Council archive · source document
APPROVED Plans · OPW11/0116
Plans and drawings: the text below has words only, no drawings.
LOCALITY PLAN NOOSA SPIT ReenacT] SUNSHINE COAST RE NAL COUNCIL APPROVED OPW 1101146 18 JUL 2011 NOTES 1. Estimated volume for foreshore nourishment ~9,000m*, 2. All material placed on the foreshore to be clean sand suitable for nourishment. 3. Adjacent to groyne, profile to widen such that new HAT alignment to be in accordance with drawing NRS-005. Nourished HAT Alignment Existing MHWS Alignment Sm Reprofile to top of bank as required. Lowest of Design nourished profile RL 1.06m AHD or top of bank Wv. NSL [varies] a i= LEGEND [VERTICAL DATUM AND [HORIZONTAL DATUM: MGA REVISION REGISTER fe OAT CESCRPTON | ev [ENS International Coastal Management OFFICE 50/G Arm, SYC Marina, Main Beach, 4217, QLD, Austala POST PO Box 206, Main Beach LPO, Main Beach QLD, 4217, Austra TELEPHONE +61755640564 FAX +617 55329147 WEBSITE vwe.coastalmansgementcom.eu PROJECT NAME NOOSA RIVER SPIT RAWING TITLE NOURISHMENT TYPICAL PROFILE [BRAWING No. REVERE NRS-010 B DRAWN RD [ereCKED: Be PPROVED AT piel es PEO 2876 Ze: AS [SCALE : 1:200 DATE : 01 Apr, 2017
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
APPROVED PlansRelated documentApplication case desk ↗
About this file
- File size
- 7.9 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.