PROJECT NOTES (NOTE THAT ALL NOTES MAY NOT APPLY)
GENERAL                                           GENERAL (CONTIINUED)                                 EARTHWORKS CONTINUED                                       SOIL NOTES                                                                  SEWERAGE SUPPLY NOTES
                                                                                                                                                                                          1.   TOPSOIL AND SUBSOIL SHALL BE STOCKPILED
                                                                                                                                                                  SOIL NOTE




1.   THESE ENGINEERING DRAWINGS HAVE BEEN          27. ALL REDUNDANT CROSSOVERS, ETC SHALL BE          •           COMPACTION STANDARDS FOR FILLING MATERIAL                                   SEPARATELY.                                    1.   ALL WORK AND MATERIALS SHALL BE IN
     PREPARED FROM INFORMATION AVAILABLE AT            REMOVED                                                                                                                                                                                     ACCORDANCE WITH CURRENT SOUTH EAST
     THE TIME. AS THIS INFORMATION MAY BE THE                                                                      CONTROLLED FILLING                                                     2.   CARE SHALL BE TAKEN TO PREVENT SEDIMENT             QUEENSLAND SEWERAGE CODE SPECIFICATIONS
     SUBJECT OF CHANGE PRIOR TO OR DURING          28. ALL FILL SHALL BE APPROVED BY THE                                                                                                       FROM ENTERING THE STORMWATER SYSTEM.                AND STANDARDS.
     CONSTRUCTION, THE CONTRACTOR IS                   SUPERVISING ENGINEER PRIOR TO USE                               (A)   SAND FILLING UP TO 800 DEEP,PLACED                                THIS MAY INVOLVE PLACING APPROPRIATE
     REQUESTED TO ADVISE THE ENGINEER WHERE                                                                                  IN MAXIMUM 300mm THICK LAYERS                                     SEDIMENT CONTROLS AROUND STOCKPILES.           2.   UNLESS SPECIFIED OTHERWISE ALL MATERIALS
     DIFFERENCES OCCUR. THESE DRAWINGS SHALL      SAFETY                                                                     AND COMPACTED WITH A VIBRATING                                                                                        AND WORK SHALL COMPLY WITH THE RELEVANT
                                                                                                                                                                                                                                                                                                        LINDSAY CONSULTING PTY
                                                                                                                                                                                                                                                                                                         LINDSAY CONSULTING PTY LTD




     NOT BE USED FOR FINAL SETOUT OF THE                                                                                     ROLLER TO ACHIEVE A MINIMUM                                  3.   IF ACID SULPHATE SOILS EXIST IN THE WORKS           AUSTRALIAN STANDARDS.
     PROJECT UNLESS SPECIFICALLY STATED.                                                                                     DYNAMIC CONE PENETRO- METER                                                                                                                                                                   LTD
                                                   1.   REFER TO THE PROJECT DOCUMENTS FOR AN                                                                                                  AREA. THE OUTPUTS FROM THE RISK
                                                                                                                             READING OF 7 BLOWS PER 300                                        ASSESSMENT BASED ON THE QUEENSLAND ACID        3.   THE CONSTRUCTION OF THE SEWERAGE WORK
                                                        ASSESSMENT OF THE RISKS ASSOCIATED WITH
2.   INSPECTIONS ARE REQUIRED TO BE PERFORMED                                                                                PENETRATION (REFER AS 1289.F3.3).                                 SULPHATE SOIL TECHNICAL MANUAL SHALL BE             SHOWN ON THIS DRAWING SHALL BE SUPERVISED
                                                        THE ANY WORKS AND RECOMMENDED
     BY A DULY APPOINTED COMPETENT PERSON(S).                                                                                                                                                  CONFORMED TO.                                       BY AN ENGINEER WHO HAS RPEQ REGISTRATION                                                                     RPEQ 4928
                                                        TREATMENTS.
     REFER TO PRINCIPLE CONTRACTOR, CERTIFIER,                                                                               SAND FILL MAY BE FLOODED IF                                                                                           AND ENDORCEMENT FROM THE RELEVENT
     STATE GOVERNMENT LEGISLATION OR COUNCIL                                                                                 NECESSARY TO ACHIEVE THIS                                                                                             AUTHOIRITY . SEWERAGEWORKS NOT COMPLYING             OFF. 2C/82 PARKER STREET, MAROOCHYDORE                PH 54 792 118
                                                                                                                                                                  CREEK CROSSING NOTES
                                                                                                                                                                  CREEK CROSSINGS NOTES




                                                   2.   WHERE THERE IS IS NO OVER RIDING PROJECT
     FOR FOR HOLD POINTS.
