                                                                                                                                I                                                          I

Performance outcomes                           I Acceptable outcomes                                                 Response   I Comment
                                                contained in the National assessment guidelines for dredging,
                                                Australian Government Department of Environment, Water,
                                                Heritage and the Arts, 2009.


Within a Vlfild river area: riparian and wildlife corridor functions                                                                                                                   I
P04 The clearing of native marine plants        A04.1 Clearing of marine plants within a wild river area             N/A            This work is not in a wild river area.
within a wild river area is minimised.          can only occur to the extent of the works, plus the
                                                prescribed area around the development to allow for                                                       ,

                                                maintenance.


P05 Development within a wild river area         No acceptable outcome is prescribed.                                N/A            This work is not in a wild river area.
does not impact fish passage.

P06 There is no net loss in marine plants       A06.1 Any marine plant damaged during construction in a              N/A            This work is not in a wild river area.
beyond the extent of the works in a wild        wild river area is replaced at the completion of the
river area.                                     development with the same species of plant in the
                                                disturbed area outside the footprint of the development.


P07 Works within a wild river area does         A07.1 Works located in tidal waters within a wild river              N/A            This work is not in a wild river area.
not impact on fish habitat values.              area are   designed and constructed using materials, and
                                                 located to ensure that the activities do not impact on fish
                                                 habitat values and function.


Within a wild river area: hydrological processes                                                                                                                                       i
         .      .        "-




POS Development within a wild river area         No acceptable outcome is prescribed.                                N/A            This work is not in a wild river area.
does not impound natural drainage lines
or flow      paths, during both construction
and operation.

Within a Vlfild river area: geomorphic processes                                                                                                                                       I
P09 Excavation and filling for prescribed        No acceptable outcome is prescribed.                                N/A            This work is not in a wild river area.
tidal work within a wild river area is
carried out only to the extent necessary
for the development.

P010 Works in a tidal area within a wild        A010.1 Where it is necessary to remove a marine plant,               N/A            This work is not in a wild river area.
river area are designed and constructed         the root system must be left in the substrate to minimise
in a way to ensure they do not adversely        disturbance to bed and banks.
affect the stability of the bed and banks       AND
of any waterway.
                                                A010.2 When the works are completed, any tidal lands                 N/A            This work is not in a wild river area.
                                                 disturbed by activities beyond the footprint of the works
                                                 are restored to   pre-disturbance condition to promote




State development assessment provisions                                           Module 10   -
                                                                                                Coastal protection                       21 June 2013                        Page 14 of 15
10.1 Tidal works, or development in a coastal management district state code
.




    ’.

Used in these records

About this file

File size
13.9 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Development Application Part 2 of 2 - Plan and Site photos - OPW13_0614.pdf · 13.9 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.