Log in to see the plans as drawnDEMOLITION PLAN
1:200 ISSUE FOR CONSTRUCTION
5496 22/11/2021
EXISTING FUEL
BOWSER TO REMAIN
=
JETTY SECTION REMOVED JETTY SECTION PONTOON, GANGWAY
REMOVED AND PILES REMOVED
160
CP908649 Lo
PONTOON, GANGWAY & PILE
TO BE REMOVED
ai
=== ===
DEMOLITION PLAN
1:200 ISSUE FOR CONSTRUCTION
Je} = THE MARINA SPECIALIST SURVEY DATA CLIENT: ME EXISTING STRUCTURES PLAN
Crichton EDGE Consulting Engineers QO BOAT HIRE
P.O Box 6148
Woollongabba, QLD 4102 TRADING AS ACN 010633119 18 RON PARKINSON CRES |pATUM 222 GYMPIE TERRACE
CORBOULD PARK
Ph: +61 7 3367 3570 THE jetty. HORIZ. NOOSAVILLE DATE: UNITS | SCALE: SHEET: A8
CONSULTING QLD 4551 AUSTRALIA
CRESS ABN 66 099 997 985 [email protected] GRID PROJECT: 14/09/2021 MM 1:200
PHONE(07) 5492 5925 | HEI
Naw |AHD. DERRIVED PROPOSED FINGER PONTOON’S
FOR APPROVAL Kd 13/10/21|_MK CHECKED: fy, ft RPEQ: DATE = SPECIALIST ORI DRAWN: CHECKED: APPRD: |DRG No: REV:
REV DESCRIPTION BY DATE _|APPD HUY 5496 22/11/2021 SURVEY & CATWALK’S TDB 34680—-03
BOOKSSee the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.