Council archive · source document
17 Bottlebrush Avenue, · MCU26/0001
Very large file (15.7 MB): the original may take a few minutes to open or download. The page text below is quick to read.
List of Tables and Figures List of Tables Table 1-1 Property Details ................................................................................................................................................ 4 Table 2-1: Rational Method key inputs ............................................................................................................................ 8 Table 2-2: Rational Method flow calculations ................................................................................................................. 8 Table 2-3: DRAINS results for existing catchment ......................................................................................................... 9 Table 2-4: Comparison between DRAINS and the Rational Method ........................................................................... 10 Table 3-1: Comparison of Pre-Development vs. Unmitigated Post-Development Peak Flows ................................ 13 Table 3-2: Detention tank parameters .......................................................................................................................... 14 Table 3-3: Mitigated Flow comparison to existing ....................................................................................................... 15 List of Figures Figure 2-1: Subject Site Location (QLD Globe, 2025)..................................................................................................... 6 Figure 2-2 Max overland flow path .................................................................................................................................. 7 Figure 2-3: Overland sheet flow times (QUDM, 2025) ................................................................................................... 7 Figure 2-4: DRAINS model for existing catchment ......................................................................................................... 9 Figure 2-5: DRAINS catchment inputs ............................................................................................................................. 9 Figure 3-1 Proposed Stormwater Layout ....................................................................................................................... 11 Appendices Appendix A – DRAINS Results Appendix B – Rational Method Results 17 BOTTLEBRUSH AVENUE, NOOSA HEADS 7 January 2026 Stormwater Management Plan Client Reference: P0433-25-001 Prepared for Made Capital PTY LTD
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
P0433-25-001_17_Bottlebrush_Avenue_SWMP.pdfRelated documentApplication case desk ↗
About this file
- File size
- 15.7 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.