09/0103 - Referral Agency Response - EPA [As Published] · 132009.103
Notice
Concurrence Agency Response
2 Any person employed to work on any part of the site where Condition 1 has not been
satisfied is to be forewarned in writing by the applicant.
This warning is to explain that information available to the EPA indicates a potential for
residual UXO exists on the site and work should proceed with due caution. lt is to state the
procedure to be followed by any person finding an object suspected of being explosive
ordnance or component thereof:
e¢ Donot disturb the object.
¢ Take action, where appropriate, to prevent it being disturbed by another person.
¢ Note its approximate dimensions and general appearance.
e
e
»Note the route to-its location. pow ee,
dvise the’ Police, as, soon as possible.
4 + 4 Fe Se, .
el ¥ get le Ee Pes wel . ae Aye ge eS
eee 3 #.« Following investigation: and any remedial ction ‘taken to Satisfy’ Condition 1 above! thee Loy ak aid
wee ‘applicant is to submit.a report, prepared i in accordance with current guidelines, to the EPA
for assessment. The.EPA is to subsequently advise the Sunshine Coast Regional Council &
and the applicant of its assessment in regard to Condition 1 being satisfied. ‘
» ”
4°: Prior to Condition 3 being satisfied, no excavated: gravel, rock; sand or soil is sto be removed
from the site without written EPA approval. *.
5 oie The applicant is to advise the owner and any occupier of the site of the above :
‘ , responsibilities.
Additional comments or advice about the application
Applicants may visit the EPA's website http:/Awww.epa. qld.gov. au/ or visit Defence’s website.
http:/Avww.defence.gov.au/uxo/ for the details of current UXO investigation and remedial search
‘contractors. The EPA accepts reports based on investigative and remedial work carried out itby
these Sontractors.
Investigation and remedial action to satisfy Condition 1 typically involves sampling/search
programs with detection equipment unless the use of such equipment is:
S # considered unwarranted by a, UXO, contractor due to the extent of any prior « excavation or .
- earthworks orl conveisely, of any filling proposed as parte the development, Brogram., Ory yo
faye Es ma DOSE aN ars
on prevented or made impracticable by the presence of a structure, stockpile, natural, bartier Tag
or metal waste.
f
In the latter case, alternative action. ‘may be appropriate to minimise the risk in the first instance.
For exaniple, where the risk of exposure to any UXO that may exist is reduced by the presence of
a structure or natural barrier, issuance of the standard UXO warning. (see Condition 2) may suffice
while the structure, stockpile or barrier remains in place. Where a. structure is to be removed or
reduced as part of the development program, protective precautions, commensurate with any
greater risk to which workers might then be exposed, may need to be considered. Progressive
assessment will be necessary where such circumstances exist. Unless, at the completion of
preliminary works, there is evidence then available to the UXO contractor that any residual risk is
negligible, the use of detection equipment will typically be required to confirm the site’s status.
Where investigation, along with any subsequent remedial action and assessment, is to be
. Page‘4 of 5 » AF080109 o + - . Se Environmental Protection Agency
mee ee
-e i eis
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
09/0103 - Referral Agency Response - EPA [As Published]Related documentApplication case desk ↗
About this file
- File size
- 355 KB (small file)
- File type
No other editions are linked here.