Development Application Part 2 of 2 - Plan and Site photos - OPW13/0614

of 18

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Very large file (13.9 MB): may take a few minutes to open.

Log in to see the plans as drawn
                                       Place b.,code he"     1 ~1~l l il l~ iI~ml~i~l l~! (3
                                                                   X0008969

           THIS IS THE FIRST PART OF A
   MULTIPLE PART RECORD

            Checklist \ Part                         4f ~
                                    (Please Circle)                               Box   .
                                                                                              t9SQ )R. f’0
                                                                                            ...
                                                                                                       .
                                                                                                             ..




                                                                                                           ’fF>
Application number:                                  Dpwls/D6!$L-
                                                       ~               }            f




De~’ 10;If,
   ."""
       ~
            -



                 C:lDocuments and
         SettingslejelDesk<ORlMulti             Re     S e      ST PART (4).doc




    M"~
      C4.lv C,,’
           ~.~



              ....,IJ~
                      .’)  ’.
Full text of the other 17 pages

Page 2

....:.:.--"=-~




                 ~’.’




..!

Page 3

     ill1
                                                                                                                                                             COORD I NA TES
                                                                                                                                Reference     East               North           Elevat ion               Description
                                                                                                                                AC2         507332.173       7080708.068               0.685            TOE     OF"    BAG
                                                                                                                                AC3         507333.115       7080709.074                1.314           TOP     OF"    BAG
                                                                                                                                AC4         507333.867       7080708.837                1   .
                                                                                                                                                                                                4 12    BACK      OF    BAG
                                                                                                                                AC5         507334.417       7080711. 130               1.275           BACK      OF"   BAG
                                                                                                                                AC6         507333.404       7080711.608                1. 198            TOP   OF     BAG

                                                                                                                                AC8         507332.801       7080711.776               0.313              TOE   OF     BAG
                                                                                                                                AC9         507334.386       7080714.076               0.364              TOE   OF"    BAG
                                                                                                                                AC10        507334.874       7080713.544                1.206             TOP   OF"     BAG
                                                                                                                                AC 11       507335.870       7080713.083                1.207           BACK      OF"    BAG
                                                                                                                                AC12        507338.632       7080715.690                1   .
                                                                                                                                                                                                2 10    BACK      OF"    BAG
                                                                                                                                AC 13       507337.953       7080716.665                1   .
                                                                                                                                                                                                 170      TOP    OF"    BAG
                                                                                                                                AC14        507337.333       7080717.049               o. 123             TOE    OF"    BAG
                                                                                                                                AC19        507343.749       7080722.091               0.385              TOE    OF"    BAG
                                            /.                                                                                  AC20        507344.080       7080721.752                1. 185            TOP    OF"    BAG
                                                                                                                                AC21        507344.799       7080720.890                1   .
                                                                                                                                                                                                314     BACK      OF"    BAG
                                                                                                                                AC22        507352.203       7080726.031                1. 187          BACK      OF"    BAG
                                                                                                                                AC23        507352.097       7080727.234                1.226             TOP    OF"    BAG
                                                                                                                                AC24        507351.854       7080727. 739              0.433              TOE    OF"    BAG
                                AC19
                                                                                                                                AC25        507355.482       7080729.915               0.414              TOE    OF"    BAG
                                                                                                                                AC26        507356.038       7080729.054                1.264             TOP    OF" BAG
                                                                                                                                AC27        507356.505       7080729.131                1.682             TOP    OF     BAG

                                                                                                                                AC28        507356.440       7080728.277                1.285           BACK      OF"    BAG
                                                                                                                                AC29        507356.934       7080728.371                1.655           BACK      OF"    BAG

                                                                                                                                AC30        507367.601       7080734.994                1.506           BACK      OF"    BAG
                                                                                                                                AC31        507367.046       7080735.812                1.496             TOP    OF"    BAG
                                                                                                                                AC32        507366.514       7080736. 742               0.334             TOE    OF"    BAG
                                                                                                                                AC33        507378.043       7080743.201                0.281             TOE    OF"    BAG
                                                                                                                                AC34        507378.508       7080742.458                1.399             TOP    OF"    BAG
                                                                                                                                AC35        507379.084       7080741.721                1.482             BACK    OF"    BAG
                                                                                                                                AC36        507385.964       7080748.233              -0.008              TOE    OF"    BAG
                                                                                                                                AC37        507386.748       7080747.212                1.234             TOP    OF"    BAG

                                                                                                                                AC38        507386.847       7080746.064                1.254             BACK    OF"    BAG
                                                                                                                                AC39        507394.517       7080747.275                1.221             BACK    OF"    BAG
                                                                                                                                AC40        507393.953       7080748. 181               1.201             TOP    OF     BAG

                                                                                                                                AC41        507393.677       7080749.432                O. 159            TOE    OF     BAG
                                                                                                                                AC42        507404.620       7080749.535                0.410             TOE    OF"    BAG
                                                                                                                                AC43        507404.805       7080748.387                1.538             TOP    OF     BAG

                                                                                                                                AC44        507404.791       7080747.392               J.569              BACK    OF"    BAG     r.


