Stormwater Mitigation Results

A detailed analysis of the mitigated peak flows, as summarised in Table 3-3, confirms that the use of the proposed
detention tank successfully reduces post-development discharges across all assessed storm events, ensuring
compliance with QUDM requirements and mitigating potential downstream impacts.



Table 3-3: Mitigated Flow comparison to existing

 Storm Event                     Pre-Development Peak Flow          Post-Mitigation Peak Flow      Reduction %
                                           (m³/s)                             (m³/s)

 63% (1-Year AEP)                                  0.011                      0.011                     0%

 50% (2-Year AEP)                                  0.013                     0.013                      0%

 20% (5-Year AEP)                                  0.020                      0.017                    -8%

 10% (10-Year AEP)                                 0.024                     0.019                     -12%

 5% (20-Year AEP)                                  0.028                     0.022                     -12%

 2% (50-Year AEP)                                  0.034                     0.024                     -17%

 1% (100-Year AEP)                                 0.038                     0.026                     -19%



Key Observations

The results of the hydrological modelling demonstrate that the proposed detention tank provides effective
attenuation of post-development peak flows, particularly for the more frequent rainfall events.

As summarised in Table 3-3, the following peak flow reductions were achieved:

     •    1 – Year AEP approximately 0% reduction

     •    2 - Year AEP – approximately 0% reduction

     •    5 - Year AEP – approximately 8% reduction

     •    10 - Year AEP – approximately 12% reduction

     •    20 - Year AEP – approximately 12% reduction

     •    50 - Year AEP – approximately 17% reduction.

     •    100 - Year AEP – approximately 19% reduction.

These results indicate that the tank has been optimised to effectively manage frequent, smaller storm events,
which are most critical for protecting downstream properties and infrastructure, while allowing major flood events
to pass through the system without increased risk.

This outcome reflects the intent of the stormwater management strategy:

     •    To provide a reduction in nuisance flooding and frequent storm impacts

     •    To ensure safe conveyance of major flows consistent with pre-development drainage conditions and

     •    To maintain compliance with both QUDM and Noosa Shire Council stormwater management objectives.




 17 BOTTLEBRUSH AVENUE, NOOSA HEADS
                                                   7 January 2026                                 P a g e | 15
 Stormwater Management Plan
 Client Reference: P0433-25-001
 Prepared for Made Capital PTY LTD

Used in these records

About this file

File size
15.7 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

P0433-25-001_17_Bottlebrush_Avenue_SWMP.pdf · 15.7 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.