                                                        DOCUMENT/ SPECIFICATIONS THEN REFER TO
                                                                                                                             COMPACTION STANDARD, PROVIDED
                                                                                                                             THE WATER CAN SUBSEQUENTLY BE
                                                                                                                                                                                                                                                   WITH THIS REQUIREMENT WILL NOT BE
                                                                                                                                                                                                                                                   PERMITTED TO CONNECT INTO THE SEQ SERVICE
                                                                                                                                                                                                                                                                                                        THIS DRAWING REMAINS THE PROPERTY OF
3.   THESE DRAWINGS SHALL BE READ IN
                                                        THE PRINCIPLE CONTRACTOR FOR ALL SAFETY
                                                        REQUIREMENTS
                                                                                                                             DRAINED FROM THE SITE.                                       1.   SILTATION CONTROL MEASURES SHALL BE                 PROVIDER SEWERAGE SYSTEM.                            LINDSAY CONSULTING PTY LTD AND IS FOR
     CONJUNCTION WITH ALL ARCHITECTURAL AND                                                                                                                                                    PLACED DOWNSTREAM OF ANY EXCAVATION
     OTHER CONSULTANTS DRAWINGS AND                                                                                    (B)   NON-SAND FILLING UP TO 400 DEEP,                                  WORK.                                          4.   ALL WORK ASSOCIATED WITH LIVE SEWERS OR                THE SOLE USE OF THE CLIENT. NO PART
                                                   3.   CONSULTATION WITH AFFECTED PARTIES IS
     SPECIFICATIONS AND WITH SUCH OTHER
                                                        MANDATORY WHEN IDENTIFYING
                                                                                                                             PLACED IN MAXIMUM 150 mm THICK                                                                                        MAINTENANCE HOLES SHALL BE CARRIED OUT BY            MAY BE USED IN PART OR WHOLE WITHOUT
     WRITTEN INSTRUCTIONS AS MAY BE ISSUED                                                                                   LAYERS AND COMPACTED WITH A                                  2.   APPROPRIATE SEDIMENT CONTROLS SHALL BE              THE SEQ SERVICE PROVIDER AT THE
     DURING THE COURSE OF THE CONTRACT.
                                                        HAZARDS,ASSESSING RISKS AND DECIDING ON
                                                                                                                             MECHANICAL ROLLER. CLAY FILL                                      USED TO PREVENT SEDIMENT FROM ENTERING              DEVELOPER'S COST.                                       PRIOR EXPRESS WRITTEN CONSENT OF
                                                        CONTROL MEASURES.
4.   ALL DISCREPANCIES SHALL BE REFERRED TO THE
                                                                                                                             SHALL BE MOIST DURING
                                                                                                                             COMPACTION.
                                                                                                                                                                                               THE CREEK.
                                                                                                                                                                                                                                              5.   ALL PIPES AND MATERIALS SHALL COMPLY WITH
                                                                                                                                                                                                                                                                                                              LINDSAY CONSULTING PTY LTD
                                                   4.   CONSTRUCTION SHALL BE CARRIED OUT USING
     ARCHITECT/ENGINEER FOR DECISION BEFORE                                                                                                                                               3.   NO SOIL SHALL BE STOCKPILED WITHIN 5m OF            THE REQUIREMENTS OF THE "ACCEPTED
     PROCEEDING WITH THE WORK.
                                                        SAFE WORK METHODS AND IN ACCORDANCE
                                                        WITH THE FOLLOWING DOCUMENTS:-
                                                                                                                       (C)   CONTROLLED FILLING SHALL
                                                                                                                             CONTINUE FOR AT LEAST 1 METRE
                                                                                                                                                                                               THE CREEK.                                          PRODUCTS ANDMATERIALS" LIST.                     CLIENT AND PROJECT DESCRIPTION
5.   ALL DIMENSIONS RELEVANT TO SETTING OUT AND                                                                              PAST THE EDGE OF THE FOOTING
                                                                                                                                                                  REHABILATION                                                                6.   EACH ALLOTMENT SHALL BE SERVED BY A DN110
                                                                                                                                                                  REHABILIATION NOTES




     OFF-SITE WORK SHALL BE VERIFIED BY THE       LEGISLATION                                                                BEAM AND SHALL BE BATTERED BACK                                                                                       PE (OR DN100 PVC) PROPERTY CONNECTION. FOR
     CONTRACTOR BEFORE CONSTRUCTION AND                                                                                      TO THE ORIGINAL SURFACE WITH A                                                                                        ALLOTMENTS OTHER THAN SINGLE RESIDENTIAL,
     FABRICATION IS COMMENCED.                     -
                                                   -
                                                        WORKPLACE HEALTH AND SAFETY ACT 2011
                                                        WORKPLACE HEALTH AND SAFETY REGULATION
                                                                                                                             SLOPE OF NO MORE THAN
                                                                                                                             1:2 (VERT : HOR).
