Skip to the record
The definitive source for everything Noosa Council.

Council archive · source document

Attachment 5 - Documents referenced in conditions · OPW25/0012

of 49

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (25.3 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

Fauna Management Plan
3-7 Serenity Close, Noosa Heads

Action

Task Responsibility

5)

The limb and/or compensatory habitat / nest
box will then be placed in a cool, quiet
location until translocation to the recipient
habitat site, when at dusk the hollow
entrance is re-opened to allow the fauna to
emerge of its own accord.

Timing

 

Directional
vegetation
clearing

1)

2)

Directional vegetation clearing is to be Contractor,
employed guide fauna towards retained Fauna Spotter,
vegetation at the south of the site, allowing Site Manager
fauna to leave the site and access retained

habitat without human intervention. Refer to

Figure 4 for clearing areas and direction of

clearing.

Habitat trees of high importance should be

felled last, after surrounding less important

vegetation has been cleared to allow easy

access of special plant and equipment (such

as cherry pickers), and to allow unhindered

lowering of hollow-bearing limbs. It is not

acceptable to fell or push over hollow-

bearing trees without first removing wildlife,

due to the high risk of severe deceleration

and/or crushing injuries to wildlife inhabiting

such trees.

During
vegetation
clearing

 

1)

2)

Retained trees are to be protected in
accordance with Australian Standard 4970-
2009 Protection of trees on development
sites as outlined in the approved Vegetation
Management Plan.

The approved Vegetation Management Plan
is to be provided to all contractors and
personnel involved in clearing and
construction activities on the site.

 

All machinery
is to be
checked for
fauna before
the beginning
of operations

1)

2)

Visually check all the machinery for the Fauna Spotter,
presence of fauna before the start of Site Manager
construction.

Visually check all the routes for the presence

of fauna before allowing construction to

start.

Immediately
prior and
during
vegetation
clearing

 

Restrict vehicle
access

LTORIAS

1)

2)

3)

No vehicle access to areas of vegetation yet Site Manager
to be cleared.

Access is prohibited to vehicles outside of

construction machinery.

Set lower vehicle speeds around the site so

that motorists have a longer response time

During
vegetation
clearing

17 | 35

Used in these records

About this file

File size
25.3 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 5 - Documents referenced in conditions.pdf · 25.3 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.