                                                                                                                                AC45        507408.692       7086746.497                1.544             BACK    OF     BAG

                                                                                                                                AC46        507408.970       7080747.627                1.450             TOP    OF"    BAG

                                                                                                                                AC47        507408.783       7080748.313                0.627             TOE    OF"    BAG

                                                                                                                                AC48        507413.218       7080745.790                0.974             TOE    OF"    BAG

                                                                                                                                AC49        507413.261       7080745.579                1.372             TOP    OF"    BAG

                                                                                                                                AC50        507413.110       7080744.635                1    .
                                                                                                                                                                                                 41 1     BACK    OF"    BAG

                                                                                                                                AC51        507413.479       7080744.501                1.345             BACK    OF"    BAG

                                                                                                                                AC52        507413.752       7080745.390                1.284             TOP    OF"    BAG

                                                                                                                                AC53        507413.751       7080745.543                1    .
                                                                                                                                                                                                 120      TOE    OF"    BAG




Qi.w.i:                                           Horizontal Datum                                         Surve ved/Checked:                                                                                   103    Wrigley St
          CARRURUTHERS CONTRACTING                                                                                   ARK/PSC                                                                                    (Cnr    Sugar Rdl
                                                                                   Drawing Number:                                                                                                              PO Box    5774
                                                   MGA94                                                   Drawn/Checked:
                                                                                                                                                                                                                Maroochydore BC
Prolect:    G541    AS   CONSTRUCTED      PLAN                                                                       PSC
                                                                                                                                                                                                                MAROOCHYDORE
                                                  Vertical Datum     AHD dtlr                              Dote:
                                                                                135793-01                                                                                                                       QLD 4558
    Geofabrlc      Bags Along Foreshore                                                                              30/06/2010

    Russell Street Caravan                         vide   OPM 9078 (RL 1.2621
                                                                                                                                                    Surveying & Town Planning Ph 07 5479 5311
                               Park, Noosavllle                                 Sheet no. f of f sheets.
                                                                                                           Scale:
                                                                                                                    1:250 (.1 A 31
                                                                                                                                                                              Fax 07 5479 1289
                                                                                                                                              ACN 098 201 828 Part of CadCon International      Pty Ltd    codc on~cad co n.com.a

Page 4

                                                                                                                                                       Response column key:
                                                                                                                                                                  Achieved
10.1       Tidal works, or development in a coastal management district state code                                                                            PIS Performance solution
                                                                                                                                                              N/A Not applicable
Table 10.1.1: All development

Performance outcomes                             Acceptable outcomes                                            Response   Comment

P01 Development in a coastal hazard             A01.1 Development is located outside a high coastal             Achieved   These works are located within a coastal hazard area
area is   compatible with the level of           hazard area unless it is:                                                 (erosion prone area) and are considered to be essential as
severity of the coastal hazard.                 (1) coastal-dependent development, or                                      they are for the protection of the Noosa River Caravan Park
                                                (2) temporary, readily relocatable, or able to be                          located at Munna Point.
                                                      abandoned,or
                                                (3) essential community service infrastructure, or
                                                (4) small- to medium-scale tourist development, or
                                                (5) development that is compatible with temporary                                                                                   .

                                                     inundation due to its nature or function, or
                                                (6) within an existing built-up urban area, or is
                                                    redevelopment of built structures that cannot be
                                                      relocated or abandoned.
                                                AND
                                                A01.2 Development referred to in A01.1(6) avoids being          N/A        These works do not involve the redevelopment of built
                                                 located within a high coastal hazard area, or where this is               structures.
                                                 not practicable, minimises the exposure of people and
                                                 permanent structures to coastal hazard impacts and
                                                 mitigates residual impacts where it is not practicable to
                                                 locate the development outside a high coastal hazard
                                                 area.


P02 Development siting, layout and              A02.1 Development within a coastal hazard area is               Achieved   These works enhance the Noosa River Caravan Park’s
access in a coastal hazard area                  located, designed, constructed and operated to maintain                   resilience to storm tide events.
responds to a potential coastal hazard          or enhance the  community’s resilience to defined storm
and minimises risk to personal safety and       tide events and coastal erosion by limiting the exposure of
property.                                       people and structures to coastal hazard impacts and
                                                ensuring:
                                                (1) habitable rooms of built structures are located above
                                                     the defined storm tide event level and any additional
                                                     freeboard level that would ordinarily apply in a flood
                                                      prone area under a relevant planning scheme
                                                     standard, or
                                                (2) a safe refuge is available for people within the
                                                    premises during a defined storm tide event, or
                                                (3) at least one evacuation route remains passable for
                                                    emergency evacuations during a defined storm tide
                                                    event, including consideration of the capacity of the
                                                    route to support the evacuation of the entire local
                                                    population within a reasonably short time frame (for



State development assessment provisions                                          Module 10-Coastal protection                   21 June 2013                                       Page 1 of 15
10.1 Tidal works, or development in a coastal management district state code

Page 5

Performance outcomes                           I Acceptable outcomes                                                Response    I Comment                                                        I
                                                     example, 12 hours).
                                                AND

                                                A02.2 Development within a coastal hazard area is                   Achieved     These works enhance the Munna Point Caravan Parks
                                                located, designed and constructed to ensure exposed                              resilience to storm tide events.
                                                structures can sustain flooding from a defined storm tide
                                                event.
                                                AND

                                                A02.3 Essential community service infrastructure is:                N/A          These works do not include any community infrastructure.
                                                (1) located so that it is not inundated by a recommended
                                                    storm tide event specified for that infrastructure, or

                                                (2) located and designed to ensure any components of
                                                    the infrastructure that are likely to fail to function or
                                                    may result in contamination when inundated by a
                                                    storm tide (for example, electrical switch gear and
                                                    motors, water supply pipeline air valves) are:
                                                    (a) located above the peak water level for a
                                                           recommended storm tide event, or
                                                     (b) designed and constructed to exclude storm tide
                                                         intrusion or infiltration (including by being located
                                                         in the ground), or
                                                                                                                                                       ".

                                                     (c) able to temporarily stop functioning during a
                                                         recommended storm tide event without causing
                                                         significant adverse impacts to the infrastructure
                                                         or the community.

