Stormwater Mitigation Results
A detailed analysis of the mitigated peak flows, as summarised in Table 3-3, confirms that the use of the proposed
detention tank successfully reduces post-development discharges across all assessed storm events, ensuring
compliance with QUDM requirements and mitigating potential downstream impacts.
Table 3-3: Mitigated Flow comparison to existing
Storm Event Pre-Development Peak Flow Post-Mitigation Peak Flow Reduction %
(m³/s) (m³/s)
63% (1-Year AEP) 0.011 0.011 0%
50% (2-Year AEP) 0.013 0.013 0%
20% (5-Year AEP) 0.020 0.017 -8%
10% (10-Year AEP) 0.024 0.019 -12%
5% (20-Year AEP) 0.028 0.022 -12%
2% (50-Year AEP) 0.034 0.024 -17%
1% (100-Year AEP) 0.038 0.026 -19%
Key Observations
The results of the hydrological modelling demonstrate that the proposed detention tank provides effective
attenuation of post-development peak flows, particularly for the more frequent rainfall events.
As summarised in Table 3-3, the following peak flow reductions were achieved:
• 1 – Year AEP approximately 0% reduction
• 2 - Year AEP – approximately 0% reduction
• 5 - Year AEP – approximately 8% reduction
• 10 - Year AEP – approximately 12% reduction
• 20 - Year AEP – approximately 12% reduction
• 50 - Year AEP – approximately 17% reduction.
• 100 - Year AEP – approximately 19% reduction.
These results indicate that the tank has been optimised to effectively manage frequent, smaller storm events,
which are most critical for protecting downstream properties and infrastructure, while allowing major flood events
to pass through the system without increased risk.
This outcome reflects the intent of the stormwater management strategy:
• To provide a reduction in nuisance flooding and frequent storm impacts
• To ensure safe conveyance of major flows consistent with pre-development drainage conditions and
• To maintain compliance with both QUDM and Noosa Shire Council stormwater management objectives.
17 BOTTLEBRUSH AVENUE, NOOSA HEADS
7 January 2026 P a g e | 15
Stormwater Management Plan
Client Reference: P0433-25-001
Prepared for Made Capital PTY LTD
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
P0433-25-001_17_Bottlebrush_Avenue_SWMP.pdfRelated documentApplication case desk ↗
About this file
- File size
- 15.7 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.