Council archive · source document
Attachment 5 - Documents referenced in conditions · OPW25/0012
Very large file (25.3 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
Fauna Management Plan 3-7 Serenity Close, Noosa Heads Action Task Responsibility Timing Adaptive 1) Project manager to conduct regular Site Manager During management, inspections to ensure compliance with vegetation monitoring and procedures outlined in this plan. clearing compliance 2) Project manager to issue notice of compliance to contractor for non-conforming works and any remedial works to ensure compliance. FIGURE 4: DIRECTION AND SEQUENCES OF CLEARING. 4.2.2 EQUIPMENT AND REMOVAL TECHNIQUES During clearing works, the following special equipment may be required by the Fauna Spotter and/or the clearing contractor: e Standard personal protective equipment (PPE), including hard hat and steel capped boots; e First aid kit; LORI 19135
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 5 - Documents referenced in conditions.pdfRelated documentApplication case desk ↗
About this file
- File size
- 25.3 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.