                                                AND

                                                A02.4 Emergency services infrastructure and emergency               N/A          These works do not impact any emergency services
                                                shelters, police facilities, and hospitals and associated                        infrastructure.
                                                facilities have an emergency rescue area above the peak
                                                water level for a recommended storm tide event.
                                                AND
                                                A02.5 Redevelopment of existing built structures avoids             N/A          The work does not involve the redevelopment of existing
                                                increasing the exposure of people and permanent                                  structures.
                                                structures to adverse coastal hazard impacts (including
                                                impacts on the development’s ongoing operation).
P03 Development directly, indirectly and        A03.1 Development avoids increasing the number of                   Achieved.    These works reduce erosion risk at Munna Point and
cumulatively avoids an unacceptable             premises from which people would need to be evacuated                            therefore do not increase the severity of the coastal hazard.
increase in the severity of the coastal         to prevent death or injury from a defined storm tide event.

hazard, and does not significantly
increase the potential for damage on the
premises or to other premises.
P04 Development avoids the release of           A04.1 Development that involves the manufacture or                  N/A          These works do not involve the manufacture or storage of



State development assessment provisions                                          Module 10   -
                                                                                               Coastal protection                     21 June 2013                                  Page 2 of 15
10.1 Tidal works, or development in a coastal management district state code

Page 6

Performance outcomes                             Acceptable outcomes                                              Response   Comment

hazardous materials as a result of a            storage of hazardous materials in bulk are designed to:                      hazardous materials.
natural hazard event.                           (1) prevent the intrusion of waters from a defined storm
Editor’s note: Applications should:                 tide event into structures or facilities containing the
                                                    N/Ahazardous materials, or
(1) assess the risk of storm tide inundation    (2) ensure hazardous materials remain secured despite
    releasing or otherwise exposing                 inundation, induding secure from the effects of
    hazardous materials, including
                                                    hydrodynamic forcing associated with wave action or
    appropriate emergency planning and
                                                     flowing water.
    contingency measures.
(2) applications are to be supported by a
    report certified by a Registered
    Professional Engineer of Queensland
    (RPEQ)that demonstrates this
    performance outcome will be achieved.
POS Natural processes and the                   AOS.1 Development in an erosion prone area within the             N/A        These works do not indude development in the coastal
protective function of landforms and             coastal management district:                                                zone.

vegetation are maintained in coastal            (1) maintains vegetation on coastal landforms where its
hazard areas.                                       removal or damage may:
Editor’s note: Applications should be               (a) destabilise the area and increase the potential
supported by a report certified by an RPEQ                for erosion, or
that demonstrates this performance outcome
                                                      (b) interrupt natural sediment trapping processes or
will be achieved.
                                                          dune or land building processes
                                                (2) maintains sediment volumes of dunes and near-shore
                                                     coastal landforms, or where a reduction in sediment
                                                     volumes cannot be avoided, increased risks to
                                                     development from coastal erosion are mitigated by
                                                     location, design, construction and operating
                                                     standards
                                                (3) maintains physical coastal processes outside the
                                                    development footprint for the development, including
                                                    longshore transport of sediment along the coast
                                                (4) reduces the risk of shoreline erosion for areas
                                                    adjacent to the development footprint unless the
                                                    development is an erosion control structure
                                                (5) reduces the risk of shoreline erosion for areas
                                                    adjacent to the development footprint to the
                                                      maximum extent feasible in the case of erosion
                                                     control structures.
                                                AND

                                                AOS.2 Development in a storm tide inundation area is              N/A        These works do not indude development in the coastal
                                                 located, designed, constructed and operated to:                             zone.

                                                (1) maintain dune crest heights, or where a reduction in
                                                     crest heiQhts cannot be avoided, mitiQate risks to




State development assessment provisions                                         Module 10   -
                                                                                             Coastal protection                   21 June 2013                              Page 3 of 15
10.1 Tidal works. or development in a coastal management district state code

Page 7

Performance outcomes                           I Acceptable outcomes                                                     Response   I Comment                                                        I
                                                      development from wave overtopping and storm surge
                                                      inundation
                                                (2) maintain or enhance coastal ecosystems and natural
                                                      features, such as mangroves and coastal wetlands,
                                                      between the development and tidal waters, where the
                                                      coastal ecosystems and natural features protect or
                                                      buffer communities and infrastructure from sea level
                                                      rise and impacts from storm tide inundation.
                                                AND

                                                A05.3 Redevelopment of built structures in the erosion                   N/A         These works do not iiwolve the redevelopment of built
                                                prone area within a coastal   management district:                                   structures in the erosion prone area and therefore A05.3 is
                                                (1) avoids intensifying the use of the premises, or                                  not applicable.

                                                (2) demonstrates that any intensification of use will not
                                                    result in a significant increase in foreshore or bank
                                                    hardening due to:
                                                    (a) the presence of existing erosion control
                                                         structures on or adjacent to the property, or

                                                    (b) the existing necessity to install erosion control
                                                            structures to defend built structures on the
                                                            property from an imminent threat of coastal
                                                            erosion.                                                                                       ",




                                                AND

                                                A05.4 Development that is coastal protection work                        Achieved    Following ongoing erosion issues these works involve the
                                                involves:                                                                            construction of a geotextile sand bag wall for the protection
                                                (1) beach nourishment undertaken in accordance with a                                of the Noosa River Caravan Park.
                                                      program of beach nourishment works that source
                                                      sediment of a suitable quality and of a type and size
                                                                                                                                     These works were completed under emergent works in
                                                      which match that of the native sediment usually found
                                                                                                                                     accordance with Section 585 of the Sustainable Planning
                                                      at the location, or
                                                                                                                                     Act 2009 which allows for tidal works to be constructed
                                                (2) the construction of an erosion control structure,                                without a development approval in an emergency.
                                                    where it is demonstrated that installing an erosion
                                                                                                                                                         ,.