                                                                                                                                                                                          1.   PREDISTURBANCE SOIL PROFILES AND
                                                                                                                                                                                               COMPACTION LEVELS SHALL BE REINSTATED.
                                                                                                                                                                                                                                                   A DN160 PE (OR DN150 PVC) PROPERTY
                                                                                                                                                                                                                                                   CONNECTION SHALL BE PROVIDED.
                                                                                                                                                                                                                                                                                                        GJ GARDNER NOOSA
6.   THE ENGINEER'S DRAWINGS SHALL NOT BE               2011
     SCALED.                                                                                                           (D)   WHERE THE DEPTH OF FILLING                                   2.   PREDISTURBANCE VEGETATION PATTERNS SHALL       7.   PROPERTY CONNECTIONS SHALL BE LOCATED
                                                  QUEENSLAND GOVERNMENT CODES OF
                                                                                                                                                                                                                                                                                                        PROPOSED TRIPLEX
                                                                                                                             MATERIAL EXCEEDS THAT SPECIFIED                                   BE RESTORED.                                        WITHIN THE PROPERTY AS SHOWN IN THE
7.   DURING CONSTRUCTION THE CONTRACTOR           PRACTICE                                                                   ABOVE, THE FILLING MATERIAL SHALL                                                                                     DRAWINGS.
     SHALL BE RESPONSIBLE FOR MAINTAINING THE                                                                                BE COMPACTED AS FOLLOWS:-            STORMWATER DRAINAGE NOTES
     STRUCTURE IN A STABLE CONDITION AND
     ENSURING NO PART SHALL BE OVERSTRESSED
                                                   -    CONFINED SPACES: CODE OF PRACTICE 7443
                                                                                                           (i)        SAND FILL TO 65% DENSITY                                            1.   ANY CHANGES SHALL BE APPROVED BY THE
                                                                                                                                                                                                                                              8.   PROPERTY CONNECTION BRANCHES SHALL
                                                                                                                                                                                                                                                   EXTEND INTO THE PROPERTY A MINIMUM OF 300
                                                                                                                                                                                                                                                                                                        11 ROBERT STREET,
                                                                                                                                                                                                                                                                                                        NOOSAVILLE
                                                   -    FORMWORK CODE OF PRACTICE 7443
     UNDER CONSTRUCTION ACTIVITIES.                -    HAZARDOUS MANUAL TASKS: CODE OF PRACTICE                                  INDEX IN ACCORDANCE WITH                                     ENGINEER IN WRITING PRIOR TO CARRYING OUT           mm AND A MAXIMUM OF 750 mm. UNITYWATER
                                                        7443                                                                      AS1289.E6.1                                                  OF THE WORKS                                        REQUIRES MINIMUM EXTENSION OF 500 mm INTO
8.   WORKMANSHIP AND MATERIALS ARE TO BE IN        -    HOW TO MANAGE WORK HEALTH AND SAFETY                                                                                                                                                       PROPERTY.
     ACCORDANCE WITH THE RELEVANT CURRENT                                                                  (ii)       NON-SAND FILL TO 95%                                                2.   ALL LEVELS TO AHD.
                                                        RISKS: CODE OF PRACTICE 2011
     S.A.A. CODES INCLUDING ALL AMENDMENTS, AND                                                                                  MAXIMUM DRY DENSITY                                                                                          9.   WHERE PIPES ARE LAID IN FILL, THE FILLING
                                                   -    MANAGING NOISE AND PREVENTING HEARING
     THE LOCAL STATUTORY AUTHORITIES, EXCEPT
     WHERE VARIED BY THE CONTRACT DOCUMENTS.
                                                        LOSS AT WORK: CODE OF PRACTICE 2015
                                                                                                                                 (STANDARD COMPACTION) IN
                                                                                                                                 ACCORDANCE WITH AUSTRALIAN
                                                                                                                                                                                          3.   ALL DIMENSIONS ARE IN MILLIMETRES UNLESS            SHALL BE CARRIED OUT IN LAYERS NOT
                                                                                                                                                                                                                                                   EXCEEDING 300 mm (LOOSE) IN DEPTH AND SHALL
                                                                                                                                                                                                                                                                                                    DRAWING TITLE
                                                   -    MANAGING THE RISK OF FALLS AT WORKPLACES:                                                                                              NOTED OTHERWISE.

