ONLY – NOT THE FINAL DECISION OF COUNCIL
GENERAL COMMITTEE MEETING 14 SEPTEMBER 2020
b. Provide Council with certification and photographic report on supervising
construction works within the tree protection zone of the retained Pandanus
trees, following the completion of the approved works.
6. All landscape works must be established and maintained in accordance with the
approved design for the life of the development, and in a manner that ensures
healthy, sustained and vigorous plant growth. All plant material must be allowed
to grow to full form and be refurbished when its life expectancy is reached.
7. All landscape works must be maintained generally in accordance with the
approved design for the life of the development.
8. No signage is to be located within the landscaped areas.
Damage to infrastructure
9. Any damage to footpaths, street plantings, natural vegetation/trees kerb and
channel, bridges or roadways must be repaired or reinstated to at least pre-
existing conditions.
10. Where damage occurs to any Council asset as a result of the landscaping works,
the damage must be repaired immediately where it creates a hazard that
presents risk to person or property. Non-hazardous damage must be repaired
prior to completion of works.
Car Parking
11. The applicant must comply with the requirements of any Infrastructure
Agreement entered into with the Council with respect to the payment of car
parking contributions in relation to the proposed development. In the event that
the Infrastructure Agreement does not apply a minimum of one car parking space
must be provided and marked on the site and made available and accessible at
all times while the use is open for business.
12. A retaining wall must be maintained for the full length of the property to main
beach with removable flood gates installed or available for installation prior to any
significant coastal storm event to each entry point. These structures must be
designed to mitigate the impact of wave overtopping of the Council controlled
beach seawall during a significant event. Certification must be submitted to
Council from a RPEQ which certifies that these structures meet the requirements
of this condition.
C. Include the following new Advisory Note:
Qualified Person
1. A Qualified Person, for the purpose of:
a. Undertaking, supervising tree works and preparing arboriculture
certification, is considered to be a person with a minimum three years
current experience in tree protection, hazard identification/mitigation
assessment and either:
i. International Society of Arboriculture (ISA) certification; or
ii. A Diploma of Arboriculture.
D. Agree to enter into an Infrastructure Agreement with the applicant that provides for
contributions in lieu of one onsite car parking space.
Page 7 of 12