                                                    control structure is the only feasible option for
                                                    protecting permanent structures from coastal erosion                             These works are considered to be temporary works for the
                                                      at those structures cannot be abandoned or relocated                           protection of the Noosa River Caravan Park. As such
                                                      in the event of coastal erosion occurring.                                     RPEQ certification was not required.
                                                Editor’s note: Applications for coastal protection work should be
                                                supported by a report certified by an RPEQ that demonstrates
                                                how the engineering solution sought by the work will be achieved.


                                                 Editor’s note: Applications for erosion control structures should
                                                demonstrate the consideration of beach nourishment techniques,
                                                and include a statement of why nourishment (in whole or part)
                                                 has not been adopted as the preferred means of controllinq the




State development assessment provisions                                              Module 10   -
                                                                                                    Coastal protection                    21 June 2013                                   Page 4 of 15
10.1 Tidal works, or development in a coastal management district state code

Page 8

Performance outcomes                             Acceptable outcomes                                                Response   Comment
                                                 erosion risk.


                                                 AND

                                                A05.5 Development involving reclamation:                            N/A        These works do not involve reclamation.
                                                (1) does not alter, or otherwise minimises impacts on,
                                                    the physical characteristics of dune systems,
                                                    induding dune crest height and sand volume
                                                (2) does not alter, or otherwise minimises impacts on,
                                                      the physical characteristics of a waterway or the
                                                      seabed near the reclamation, induding flow regimes,
                                                      hydrodynamic forces, tidal water and riverbank
                                                      stability
                                                (3) is located outside the active sediment transport area,
                                                      or otherwise maintains sediment  transport processes
                                                      as dose aspossible to their natural state
                                                (4) ensures activities associated with the operation of the
                                                    development maintain the structure and condition of
                                                    vegetation communities and avoid wind and water
                                                      run-off erosion.

P06 Erosion prone areas in a coastal             A06.1 Development locates built structures outside the             N/A        These works do not involve any development e.g. habitable
management district are maintained as           part of the coastal management district that is the erosion                    built structures, lifesavers towers or other premises.
development free buffers, or where              prone area unless the development:
penn anent buildings or structures exist,       (1) is coastal-dependent development, or
coastal erosion risks are avoided or            (2) is temporary, readily relocatable, or able to be
mitigated.                                           abandoned, or
                                                (3) is essential community service infrastructure, or
                                                (4) is located landward of an applicable coastal building
                                                      line, or
                                                (5) is located landward of the alignment of adjacent
                                                    habitable buildings if there is no coastal building line,
                                                      and on a lot that is less than 2000 square metres in
                                                      size, or
                                                (6) is redevelopment of existing built structures, or
                                                (7) is coastal protection work, or
                                                (8) locates built structures landward of other penn anent
                                                      built structures that are likely to be defended from
                                                      coastal erosion, if it is demonstrated the development
                                                      cannot reasonably be located outside the erosion
                                                   prone area.
                                                AND

                                                A06.2 Development referred to in A06.1(4), (5)or (8)                N/A        These works do not indude development referred to
                                                                                                                                                      \’
                                                 above ensures sufficient space is provided seaward of the                     A06.1 (4),(5)or (8).



State development assessment provisions                                           Module 10   -
                                                                                               Coastal protection                   21 June 2013                                   Page 5 of 15
10.1 Tidal works, or development in a coastal management district state code

Page 9

                                                                                                                                                                                              I
Performance outcomes                          I Acceptable outcomes                                                Response   ! Comment
                                                development within the premises to allow for the
                                                construction of erosion control structures (such as a
                                                seawall).
                                                AND

                                                A06.3 Coastal-dependent development:                               N/A         These works do not involve the construction of
                                                (1) locates, designs and constructs relevant buildings or                      buildings/structures.
                                                     structures to withstand coastal erosion impacts,
                                                     including by use of appropriate foundations
                                                     or                                                                                                -




                                                (2) installs and maintains coastal protection works to
                                                    mitigate adverse impacts to people and permanent
                                                     structures from coastal erosion at the location.
                                                AND

                                                A06.4 Development that is temporary, readily relocatable,          N/A         These works do not involve any development e.g. habitable
                                                able to be abandoned, or essential community service                           built structures, lifesavers towers or other premises.
                                                infrastructure:
                                                (1) locates built structures landward of an applicable
                                                    coastal building line
                                                (2) where there is no coastal building line, locates
                                                    habitable built structures landward of the alignment of
                                                    adjacent habitable buildings
                                                (3) locates lifesaver towers or beach access
                                                    infrastructure to minimise its impacts on physical
                                                     coastal processes
                                                     or

                                                (4) where it is demonstrated that (1)or (2)is not
                                                    reasonable and (3)does not apply:

                                                    (a) locates built structures as far landward as
                                                        practicable
                                                    (b) uses layout design to minimise the footprint of
                                                        the development that remains within the erosion                                                -




                                                           prone area.
                                                AND

                                                A06.5 Redevelopment of existing built structures not               N/A         These works do not involve the redevelopment of existing
                                                 referred to in A06.4, and excluding marine development:                       built structures.
                                                (1) relocates built structures outside that part of the
                                                     erosion prone area that is within the coastal
                                                     management district, or
                                                (2) relocates built structures as far landward as
                                                    practicable, and landward of an applicable coastal
                                                    building line, or



