Council archive · source document
APPROVED Plans · OPW11/0116
Plans and drawings: the text below has words only, no drawings.
NOOSA SPIT eae Dredging for interim navigation access ONLY. No ongoing maintenance dredging. Dredging is to be entirely within water allocation area [NRS-RE-001]. Final location & extent to be determined after pre-start survey to accommodate channel movement prior to works, Middle channel presently dominant. Aerial photo [Feb 2011] overlay is approximate only. Itis anticipated that dredging works will Include enhancement [widening & deepening] of existing channel. May Involve enhancement or creation of secondary channel to provide alternative access if required, Expected volume: < 20,000m3, Temporary navigation alds to be provided by the Contractor throughout the works to the satisfaction of Regional Harbour Master. Permanent navigation aids to be installed as requires by Regional Harbour Master. Refer to additional drawings Dredge Area NRS-009. 7 [LEGEND Dredge Area RP Boundary REVISION REGISTER | | | : 3 ‘ ; 4 A coe FeriokS eprom | eva, OATE TPTOH ENG APA ; , International | _—— Coastal Salle : 5 ; Management G Arm, SYC Marina, Maln Beach, 4217, QLD, Austaia PO Box 306. Main Beach LPO, Main Beach QLD, 4217, Australia 23 | Co. he | | PROJECT NAME NOOSA RIVER SPIT A c | .
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
APPROVED PlansRelated documentApplication case desk ↗
About this file
- File size
- 7.9 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.