Council archive · source document
17 Bottlebrush Avenue, · MCU26/0001
Very large file (15.7 MB): the original may take a few minutes to open or download. The page text below is quick to read.
5 Conclusion The Stormwater Management Plan for the proposed multi residential dwelling at 17 Bottlebrush Avenue, Noosa Heads has been prepared to demonstrate compliance with the stormwater management requirements of Noosa Shire Council, QUDM and relevant State Planning Policy provisions. The assessment incorporates detailed hydrological modelling, comparison against existing conditions, and the development of an effective stormwater management strategy that mitigates potential impacts arising from the proposed works. Hydrological and Hydraulic Considerations Assessment of the existing site confirmed that stormwater runoff naturally flows towards the southwest following the existing topography, discharging into downstream Bottlebrush Avenue. Pre-development peak flows were calculated using both the Rational Method and DRAINS modelling, providing a reliable baseline for comparison with post-development scenarios. The comparative assessment demonstrated that while the Rational Method provides reasonable estimates, the DRAINS model more accurately captures hydrologic and hydraulic behaviour, including rainfall losses, temporal storm patterns, storage and flow routing. This model was therefore used for the final design. Stormwater Quantity Management Post-development conditions introduce increased impervious areas, resulting in higher runoff volumes and elevated peak flow rates. To ensure no worsening of drainage conditions downstream, a detention tank has been incorporated into the proposed stormwater management strategy. Modelling of the proposed detention tank demonstrates that post-development peak flows are attenuated to at or below pre-development levels for all assessed storm events, up to and including the 1% AEP event. This satisfies the intent of QUDM and Council stormwater objectives for lawful, non-worsening discharge. The detention tank has been designed to provide adequate flood storage and controlled discharge via an orifice and overflow system. Key design parameters include: • Storage volume: 8.0 m³ • 1% AEP event Storage volume: 7.6 m³ • Maximum water depth: 0.95 m • Lower outlet: 75 mm orifice • Secondary outlet: 90 mm orifice • Outlet pipe: 375 mm diameter discharging to Council’s lawful point of discharge in the stormwater network located in Bottlebrush Avenue These design elements ensure safe and effective management of stormwater flows generated by the development. Stormwater Quality Management Although the development does not trigger the State Planning Policy (SPP) thresholds requiring formal post- construction stormwater quality treatment, best-practice measures have been incorporated to support good water quality outcomes. These include: • Providing an effective stormwater drainage layout that conveys and attenuates runoff before discharge 17 BOTTLEBRUSH AVENUE, NOOSA HEADS 7 January 2026 P a g e | 17 Stormwater Management Plan Client Reference: P0433-25-001 Prepared for Made Capital PTY LTD
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
P0433-25-001_17_Bottlebrush_Avenue_SWMP.pdfRelated documentApplication case desk ↗
About this file
- File size
- 15.7 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.