State development assessment provisions                                          Module 10   -
                                                                                              Coastal protection                    21 June 2013                                   Page 6 of 15
10.1 Tidal works, or development in a coastal management district state code

Page 10

Performance outcomes                             Acceptable outcomes                                                 Response    Comment

                                                (3) where there is no coastal building line, relocates built
                                                    structures landward of the alignment of adjacent
                                                    habitable buildings, or
                                                (4) uses layout design to minimise the footprint of the
                                                    development that remains within the erosion prone
                                                      area, or
                                                (5) provides sufficient space seaward of the development
                                                      within the premises to allow for the construction of
                                                      erosion control structures.
                                                AND

                                                A06.6 Redevelopment of built structures in the erosion               N/A         These works do not involve the redevelopment of existing
                                                 prone area within a coastal management district, which                          built structures.
                                                 results in an intensification of use, mitigates the erosion
                                                threat to the development, having regard to:
                                                (1) use of appropriate foundations for the building or
                                                    structure, given the practical design life of the
                                                    development
                                                (2) installing and maintaining on-site erosion control
                                                    structures if the development is not intended to be
                                                      temporary.
                                                AND

                                                A06.7 Development that is coastal protection work:                   Achieved.   These works are for coastal protection in the form of beach
                                                (1) is in the form of beach nourishment that maintains the                       nourishmenUerosion control structures, and seek to maintain
                                                      natural characteristics and landform of the beach or                       the natural characteristics of the beach.
                                                      foreshore
                                                 or

                                                (2) is in the form of an erosion control structure where
                                                    beach nourishment is not feasible for addressing the
                                                      risk of coastal erosion, and the erosion control
                                                      structure is located on private land to the maximum
                                                      extent feasible.

P07 Development avoids or minimises             A07.1 Coastal protection work that is in the form of beach           Achieved.   The coastal protection works use methods suitable for the
adverse impacts on coastal resources             nourishment uses methods of placement suitable for the                          location. The works do not interfere with the long-term use
and their values, to the maximum extent          location that do not interfere with the long-term use of the                    of the locality.
reasonable.                                      locality of, or natural values within or neighbouring, the
                                                 proposed placement site.
                                                 AND

                                                A07.2 Marine development is located and designed to                  N/A         These works are not marine development.
                                                 expand on or redevelop existing marine infrastructure
                                                 unless it is demonstrated that it is not practicable to
                                                 co-locate the development with existing marine




State development assessment provisions                                             Module 10   Coastal protection
                                                                                                -                                      21 June 2013                                 Page 7 of 15
10.1 Tidal works, or development in a coastal management district state code

Page 11

                                                                                                                             I

Performance outcomes                           I Acceptable outcomes                                              Response
                                                                                                                             ’
                                                                                                                                 Comment
                                                 infrastructure.

                                                AND

                                                A07.3 Marine development:                                         N/A            These works are not marine development.
                                                (1) relies on a natural channel of a depth adequate for
                                                     the intended vessels, or
                                                (2) where there are no feasible alternative location for
                                                    the facility in the local area that do not require
                                                    dredging for navigation channel purposes:                                                        -




                                                    (a) involves capital dredging for new navigation
                                                           channel purposes
                                                     (b) is located, designed and operated to minimise
                                                         the need for capital and subsequent
                                                         maintenance dredging for navigation channel
                                                           purposes.
                                                AND

                                                A07.4 Development minimises capital dredging or the               N/A            These works do not include dredging or disposal of material
                                                disposal of material in coastal waters during key biological                     during key biological events.
                                                events (such as fish aggregations or spawning)for
                                                species found in the area.
                                                AND

                                                A07.5 Measures are to be incorporated as part of siting           N/A            A07.5 is not relevant to these works.
                                                and design of the development to protect and retain
                                                 identified ecological values and underlying ecosystem
                                                 processes within or adjacent to the development site to
                                                the greatest extent practicable. This includes:
                                                (1) maintaining or restoring vegetated buffers between
                                                    development and coastal waters to the extent
                                                    practicable, unless the development is within ports or
                                                    airports, or is marine development
                                                (2) maintaining or enhancing the connectivity of                                                     -




                                                    ecosystems in consideration of the cumulative effect
                                                    of the development in addition to existing developed
                                                     areas

                                                (3) retaining coastal wetlands, seagrass beds and other
                                                    locally important feeding, nesting or breeding sites for
                                                      native wildlife.

                                                AND

                                                 A07.6 Measures are incorporated as part of siting and            N/A            A07.6 is not relevant to these works.
                                                 design of the development to maintain or enhance water
                                                 quality to achieve the environmental values and water
                                                 quality objectives outlined in the Environmental Protection


State development assessment provisions                                          Module 10   Coastal protection
                                                                                             -
                                                                                                                                      21 June 2013                                 Page 8 of 15
10.1 Tidal works, or development in a coastal management district state code




                                                                                                                                                                                                  r

                                                                                                                                                                                                  J

Page 12

                                                                                                                                                    "




Performance outcomes                             Acceptable outcomes                                                Response    Comment

                                                 (Water)Policy 2009.
                                                 AND

                                                 A07.7 Development avoids the disturbance of acid                   N/A         These works involve construction of a geotextile sand bag
                                                 sulphate soils, or where it is demonstrated that this is not                   wall on ground level.
                                                 possible, the disturbance of acid sulphate soils is carefully
                                                 managed to minimise and mitigate the adverse effects of
                                                 the disturbance on coastal resources.