                                                                                                                                                                                                                                                                                                        GENERAL NOTES
                                                                                                                                 STANDARD                                                                                                          BE COMPACTED UNTIL THE COMPACTION IS NOT
                                                        CODE OF PRACTICE 2011
9.   THE APPROVAL OF A SUBSTITUTION SHALL BE                                                                                                                                              4.   ALL DIMENSIONS AND LEVELS ARE TO BE                 LESS THAN 95% OF THE MATERIALS MAXIMUM
                                                   -    MANAGING WORK ENVIRONMENT AND FACILITIES:
     SOUGHT FROM THE ENGINEER, BUT IS NOT AN                                                                                                                                                   CHECKED ON-SITE BEFORE WORK COMMENCES.              COMPACTION WHEN TESTED IN ACCORDANCE
                                                        CODE OF PRACTICE 2011
     AUTHORIZATION FOR AN EXTRA. ANY EXTRA                                                                 (iii)      COMPACTION TESTS SHALL BE                                                                                                    WITH A.S. 1289 (MODIFIED COMPACTION). TESTING
                                                   -    MOBILE CRANE: CODE OF PRACTICE 2006
     INVOLVED MUST BE TAKEN UP WITH THE                                                                                         CARRIED OUT ON EACH LAYER                                 5.   DIMENSIONS SHALL NOT BE OBTAINED BY                 SHALL BE CARRIED OUT AFTER EACH ALTERNATE
                                                   -    SCAFFOLDING: CODE OF PRACTICE 2009
     ARCHITECT/ENGINEER AND/OR PRINCIPLE                                                                                        AS THE FILLING IS PLACED. IF                                   SCALING THE DRAWING.                                LAYER. IN ALL SUCH CASES APPROVAL OF
                                                   -    STEEL CONSTRUCTION: CODE OF PRACTICE 2004
     BEFORE THE WORK COMMENCES.                                                                                                 THE COMPACTION STANDARD                                                                                            CONSTRUCTED SEWERS WILL NOT BE ISSUED BY
                                                   -    TILT-UP AND PRE-CAST CONSTRUCTION
                                                                                                                                SPECIFIED IS NOT ACHIEVED,                                6.   FOR BUILDING SET-OUT REFER ARCHITECTURAL            THE SEQ SERVICE PROVIDER UNLESS
                                                        INDUSTRY CODE OF PRACTICE 2003
10. UNLESS NOTED OTHERWISE ALL DIMENSIONS                                                                                       THEN A "PIER AND SLAB" AND                                     DRAWINGS                                            CERTIFICATES ARE PRODUCED CERTIFYING THAT
                                                   -    TOWER CRANE: CODE OF PRACTICE 2006
    ARE IN MILLIMETRES                                                                                                          "PIER AND BEAM" FOOTING                                                                                            THE REQUIRED COMPACTION HAS BEEN
                                                   -    WORK HEALTH AND SAFETY CONSULTATION,
                                                        CO-OPERATION AND CO-ORDINATION CODE OF
                                                                                                                                DESIGN SHALL BE ADOPTED                                   7.   THE LOCATION AND DEPTH OF ALL SERVICES              ACHIEVED.                                        SCALES
11. ALL LEVELS ARE EXPRESSED IN METRES.                                                                                         WITH ALL PIERS FOUNDED                                         SHALL BE VERIFIED ON SITE WITH THE
                                                        PRACTICE 2011
                                                                                                                                ON THE NATURAL UNDERLYING                                      REVLEVANT AUTHORITY PRIOR TO THE               10. WHERE SEWERS HAVE A GRADE OF 1 IN 20 OR
                                                   -    SAFE DESIGN OF STRUCTURES CODE OF
12. ALL PROPS AND FORMWORK FOR BEAMS AND                                                                                        MATERIAL.                                                      COMMENCEMENT OF WORKS                              STEEPER,BULKHEADS SHALL BE CONSTRUCTED
                                                        PRACTICE 2014 OTHER REFERENCES:
    SLABS SHALL BE REMOVED BEFORE                                                                                                                                                                                                                 IN ACCORDANCE WITH THE SEQ SEWER CODE.
                                                   -    NATIONAL CODE OF PRACTICE FOR PRECAST,
    CONSTRUCTION OF ANY MASONRY WALLS OR                                                                               ROLLED FILLING                                                     8.   DURING CONSTRUCTION BARRIERS, LIGHTS &
                                                        TILT UP AND CONCRETE ELEMENTS IN BUILDING
    PARTITIONS ON THE FLOOR.                                                                                                                                                                   SIGNS SHALL BE MAINTAINED TO ENSURE SAFE       11. THE CONTRACTOR SHALL VERIFY THE LOCATION
                                                        CONSTRUCTION, 2008
                                                                                                                       (A)   SAND FILLING UP TO 600 DEEP,                                      PASSAGE OF TRAFFIC AND PEDESTRIANS IN              AND DEPTH OF EXISTING SERVICES WITH
13. ALL NON LOAD BEARING WALLS SHALL BE KEPT                                                                                 PLACED IN MAXIMUM 300mm THICK                                     ACCORDANCE WITH THE REQUIREMENTS OF THE            RELEVANT AUTHORITIES BEFORE COMMENCING
    CLEAR OF THE UNDERSIDE OF SLABS AND           CONTRACTORS SUBMISSIONS                                                    LAYERS AND COMPACTED BY                                           LOCAL AUTHORITY.                                   WORKS.
