Skip to the record
The only place to find full transcripts.

Council archive · source document

Attachment 5 - Documents referenced in conditions · OPW25/0012

of 49

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (25.3 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

Fauna Management Plan
3-7 Serenity Close, Noosa Heads

Action Task Responsibility Timing
Adaptive 1) Project manager to conduct regular Site Manager During
management, inspections to ensure compliance with vegetation
monitoring and procedures outlined in this plan. clearing
compliance 2) Project manager to issue notice of

compliance to contractor for non-conforming
works and any remedial works to ensure
compliance.

 

 

FIGURE 4: DIRECTION AND SEQUENCES OF CLEARING.

4.2.2 EQUIPMENT AND REMOVAL TECHNIQUES

During clearing works, the following special equipment may be required by the Fauna
Spotter and/or the clearing contractor:

e Standard personal protective equipment (PPE), including hard hat and steel capped
boots;
e First aid kit;

LORI 19135

Used in these records

About this file

File size
25.3 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 5 - Documents referenced in conditions.pdf · 25.3 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.