P08 Coastal protection work is                   A08.1 Coastal protection work is only undertaken to                Achieved    These works were required to protect existing structures
undertaken only as a last resort INhere          protect existing permanent structures from imminent                            from imminent adverse coastal erosion impacts at the
erosion presents an imminent threat to           adverse coastal erosion impacts, and the structures                            Noosa River Caravan Park at Munna Point.
public safety or permanent structures.           cannot reasonably be relocated or abandoned.

Editor’s note: Applications for coastal          AND
protection work must be supported by a           A08.2 Coastal protection work is undertaken on private             N/A         Works undertaken on State owned land (reserve for
report certified by an RPEQ that                 land to the maximum extent reasonable.                                         Camping and Recreation, Sunshine Coast Council as
demonstrates how the engineering
                                                 AND                                                                            trustee).
solution sought by the work will be
achieved.                                        A08.3 Coastal protection work does not increase the                Achieved.   These works do not increase the coastal hazard risk for
                                                 coastal hazard risk for adjacent areas or properties.                          adjacent areas.

P09 Development avoids adverse                  A09.1 Development:                                                  N/A         A09.1 is not applicable to these works.
impacts on matters of national                  (1) is set back from matters of national environmental
environmental significance and matters              significance or matters of state environmental
of state environmental significance, or             significance
where this is not reasonably possible,          (2) avoids interrupting, interfering or otherwise adversely
impacts are minimised and residual                  impacting underlying natural ecosystem components
impacts are offset.                                  or processes and interactions that affect or maintain

                                                     the matters of national environmental significance or
                                                      matters of state environmental significance, such as
                                                     water quality, hydrology, geomorphology and
                                                    biological processes, or
                                                (3) incorporates measures as part of its location and
                                                    design to protect and retain matters of national
                                                    environmental significance or matters of state
                                                    environmental significance and underlying ecosystem
                                                    processes within and adjacent to the development
                                                    site to the greatest extent practicable.
                                                Editor’s note: Applications for development should identify any
                                                threatened species or their habitats, or threatened ecosystems,
                                                that may be affected by the proposal. In particular, applications
                                                should identify and describe how the development avoids
                                                adverse impacts on any critical life stage ecological processes
                                                within or adiacent to the development area.




State development assessment provisions                                             Module 10-Coastal protection                     21 June 2013                                 Page 9 of 15
10.1 Tidal works, or development in a coastal management district state code

Page 13

Performance outcomes                           I Acceptable outcomes                                                   Response    I Comment                                                    I
                                                AND

                                                A09.2 An environmental offset is provided for any                      N/A          A09.25 is not applicable to these works.
                                                 unavoidable significant residual impact on matters of state
                                                environmental significance caused by the development.

                                                Editor’s note: Applications for development should identify
                                                anticipated losses, and outline what actions are proposed to be
                                                 undertaken to offset the loss in accordance with the relevant
                                                 Queensland Government Environmental Offset Policy available
                                                                                                                                                        .’
                                                from the Department of Environment and Heritage Protection
                                                 library catalogue.

P010 Development maintains or                   AO 1 0.1   Developm ent adjacent to state coastal land or              Achieved.    This work maintains public access to the foreshore.
enhances general public access to or            tidal water:
along the foreshore, unless this is             (1) demonstrates that restrictions to public access are
contrary to the protection of coastal                 necessary for:
resources or public safety.                           (a) the safe or secure operation of development, or
                                                      (b) the maintenance of coastal landforms and
                                                           coastal habitat
                                                (2) separates residential, tourist and retail development
                                                    from tidal water with public areas or public access
                                                      facilities, or
                                                (3) maintains existing public access (including public
                                                    access infrastructure that has been approved by the

                                                    local government or relevant authority) through the
                                                      site to the foreshore for:
                                                      (a) pedestrians, via access points including
                                                          approved walking tracks, boardwalks and
                                                          viewing platforms, or
                                                      (b) vehicles, via access points including approved
                                                           roads or tracks.
                                                AND

                                                A010.2 Development adjacent to state coastal land,                     Achieved.    Works maintain access to all necessary parties.
                                                including land under tidal water:
                                                (1) is located and designed to:
                                                     (a) allow safe and unimpeded access to, over, under
                                                           or around built structures located on, over or

                                                           along the foreshore
                                                      (b) ensure emergency vehicles can access the area
                                                          near the development, or

                                                (2) minimises and offsets any loss of access to and
                                                    along the foreshore within two kilometres of the
                                                    existing access points, and the access is located and


State development assessment provisions                                             Module 10   -
                                                                                                  Coastal protection                     21 June 2013                                 Page 10 of 15
10.1 Tidal works, or development in a coastal management district state code




                                                                                                                                                                                                      I

Page 14

Performance outcomes                             Acceptable outcomes                                                    Response   Comment

                                                      designed to be consistent with (1)(a) and (b).
                                                 AND

                                                 A010.3 Any parts of private marine development that                    N/A        A01 0.3 is not applicable to these works.
                                                 extend over tidal water are to be designed, constructed
                                                 and used for marine access purposes only.


P011 Development avoids structures               A011.1 Private marine development and other structures                 N/A        These works do not include private marine development or
attaching to, or extending across, non-          such as decks or boardwalks for private use do not attach                         structures including decks or boardwalks.
tidal state coastal land abutting tidal         to, or extend across state coastal land that is situated
waters.                                          above the high water mark.
                                                 Editor’s note: For occupation permits or allocations of State land,
                                                 refer to the Land Act 1994.