    BEAMS BY 20mm                                                                                                            REPEATED ROLLING WITH AN
                                                   1.   THE REINFORCEMENT, PRE-STRESSING AND                                 EXCAVATOR.                                                   9.   ALL WORK AND MATERIALS SHALL BE IN             12. SEWERS SHALL BE DISUSED /ABANDONED IN
14. UNLESS OTHERWISE SHOWN. SUBTERRANEAN                STRUCTURAL STEEL MATERIAL SUPPLIER MUST                                                                                                ACCORDANCE WITH CURRENT LOCAL                      ACCORDANCE WITH PROCEDURES SET OUT IN
    TERMITE PROTECTION SHALL BE IN ACCORDANCE           BE CERTIFIED BY ACRS (AUSTRALIAN STANDARDS                     (B)   NON-SAND FILING UP TO 300 DEEP,                                   AUTHORITIES SPECIFICATIONS AND STANDARDS.          THE SEQ SEWER CODE.
    WITH AS 3660 - PART 1 AND THE BCA.                  CERTIFICATION AND VERIFICATION OF                                    PLACED IN MAXIMUM 150mm THICK
                                                        REINFORCING, PRE-STRESSING AND STRUCTURAL                            LAYERS AND COMPACTED BY                                      10. THE CONTRACTOR SHALL BE RESPONSIBLE FOR         13. BENCH MARK AND LEVELS TO AHD.
15. NON-STRUCTURAL ITEMS SUCH AS DAMP PROOF             STEELS) FOR THE SUPPLY OF REINFORCEMENT,                             REPEATED ROLLING WITH AN                                         NOTIFYING ALL RELEVANT AUTHORITIES AND
    COURSING, FLASHING AND WEEP HOLES ARE               PRE-STRESSING STRUCTURAL STEEL.                                      EXCAVATOR                                                        PAYING ALL FEES NECESSARY BEFORE                14. EXISTING ALLOTMENTS REQUIRING A PROPERTY
    NOT SHOWN FOR CLARITY. REFER TO THE                                                                                                                                                       COMMENCING WORK, FOR LOCATING ALL                   CONNECTION FROM EXISTING SEWERS SHALL BE
    ARCHITECTURAL DETAILS AS REQUIRED              2.   SUBMIT CURRENT CERTIFICATES.                                   (C)   WHERE THE DEPTH OF FILLING                                       EXISTING SERVICES AND FOR REPAIR OF ANY             PROVIDED BY THE SEQ SERVICE PROVIDER AT
                                                                                                                             MATERIAL EXCEEDS THAT SPECIFIED                                  SERVICES DAMAGED AS A RESULT OF THE                 THE DEVELOPERS COST.                              SURVEY DATUM
16. ALL STORMWATER CULVERTS TO BE RCP CLASS
                                                  EARTHWORKS                                                                 ABOVE, THE FILLING MATERIAL SHALL                                FOOTPATHS AND PRIVATE PROPERTY SHALL BE
    2. ALL ROOFWATER PIPES TO BE uPVC, CLASS SH                                                                              BE COMPACTED AS FOLLOWS:-                                        REINSTATED TO THEIR ORIGINAL CONDITION.         WATER SUPPLY NOTES
17. SILT MANAGEMENT PLAN TO REMAIN IN PLACE
    UNTIL COMPLETION OF WORKS
                                                   1.   EARTHWORKS TO COMPLY WITH AS3798.
                                                                                                           (i)        SAND FILL TO 65% DENSITY
                                                                                                                                  INDEX IN ACCORDANCE WITH
                                                                                                                                                                                          11. ANY OBSOLETE/REDUNANT CIRCUITWAY                1.   ALL WORK AND MATERIALS SHALL BE IN
                                                                                                                                                                                                                                                                                                        .
                                                   2.   STRIP SITE OF ALL TOPSOIL, VEGETATION AND                                                                                             CROSSINGS AND DRAINAGE OUTLETS FROM THE              ACCORDANCE WITH CURRENT SOUTH EAST
                                                                                                                                  AS1289.E6.1                                                 KERB AND CHANNEL INCLUDING ASSOCIATED
                                                        DELETERIOUS MATTER TO A MINIMUM DEPTH OF                                                                                                                                                   QUEENSLAND WATER SUPPLY CODE
18. ALL PROPOSED OPERATIONAL WORKS SHALL BE                                                                                                                                                   PIPES ACROSS THE FOOTPATH SHALL BE
                                                        150 mm.                                                                                                                                                                                    SPECIFICATIONS AND STANDARDS.
