Original source · versioned page text
RFI - App - Updated SWMP - 11 Robert St
Original PDF page 6, section 1. The text section number identifies this passage in the reader.
LINDSAY CONSULTING PTY LTD- STRUCTURAL AND CIVIL ENGINEERS
ACN 079 744 808 ABN 61 478 386 385 GST REGISTERED, AS TRUSTEE FOR THE LINDSAY FAMILY TRUST
6. WASTE MANAGEMENT
All waste from the site shall be collected in a waste skip or a fence off area specifically
set-aside for waste disposal. If a fenced off area is utilised then access to the enclosure
via a bobcat shall be available.
7. WORKING HOURS
Working hours for the duration of the construction period shall be as per Noosa Council
guidelines or as set out in the town planning requirements.
On and Behalf of
LINDSAY CONSULTING PTY LTD RPECQ 391
Jason Lindsay
RPEQ
REF: 240771 5 20 October 2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.