Skip to the record
Beware of cheap imitations.

Council archive · source document

APPROVED Plans · OPW11/0116

of 12

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
 

 

 

 

LOCALITY PLAN

NOOSA SPIT

 

ReenacT]

SUNSHINE COAST RE NAL COUNCIL
APPROVED
OPW 1101146 18 JUL 2011

 

 

 

 

NOTES

1. Estimated volume for foreshore nourishment
~9,000m*,

2. All material placed on the foreshore to be
clean sand suitable for nourishment.

3. Adjacent to groyne, profile to widen such that
new HAT alignment to be in accordance with
drawing NRS-005.

Nourished HAT Alignment
Existing MHWS Alignment

 

Sm Reprofile to top of bank as required.

Lowest of
Design nourished profile RL 1.06m AHD

or top of bank
Wv.

 

 

 

 

NSL [varies] a i=

 

 

 

 

 

 

 

 

 

 

 

LEGEND

[VERTICAL DATUM AND [HORIZONTAL DATUM: MGA

REVISION REGISTER

fe OAT CESCRPTON | ev [ENS
International
Coastal
Management

OFFICE 50/G Arm, SYC Marina, Main Beach, 4217, QLD, Austala
POST PO Box 206, Main Beach LPO, Main Beach QLD, 4217, Austra
TELEPHONE +61755640564 FAX +617 55329147
WEBSITE vwe.coastalmansgementcom.eu

 

 

 

 

 

 

PROJECT NAME
NOOSA RIVER SPIT
RAWING TITLE
NOURISHMENT
TYPICAL PROFILE
[BRAWING No. REVERE
NRS-010 B
DRAWN RD [ereCKED: Be PPROVED AT
piel es
PEO 2876
Ze: AS [SCALE : 1:200 DATE : 01 Apr, 2017

 

 

 

 

 

 

 

Used in these records

About this file

File size
7.9 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

APPROVED Plans.pdf · 7.9 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.