P012 Further development of canals, dry          A012.1 The design, construction and operation of artificial            N/A        These works do not involve the construction of canals, dry
land marinas and artificial waterways           tidal waterways maintains the tidal prism volume of the                            land marinas and artificial waterways.
avoids or minimises adverse impacts on           natural waterway to which it is connected.
coastal resources and their values, and          AND
does not contribute to:
                                                 A012.2 The design, construction and operation of artificial            N/A        These works do not involve the construction of canals, dry
(1) degradation of water quality
                                                tidal waterways does not increase the number of premises                           land marinas and artificial waterways.
(2) an increase in the risk of flooding
                                                 vulnerable to flooding from a defined storm tide event.
(3) degradation and loss of matters of
    national environmental significance          AND

    and matters of state environmental           A012.3 The location of artificial waterways avoids matters             N/A        The work does not involve the construction of canals, dry
    significance (including, but not             of national environmental significance and matters of state                       land marinas and artificial waterways.
    limited to, coastal wetlands, fish           environmental significance, or does not result in any
    habitat areas and migratory species          significant adverse effect on a matter of national
    habitat).                                    environmental significance or matter of state
                                                 environmental significance.


P013 Development does not involve                No acceptable outcome is prescribed.                                   N/A        The work does not inyolve land reclamation.
reclamation of land below the highest
astronomical tide, other than for the
purposes of:
(1) coastal-dependent developm ent,
    public marine development or
    community infrastructure
(2) strategic ports, boat harbours or
    strategic airports and aviation
    facilities, in accordance with a
    statutory land use plan, where there
    is a demonstrated net benefit for the                                                                                                              ..




    state or region and no feasible




State development assessment provisions                                              Module 10   -
                                                                                                   Coastal protection                   21 June 2013                                 Page 11 of 15
10.1 Tidal works. or development in a coastal management district state code

Page 15

                                                                                                                             I                                                                  I

Performance outcomes                            I Acceptable outcomes                                             Response       Comment                                                        :
    alternative exists
(3) coastal protection work or work
     necessary to protect coastal
     resources or physical coastal
    processes.



Table 10.1.2: Operational work

Performance outcomes                            I Acceptable outcomes                                             Response       Comment

P01 Tidal works that is private marine           A01.1 The location and design of tidal works that is             N/A            The work is not private marine development.
development does not result in adverse           private marine development:
impacts to tidal land.                           (1) is on private land abutting state tidal land and used
Editor’s note: In addressing this performance        for property access purposes
outcome, the applicant should also have
                                                 (2) occupies the minimum area reasonably required for
regard to requirements for private marine             its designed purpose
development in the prescribed tidal works
code in the Coastal Protection and               (3) is not to be roofed or otherwise covered
Management Regulation 2003.                      (4) does not require the construction of coastal protection
                                                      works, riverbank hardening or dredging for marine
Editor’s note; Applications should be                access
supported by a report certified by an RPEQ to
                                                 (5) does not adversely impact on public safety or public
demonstrate compliance with this performance
                                                     access and use of the foreshore.
outcome.

P02 Development does not result in the           No acceptable outcome prescribed.                                N/A            The work does not result in the disposal of material dredged
disposal of material dredged from an                                                                                             from an artificial waterway into coastal waters.
artificial waterway into coastal waters,
with the exception of:
(1) reclamation works, or
(2) coastal protection works, or
(3) the maintenance of an existing
     artificial waterway and the at-sea
                                                                                                                                                     .,
     disposal of material that has
     previously been approved for the
    waterway.
P03 Development includes and complies            A03.1 A dredge management plan for the development:              N/A            These works do not involve dredging.
with a dredge management plan that               (1) directs the operation of the development
demonstrates how environmental                   (2) identifies disposal methods and disposal sites for the
impacts will be managed and mitigated,               removed material for the construction and operational
and how the requirements of the National             phases of the development
Assessment Guidelines for Dredging,              (3) outlines  how any adverse effects from extraction
Australia Government Department of the               activities on sediment transport processes and/or
Environment, Water, Heritage and the                 adjacent coastal landforms will be mitigated or
Arts, 2009 will be met.                              otherwise remediated by suitably planned and



State development assessment provisions                                         Module 10   -
                                                                                             Coastal protection                       21 June 2013                                  Page 12 of 15
10.1 Tidal works, or development in a coastal management district state code




                                                                                                                                                                                                    I

Page 16

Performance outcomes                             Acceptable outcomes                                                     Response   Comment

                                                      implemented beach nourishment and rehabilitation
                                                      works.
                                                 Editor’s note: The development must comply with the National
                                                 assessment guidelines for dredging, Australian Government

                                                 Department of Environment, Water, Heritage and the Arts, 2009
                                                AND

                                                A03.2 For land based disposal of dredged material, any                   N/A        These works do not involve dredging.
                                                 area used for storing, dewatering, drying or rehandling
                                                dredge material as outlined in the dredge management
                                                plan is:
                                                (1) of sufficient size for the projected volume of dredged
                                                    material from relevant capital or maintenance
                                                    dredging
                                                (2) protected from future development that would
                                                    compromise the use of the area for its intended
                                                    purpose of spoil dewatering.
                                                AND

                                                A03.3 For at-sea disposal of suitable dredged material,                  N/A        These works do not involve dredging.
                                                the dredge management plan specifies that material is
                                                 placed at a dredged material disposal site only if it is
                                                 demonstrated that it is not feasible to:
                                                (1) dispose of the material above the high water mark, if
                                                      the material is from maintenance works for an
                                                      existing artificial waterway for which at-sea disposal
                                                    was previously approved, or

                                                (2) keep the dredged material within the active sediment
                                                    transport system for the locality, or
                                                (3) use the material for beach nourishment or another
                                                      beneficial purpose.

