Skip to the record
The definitive source for everything Noosa Council.

Council archive · source document

17 Bottlebrush Avenue, · MCU26/0001

of 28

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (15.7 MB): the original may take a few minutes to open or download. The page text below is quick to read.

List of Tables and Figures



List of Tables
Table 1-1 Property Details ................................................................................................................................................ 4

Table 2-1: Rational Method key inputs ............................................................................................................................ 8

Table 2-2: Rational Method flow calculations ................................................................................................................. 8

Table 2-3: DRAINS results for existing catchment ......................................................................................................... 9

Table 2-4: Comparison between DRAINS and the Rational Method ........................................................................... 10

Table 3-1: Comparison of Pre-Development vs. Unmitigated Post-Development Peak Flows ................................ 13

Table 3-2: Detention tank parameters .......................................................................................................................... 14

Table 3-3: Mitigated Flow comparison to existing ....................................................................................................... 15




List of Figures
Figure 2-1: Subject Site Location (QLD Globe, 2025)..................................................................................................... 6

Figure 2-2 Max overland flow path .................................................................................................................................. 7

Figure 2-3: Overland sheet flow times (QUDM, 2025) ................................................................................................... 7

Figure 2-4: DRAINS model for existing catchment ......................................................................................................... 9

Figure 2-5: DRAINS catchment inputs ............................................................................................................................. 9

Figure 3-1 Proposed Stormwater Layout ....................................................................................................................... 11




Appendices
Appendix A – DRAINS Results

Appendix B – Rational Method Results




  17 BOTTLEBRUSH AVENUE, NOOSA HEADS
                                                            7 January 2026
  Stormwater Management Plan
  Client Reference: P0433-25-001
  Prepared for Made Capital PTY LTD

Used in these records

About this file

File size
15.7 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

P0433-25-001_17_Bottlebrush_Avenue_SWMP.pdf · 15.7 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.