Performance outcomes I Acceptable outcomes Response Comment :
alternative exists
(3) coastal protection work or work
necessary to protect coastal
resources or physical coastal
processes.
Table 10.1.2: Operational work
Performance outcomes I Acceptable outcomes Response Comment
P01 Tidal works that is private marine A01.1 The location and design of tidal works that is N/A The work is not private marine development.
development does not result in adverse private marine development:
impacts to tidal land. (1) is on private land abutting state tidal land and used
Editor’s note: In addressing this performance for property access purposes
outcome, the applicant should also have
(2) occupies the minimum area reasonably required for
regard to requirements for private marine its designed purpose
development in the prescribed tidal works
code in the Coastal Protection and (3) is not to be roofed or otherwise covered
Management Regulation 2003. (4) does not require the construction of coastal protection
works, riverbank hardening or dredging for marine
Editor’s note; Applications should be access
supported by a report certified by an RPEQ to
(5) does not adversely impact on public safety or public
demonstrate compliance with this performance
access and use of the foreshore.
outcome.
P02 Development does not result in the No acceptable outcome prescribed. N/A The work does not result in the disposal of material dredged
disposal of material dredged from an from an artificial waterway into coastal waters.
artificial waterway into coastal waters,
with the exception of:
(1) reclamation works, or
(2) coastal protection works, or
(3) the maintenance of an existing
artificial waterway and the at-sea
.,
disposal of material that has
previously been approved for the
waterway.
P03 Development includes and complies A03.1 A dredge management plan for the development: N/A These works do not involve dredging.
with a dredge management plan that (1) directs the operation of the development
demonstrates how environmental (2) identifies disposal methods and disposal sites for the
impacts will be managed and mitigated, removed material for the construction and operational
and how the requirements of the National phases of the development
Assessment Guidelines for Dredging, (3) outlines how any adverse effects from extraction
Australia Government Department of the activities on sediment transport processes and/or
Environment, Water, Heritage and the adjacent coastal landforms will be mitigated or
Arts, 2009 will be met. otherwise remediated by suitably planned and
State development assessment provisions Module 10 -
Coastal protection 21 June 2013 Page 12 of 15
10.1 Tidal works, or development in a coastal management district state code
I
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application Part 2 of 2 - Plan and Site photos - OPW13/0614Related documentApplication case desk ↗
About this file
- File size
- 13.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.