Development Application Part 2 of 2 - Plan and Site photos - OPW13/0614
Plans and drawings: the text below has words only, no drawings.
Very large file (13.9 MB): may take a few minutes to open.
I I
Performance outcomes I Acceptable outcomes Response I Comment
contained in the National assessment guidelines for dredging,
Australian Government Department of Environment, Water,
Heritage and the Arts, 2009.
Within a Vlfild river area: riparian and wildlife corridor functions I
P04 The clearing of native marine plants A04.1 Clearing of marine plants within a wild river area N/A This work is not in a wild river area.
within a wild river area is minimised. can only occur to the extent of the works, plus the
prescribed area around the development to allow for ,
maintenance.
P05 Development within a wild river area No acceptable outcome is prescribed. N/A This work is not in a wild river area.
does not impact fish passage.
P06 There is no net loss in marine plants A06.1 Any marine plant damaged during construction in a N/A This work is not in a wild river area.
beyond the extent of the works in a wild wild river area is replaced at the completion of the
river area. development with the same species of plant in the
disturbed area outside the footprint of the development.
P07 Works within a wild river area does A07.1 Works located in tidal waters within a wild river N/A This work is not in a wild river area.
not impact on fish habitat values. area are designed and constructed using materials, and
located to ensure that the activities do not impact on fish
habitat values and function.
Within a wild river area: hydrological processes i
. . "-
POS Development within a wild river area No acceptable outcome is prescribed. N/A This work is not in a wild river area.
does not impound natural drainage lines
or flow paths, during both construction
and operation.
Within a Vlfild river area: geomorphic processes I
P09 Excavation and filling for prescribed No acceptable outcome is prescribed. N/A This work is not in a wild river area.
tidal work within a wild river area is
carried out only to the extent necessary
for the development.
P010 Works in a tidal area within a wild A010.1 Where it is necessary to remove a marine plant, N/A This work is not in a wild river area.
river area are designed and constructed the root system must be left in the substrate to minimise
in a way to ensure they do not adversely disturbance to bed and banks.
affect the stability of the bed and banks AND
of any waterway.
A010.2 When the works are completed, any tidal lands N/A This work is not in a wild river area.
disturbed by activities beyond the footprint of the works
are restored to pre-disturbance condition to promote
State development assessment provisions Module 10 -
Coastal protection 21 June 2013 Page 14 of 15
10.1 Tidal works, or development in a coastal management district state code
.
’.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application Part 2 of 2 - Plan and Site photos - OPW13/0614Related documentApplication case desk ↗
About this file
- File size
- 13.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.