                                                AND

                                                A03.4 For at-sea disposal of dredged material where the                  N/A        These works do not involve dredging.
                                                 marine spoil disposal site is a retentive (i.e. non-
                                                dispersive) site, the disposal site identified in the dredge
                                                management plan has the capacity to hold and retain the
                                                material within its boundaries during construction and
                                                operation of the development.
                                                 Editor’s note: The use of dredged material for a beneficial
                                                 purpose uses of dredged material could include development of
                                                 port or other marine facilities, use for construction or industrial
                                                 purposes, or use to create or modify land or waters for an
                                                 approved environmental outcome (such as creation of a bird
                                                 roosting site). Further information about beneficial uses is



State development assessment provisions                                               Module 10   -
                                                                                                    Coastal protection                   21 June 2013                      Page13of15
10.1 Tidal works, or development in a coastal management district state code

Page 17

                                                                                                                                I                                                          I

Performance outcomes                           I Acceptable outcomes                                                 Response   I Comment
                                                contained in the National assessment guidelines for dredging,
                                                Australian Government Department of Environment, Water,
                                                Heritage and the Arts, 2009.


Within a Vlfild river area: riparian and wildlife corridor functions                                                                                                                   I
P04 The clearing of native marine plants        A04.1 Clearing of marine plants within a wild river area             N/A            This work is not in a wild river area.
within a wild river area is minimised.          can only occur to the extent of the works, plus the
                                                prescribed area around the development to allow for                                                       ,

                                                maintenance.


P05 Development within a wild river area         No acceptable outcome is prescribed.                                N/A            This work is not in a wild river area.
does not impact fish passage.

P06 There is no net loss in marine plants       A06.1 Any marine plant damaged during construction in a              N/A            This work is not in a wild river area.
beyond the extent of the works in a wild        wild river area is replaced at the completion of the
river area.                                     development with the same species of plant in the
                                                disturbed area outside the footprint of the development.


P07 Works within a wild river area does         A07.1 Works located in tidal waters within a wild river              N/A            This work is not in a wild river area.
not impact on fish habitat values.              area are   designed and constructed using materials, and
                                                 located to ensure that the activities do not impact on fish
                                                 habitat values and function.


Within a wild river area: hydrological processes                                                                                                                                       i
         .      .        "-




POS Development within a wild river area         No acceptable outcome is prescribed.                                N/A            This work is not in a wild river area.
does not impound natural drainage lines
or flow      paths, during both construction
and operation.

Within a Vlfild river area: geomorphic processes                                                                                                                                       I
P09 Excavation and filling for prescribed        No acceptable outcome is prescribed.                                N/A            This work is not in a wild river area.
tidal work within a wild river area is
carried out only to the extent necessary
for the development.

P010 Works in a tidal area within a wild        A010.1 Where it is necessary to remove a marine plant,               N/A            This work is not in a wild river area.
river area are designed and constructed         the root system must be left in the substrate to minimise
in a way to ensure they do not adversely        disturbance to bed and banks.
affect the stability of the bed and banks       AND
of any waterway.
                                                A010.2 When the works are completed, any tidal lands                 N/A            This work is not in a wild river area.
                                                 disturbed by activities beyond the footprint of the works
                                                 are restored to   pre-disturbance condition to promote




State development assessment provisions                                           Module 10   -
                                                                                                Coastal protection                       21 June 2013                        Page 14 of 15
10.1 Tidal works, or development in a coastal management district state code
.




    ’.

Page 18

,




    Within a wild river area: water quality

    P011 No pollutants are released from             No acceptable outcome is prescribed.                                  N/A        This work is not in a wild river area.
    the activity.



    Table 10.1.3: Reconfiguring a lot
    Performance outcomes                             Acceptable outcomes                                                   Response   Comment

    P01 Erosion prone areas in a coastal             A01.1 Where reconfiguring a lot is proposed within the                N/A        The application is not for reconfiguring a lot.
    management district are maintained as            coastal management district, the erosion prone area
    development free buffers, or where               within the lot, or land within 40 metres of the foreshore
    permanent buildings or structures exist,         (whichever is greater), is surrendered to the State for
    coastal erosion risks are avoided or             public use unless:
    mitigated.                                       (1) the development is in a port or is for coastal-
                                                         dependent development
                                                         or

                                                     (2) the surrender of the land will not enhance coastal
                                                         management outcomes, for example, because there
                                                         is already substantial development seaward of the lot.
                                                     Editor’s note: Land surrendered to the State for public use under
                                                     A01.1 is to be:


                                                    (1) placed in a State land reserve for beach protection and
                                                          coastal management purposes under the Land Act 1994,
                                                          with local government as trustee, or
                                                    (2) managed for beach protection and coastal management
                                                        purposes under another management regime to the
                                                        satisfaction of the chief executive administering the Coastal
                                                        Protection and Management Act 1995 and Land Act 1994, if
                                                        it is demonstrated that A01.2(1) cannot be reasonably
                                                          achieved.

    P02 Development maintains or                    A02.1 Reconfiguring a lot that abuts the foreshore or tidal            N/A        The application is not for reconfiguring a lot.
    enhances general public access to or            waters involves the creation of 10 or more lots orthe

    along the foreshore, unless this is              opening of a new road, unless it is for coastal-dependent
    contrary to the protection of coastal            development.
    resources or public safety.




    State development assessment provisions                                             Module 10   -
                                                                                                      Coastal protection                   21 June 2013                                 Page 15 of 15
    10.1 Tidal works, or development in a coastal management district state code

Used in these records

About this file

File size
13.9 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Development Application Part 2 of 2 - Plan and Site photos - OPW13_0614.pdf · 13.9 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.