    CONSTRUCTED IN ACCORDANCE WITH COUNCIL'S
    OPERATIONAL WORKS APPROVAL LETTER AND
                                                   3.   PROOF ROLL SUBGRADE TO REVEAL SOFT SPOTS.
                                                                                                           (ii)       NON-SAND FILL TO 95%
                                                                                                                                 MAXIMUM DRY DENSITY
                                                                                                                                                                                              REMOVED AND THE KERB AND CHANNEL AND
                                                                                                                                                                                              FOOTPATH REINSTATED TO THE LOCAL                2.   UNLESS SPECIFIED OTHERWISE ALL MATERIALS
                                                                                                                                                                                                                                                                                                    ASSOCIATED CONSULTANTS
    COUNCIL'S DECISION                                                                                                           (STANDARD COMPACTION) IN                                     AUTHORITIES CURRENT SPECIFICATIONS AND OR
                                                        SOFT SPOTS TO BE REMOVED AND BACKFILLED.                                                                                                                                                   AND WORK SHALL COMPLY WITH THE RELEVANT
                                                                                                                                 ACCORDANCE WITH AUSTRALIAN                                   STANDARDS
                                                        ALL NATURAL SUBGRADE IS TO BE COMPACTED                                                                                                                                                    AUSTRALIAN STANDARDS.
19. CONCRETE KERB RAMPS SHALL BE ALIGNED TO                                                                                      STANDARD
                                                        TO ACHIEVE A DENSITY INDEX OF 70%.
    COMPLY WITH COUNCIL'S STANDARD DRAWING                                                                                                                                                12. THE CONTRACTOR'S ATTENTION IS DRAWN TO          3.   ADOPT LIP OF KERB OR SHOULDER OF ROAD AS
    AND SHALL BE CONSTRUCTED STRICTLY IN                                                                   (iii)      COMPACTION TESTS SHALL BE                                               THE REQUIREMENTS OF THE WORKPLACE HEALTH
                                                   4.   MATERIAL WON FROM SITE TO BE INSPECTED BY                                                                                                                                                  PERMANENT LEVEL.
    ACCORDANCE WITH COUNCIL STANDARD                                                                                            CARRIED OUT ON EACH LAYER                                     AND SAFETY ACT 1995. ALL WORK IS TO BE
                                                        ENGINEER FOR APPROVAL PRIOR TO USE AS
                                                                                                                                AS THE FILLING IS PLACED. IF                                  CARRIED OUT IN ACCORDANCE WITH THIS ACT
                                                        FILLING UNDER SLABS. ANY IMPORTED FILL TO                                                                                                                                             4.   COVER ON MAINS FROM PERMANENT LEVEL TO
20. ALL TEMPORARY AND PERMANENT ROAD SIGNS                                                                                      THE COMPACTION STANDARD                                       AND IN PARTICULAR THE CONTRACTOR TO
                                                        HAVE A MINIMUM CBR VALUE OF 15%. ALL FILL TO                                                                                                                                               BE AS SHOWN IN SEQ-WAT-1200-2.
    AND LINEMARKING SHALL COMPLY WITH THE                                                                                       SPECIFIED IS NOT ACHIEVED,                                    ENSURE THE REQUIREMENTS OF THIS
                                                        BE COMPACTED TO EITHER CONTROLLED OR
    CURRENT MANUAL OF UNIFORM TRAFFIC                                                                                           THEN A "PIER AND SLAB" AND                                    SPECIFICATION WITH REGARD TO 'NOTIFICATION
                                                        ROLLED FILL STANDARD AS SPECIFIED                                                                                                                                                     5.   CONDUITS TO BE INSTALLED IN ACCORDANCE
    CONTROL DEVICES(M.U.T.C.D.). EXISTING LINE                                                                                  "PIER AND BEAM" FOOTING                                       IN RELATION TO A NOTIFIABLE PROJECT ARE
                                                        ELSEWHERE                                                                                                                                                                                  WITH THE STANDARD DRAWINGS.
    MARKING SHALL BE REMOVED BY GRINDING                                                                                        DESIGN SHALL BE ADOPTED                                       FULFILLED.
    NOT"BLACKING OUT". COUNCIL DOES NOT                                                                                         WITH ALL PIERS FOUNDED
                                                   5.   WHERE SERVICE TRENCHES ARE REQUIRED TO                                                                                                                                                6.   A WATER METER SUPPLIED AT THE DEVELOPER'S
    APPROVE OF BLACKING OUT OF EXISTING LINE                                                                                    ON THE NATURAL UNDERLYING                                 13. BENCHING OF PIT STRUCTURES SHALL HAVE A
                                                        BE EXCAVATED BELOW FOOTING BASE LEVEL,                                                                                                                                                     COST, IS TO BE INSTALLED AT THE SERVICE POINT
    MARKING. KERB MARKERS SHALL BE PROVIDED                                                                                     MATERIAL.                                                     SMOOTH FINISHED SURFACE, AND PIPES SHALL
                                                        SIDE OF TRENCH SHALL BE LOCATED AWAY FROM                                                                                                                                                  OF EACH LOT IN ACCORDANCE WITH THE
    FOR ALL WATER, TELSTRA AND ANY OTHER                                                                                                                                                      NOT PROJECT INSIDE THE SHAFT OF THE PIT.
