Key Observations

     1.   Increase in Flow Depths and Velocities

               •    The developed scenario shows higher water levels across all storm events, particularly at
                    constricted sections of the drainage network.

               •    Flow velocities have increased, indicating a higher runoff volume due to reduced permeability.

     2.   Peak Discharge Variations

               •    Peak discharge rates in the developed scenario have increased substantially, particularly for
                    higher return period storms (e.g., 1% AEP).

               •    The most significant changes occur at sections with concentrated overland flow paths,
                    suggesting increased runoff from new impervious surfaces.

     3.   Impact of Increased Impervious Area

               •    The development introduces more impervious surfaces (e.g., roads, driveways, rooftops),
                    reducing infiltration and increasing direct runoff.

               •    The loss of natural detention and permeability results in quicker times of concentration and higher
                    peak flows.



Table 3-1: Comparison of Pre-Development vs. Unmitigated Post-Development Peak Flows

 Storm Event (AEP)           Pre-Development Peak Flow                Post-Development Peak         Increase %
                                       (m³/s)                               Flow (m³/s)

          63.2%                            0.011                                  0.013                 8%

          50%                              0.013                                  0.015                 7%

          20%                             0.020                                  0.022                  5%

          10%                             0.024                                  0.027                  6%

           5%                             0.028                                   0.031                 5%

           2%                             0.034                                  0.037                  4%

           1%                             0.038                                  0.042                  5%




 17 BOTTLEBRUSH AVENUE, NOOSA HEADS
                                              7 January 2026                                           P a g e | 13
 Stormwater Management Plan
 Client Reference: P0433-25-001
 Prepared for Made Capital PTY LTD

Used in these records

About this file

File size
15.7 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

P0433-25-001_17_Bottlebrush_Avenue_SWMP.pdf · 15.7 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.