Council archive · source document
17 Bottlebrush Avenue, · MCU26/0001
Very large file (15.7 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Figure 2-4: DRAINS model for existing catchment This assumption is considered appropriate as the existing site is currently developed with a single dwelling and associated impervious area consistent with low density residential conditions. The relevant DRAINS catchment inputs are detailed in Figure 2-5. Figure 2-5: DRAINS catchment inputs The pre-development flow rates for various AEP were calculated using DRAINS. The results are summarized in Table 2-3. Table 2-3: DRAINS results for existing catchment AEP % 63.2% 50% 20% 10% 5% 2% 1% Pre-Development Flow (m³/s) 0.011 0.013 0.020 0.024 0.028 0.034 0.038 A comparative assessment was conducted to evaluate the variance between DRAINS results and the Rational Method calculations. The differences between the two methodologies are presented in Table 2-4. 17 BOTTLEBRUSH AVENUE, NOOSA HEADS 7 January 2026 P a g e |9 Stormwater Management Plan Client Reference: P0433-25-001 Prepared for Made Capital PTY LTD
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
P0433-25-001_17_Bottlebrush_Avenue_SWMP.pdfRelated documentApplication case desk ↗
About this file
- File size
- 15.7 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.