                                                        SIDE OF FOOTING BY THE SAME DISTANCE THAT                                                                                                                                                  STANDARD DRAWING FOR THE SEQ-SP.
    SERVICE CONDUIT ROAD CROSSINGS AS
    APPLICABLE.
                                                        THE TRENCH IS BELOW FOOTING BASE. WHERE        VEGETATION PROTECTION
                                                                                                                                                                                          14. STORMWATER DRAINAGE PIPES SHALL BE UPVC
                                                        THIS CANNOT BE ACHIEVED, THE STRUCTURAL
                                                        ENGINEER SHALL BE CONTACTED FOR FURTHER
                                                                                                       NOTES                                                                                  PIPE (MINIMUM SEWER CLASS SN8) TO AS 14. 1260
                                                                                                                                                                                                                                              7.   ALL MATERIALS USED IN THE WORKS SHALL
                                                                                                                                                                                                                                                   COMPLY WITH THE SEQ-SP's ACCEPTED
21. CONTRACTOR SHALL VERIFY ALL LOCATIONS OF                                                                                                                                                  OR APPROVED EQUIVALENT. MINIMUM COVER TO
                                                        DIRECTION.                                                                                                                                                                                 PRODUCTS AND MATERIALS LIST OR BE
    SERVICES, ALL DIMENSIONS AND LEVELS PRIOR                                                          1.          TREES LOCATED ALONG THE FOOTPATH SHALL                                     ROOFWATER PIPES SHALL BE 50mm EXCEPT                 APPROPRIATELY SHOWN, LISTED AND DEFINED IN
    TO CONSTRUCTION.                                                                                               BE, TRANSPLANTED PRIOR TO CONSTRUCTION,                                    WHERE REDUCED COVER IS REQUIRED TO
                                                   6.   ALL SOIL CONDITIONS SHALL BE AS PER                                                                                                                                                        THE ENGINEERING SUBMISSION SO THAT THE
                                                                                                                   OR REPLACED IF DESTROYED.                                                  DISCHARGE TO THE KERB AND CHANNEL.
                                                        SPECIFIED GEOTECHNICAL REPORT. WHERE                                                                                                                                                       ALTERNATIVE PRODUCT OR MATERIAL CAN BE
22. ALL MATERIALS & WORKMANSHIP SHALL BE IN
                                                        CONDITIONS VARY FROM REPORT THE                                                                                                                                                            ASSESSED AND IF APPROPRIATE, APPROVED BY
    ACCORDANCE WITH AS2890, THE BUILDING CODE                                                          2.          WHEN WORKING WITHIN 4m OF TREES, RUBBER                                15. MINIMUM PIPE GRADES FOR STORMWATER AS
                                                        GEOTECHNICAL ENGINEER SHALL BE CONTACTED                                                                                                                                                   THE SEQ-SP.
    OF AUSTRALIA (INCLUDING THE QUEENSLAND                                                                         OR HARDWOOD GIRDLES SHALL BE                                               3500 PART 3: PIPES SHALL COMPLY WITH - 1.0%
                                                        FOR DIRECTIONS
    SUPPLEMENT), THE QUEENSLAND BUILDING ACT                                                                       CONSTRUCTED WITH 1.8m BATTENS CLOSELY                                      (MIN) GRADE FOR PIPES < 150 DIA. - 0.5% (MIN)   8.   ALL CONCRETE FOOTPATHS TO BE CLEAR OF
    AMENDMENT ACT 1991 AND THE LOCAL                                                                               SPACED AND ARRANGED VERTICALLY FROM                                        GRADE FOR PIPES > 150 BUT < 375 DIA.
                                                   7.   THE CONTRACTOR(S) SHALL FULLY INFORM                                                                                                                                                       WATER MAINS.
