RFI - App - Updated SWMP - 11 Robert St
Original PDF page 8, section 1. The text section number identifies this passage in the reader.
LINDSAY CONSULTING PTY LTD
RAINFALL VOLUME CALCULATIONS
Project Project Number
11 ROBERT STREET, NOOSAVILLE Client GJ GARDNER NOOSA
240771
SITE INFORMATION
Total Site Area 1296 sqm
RAINFALL INTENSITIES (FROM BOM, ARR 2016) Limiting runoff from Site (Dia 450) 999 m3/sec (999 voids this check)
Pavement area to Detention Tank 0 sqm
Annual Exceedance Probability (AEP) Storage in bio-retention basins 0 cbm
Duration 63.20% 50%# 20%* 10% 5% 2% 1% Roof Area into Detention Tank 512 sqm
1 min 177 199 266 311 355 413 456 Site Area 1296 sqm
2 min 151 170 231 275 319 381 431 Travel length 40 m
3 min 142 159 216 256 296 352 396 Site Slope 0.01
4 min 135 151 205 241 278 327 365 Surface Roughness 0.2
5 min 128 144 194 228 262 306 341 Land Description L L/M/D
10 min 105 117 157 182 207 239 264 Soil Permeability H High/Medium/Low (H/M/L)
15 min 89 99.7 132 154 175 202 222 L ==> Light cover bushland, or poor grass cover, or low density pasture, or low cover bare fallows
30 min 62.8 70.3 94 110 125 146 161 M ==> Medium Density Bush, or good grass cover, or high density pasture, or zero tilling cropping
1 hour 41.6 46.8 63.5 75 86.5 102 114 H ==> Dense Bushland
2 hour 26.7 30.3 42 50.3 58.7 70.2 79.4 Un-Developed Fraction Impervious 0.4 From Fig. 4.05.1 in QUDM (2007)
3 hour 20.6 23.5 33 39.8 46.7 56.3 63.9 Developed Fraction Impervious 1 From Fig. 4.05.1 in QUDM (2007)
6 hour 13.3 15.3 22 26.8 31.7 38.4 43.7 One Hr rainfall Intensity for Q10 75 mm/hr
12 hour 8.64 10.1 14.7 18 21.4 26.1 29.7 Calculated Travel Time 11 Min Must equal time selected for intensity
24 hour 5.63 6.58 9.73 12 14.3 17.5 20 Adopted Storm Time 10 min
48 hour 3.57 4.18 6.2 7.65 9.15 11.4 13.2
72 hour 2.68 3.13 4.64 5.74 6.88 8.62 10.1 Detention Tank Provided 10000 lt
Average Expected Return Interval (AER)
63% 50% 20% 10% 5% 2% 1%
Intensity (for Return Interval) 105.00 117.00 157.00 182.00 207.00 239.00 264.00
Undeveloped Developed Undeveloped Developed Undeveloped Developed Undeveloped Developed Undeveloped Developed Undeveloped Developed Undeveloped Developed
C10 value 0.780 0.900 0.780 0.900 0.780 0.900 0.780 0.900 0.780 0.900 0.780 0.900 0.780 0.900
Fy Factor 0.800 0.800 0.850 0.850 0.950 0.950 1.000 1.000 1.050 1.050 1.150 1.150 1.200 1.200
Cy 0.624 0.720 0.663 0.765 0.741 0.855 0.780 0.900 0.819 0.945 0.897 1.035 0.936 1.080
Q (m3/sec) 0.024 0.027 0.028 0.032 0.042 0.048 0.051 0.059 0.061 0.070 0.077 0.089 0.089 0.103
Total Rainfall for event (m3) 17 20 30 36 43 54 62
Total Non-Worsening Volume for Storm (m3) 3 3 4 5 6 8 9
Roof Area Runoff for Storm (m3) 6 7 11 13 16 21 24
SQUARE EDGE ORIFICE CALCULATION
Q 59.01517
C 0.6
g 9.81
h 0.8 Height from orifice centre line to water level
A 0.024827
Dia 177.7927 required diameter
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.