Council archive · source document
Attachment 5 - Documents referenced in conditions · OPW25/0012
Very large file (25.3 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
Fauna Management Plan 3-7 Serenity Close, Noosa Heads 5 COMPLIANCE AND MONITORING 5.1. COMPLIANCE Compliance with the Fauna Management Plan will be achieved through self-administered monitoring of the Plan and any conditions imposed by the State as part of the changed referral agency response. Prior to the commencement of works and throughout the period in which vegetation clearing or removal occurs, all personnel entering the site must familiarise themselves with the Fauna Management Plan and acknowledge their responsibility to comply with the Plan’s requirements. A copy of the proposed site personnel register is contained in Appendix 2. LTORIAS 32 | 35
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 5 - Documents referenced in conditions.pdfRelated documentApplication case desk ↗
About this file
- File size
- 25.3 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.