    AUTHORITY'S BY-LAWS.                                                                                           GROUND LEVEL. GIRDLES SHALL BE STRAPPED
                                                        THEMSELVES OF THE GROUND CONDITIONS ON
                                                                                                                   TO TREES PRIOR TO CONSTRUCTION AND REMAIN                              16. CONCRETE CIRCUITWAY AND PARKING AREAS           9.   TEST/CHLORINATION POINTS TO BE INSTALLED IN
                                                        SITE PRIOR TO COMMENCEMENT OF THE WORKS
23. THE CONTRACTOR IS RESPONSIBLE TO OBTAIN                                                                        UNTIL COMPLETION.                                                          SHALL BE CONSTRUCTED WITH 32 MPa
                                                        AND ADOPT SEEPAGE AND DRAINAGE CONTROL                                                                                                                                                     ACCORDANCE WITH STANDARD DRAWING
    RELEVANT APPROVALS PRIOR TO
    COMMENCEMENT OF WORKS.
                                                        AND CONSTRUCTION PRACTICES APPROPRIATE
                                                                                                       3.          TREE ROOTS SHALL BE TUNNELLED UNDER,
                                                                                                                                                                                                                                                   NO.SEQ-WAT-1410-1.                               REVISION LIST
                                                                                                                                                                                          17. REFER HYDRAULIC DRAWINGS FOR SANITARY
                                                        FOR THE SITE CONDITIONS.
                                                                                                                   RATHER THAN SEVERED. IF ROOTS ARE SEVERED                                  DRAINAGE LAYOUTS.                               10. THE CONSTRUCTION OF THE WATER
                                                                                                                                                                                                                                                                                                    A                                 ORIGINAL ISSUE               5/10/24
24. KERB MARKERS SHALL BE PROVIDED FOR ALL
    WATER, TELSTRA AND ANY OTHER SERVICE
                                                  8.    WHERE ANY FILLING IS CARRIED OUT ON THE SITE
                                                                                                                   THE DAMAGED AREA SHALL BE TREATED WITH A                                                                                       RETICULATION WORK SHOWN ON THIS DRAWING           B                                 REVISED                      29/10/24
                                                                                                                   SUITABLE FUNGICIDE. CONTACT RELEVANT                                   18. COMPACTION OF MATERIAL UNDER CONCRETE
    CONDUIT ROAD CROSSINGS AS APPLICABLE
                                                        AFTER THE COMPLETION OF THE SITE
                                                                                                                   COUNCIL ARBORIST FOR FURTHER ADVICE.                                       CIRCUITWWAYS AND PARKING AREAS SHALL BE (i)
                                                                                                                                                                                                                                                  MUST BE SUPERVISED BY AN ENGINEER WHO HAS         C                                 REVISED                      24/2/25
                                                        INVESTIGATION, THE FOLLOWING REQUIREMENTS                                                                                                                                                 RPEQ REGISTRATION. WORKS NOT COMPLYING
                                                        SHALL BE FOLLOWED:                                                                                                                    75% MINIMUM DENSITY FOR COHESIONLESS                WITH THIS REQUIREMENT WILL NOT BE                 D                                 REVISED                      11/8/25
25. ALL VARIATIONS SHALL BE BE APPROVED IN                                                             4.          ANY TREE LOPPING REQUIRED SHOULD BE
    WRITING BY THE ENGINEER BEFORE BEING                                                                           UNDERTAKEN BY AN APPROVED ARBORIST.
                                                                                                                                                                                              MATERIAL (AS 1289 E5.1) AND (ii) 90% RELATIVE
                                                                                                                                                                                              DRY DENSITY (STD COMP.) FOR MATERIAL OTHER
                                                                                                                                                                                                                                                  PERMITTED TO CONNECT TO THE RETICULATION          E                                 REVISED FOLLOWING RFI        16/10/25
                                                   •    THE SITE SHALL BE STRIPPED OF ALL                                                                                                                                                         SYSTEM.
    CARRIED OUT                                                                                                                                                                               THAN (i)
                                                        VEGETATION PRIOR TO THE PLACEMENT OF ANY
                                                        FILLING MATERIAL.
26. THE CONTRACTOR SHALL CONFIRM THE
    LOCATION OF ALL EXISTING SERVICES ON AND
    EXTERIOR TO THE SITE INCLUDING BUT NOT
    LIMITED TO WATER MAINS, SEWER MAINS, GAS
    MAINS, LELECTRICAL CABLES,
    TELECOMMUNICATION CABLES. ANY DAMAGE TO
    EXISTING SERVICES ITS THE RESPONSIBILITY OF
    THE CONTRACTOR AND AT THE CONTRACTORS
                                                                                                                                   GTP353




    EXPENSE
                                                                                                                                    Lot 0




                                                                                                                                                                                                                                                                                                   Computer File
                                                                                                                                                                                                                                                                                                                                             240771OPW.DWG
                                                                                                                                                                                                                                                                                                   DRAWING NUMBER                                               SHEET   REV.

                                                                                                                                                                                                                                                                                                                                               24-0771-OPW2       2 E
Log in to download the original file

RFI - App - Updated SWMP - 11 Robert St.pdf · 3.1 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.