Appendix A - Design DA Drawings

Attached to the e-mail MCU15/0095 & REC15/0022 IDAS Forms, Report & Plans (1 of 3).

of 16

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Original PDF page 8, section 1. The text section number identifies this passage in the reader.

22/09/2015 8:03:29 AM




                                                                                                                                SEDIMENT AND EROSION CONTROL NOTES:                                                STOCKPILES                                                                                                                                                              N




                                                                                                      WALT
                                                                                                                                GENERAL                                                                         1. STOCKPILES ARE NOT TO BE STORED ON THE FOOTPATH OR THE ROAD RESERVE, UNLESS APPROVED
                                                                                                                                                                                                                   BY COUNCIL.
                                                                                                                                                                                                                2. WHERE NECESSARY STOCKPILE LOSSES CAN BE MINIMISED WITH THE USE OF COVERS.




                                                                                                          ER HA
                                                                                                                             1. ALL SEDIMENT & EROSION CONTROL MEASURES TO BE IN
                                                                                                                                ACCORDANCE WITH LOCAL COUNCIL'S GUIDE LINES.                                    3. ALL STOCKPILES AND BUILDING MATERIAL SHALL BE LOCATED WITHIN THE SEDIMENT CONTROL ZONE.
                                                                                                                                                                                                                   TO MINIMISE EROSION AND THE LOSS OF SAND AND SOIL, STOCKPILES SHALL NOT BE LOCATED WITHIN
                                                                                                                                                                                                                4. AN OVERLAND FLOW PATH. IF IT IS IMPRACTICAL TO AVOID STORMWATER RUNOFF BEING DIRECTED TO
                                                                                                                               PRIOR TO THE COMMENCEMENT OF CONSTRUCTION




                                                                                                               Y
                                                                                                                                                                                                                   A STOCKPILE, THEN A PERIMETER BANK SHALL BE CONSTRUCTED UP SLOPE OF THE STOCKPILE TO




                                                                                                            DRIVE
                                                                                                                             1. AVOID STRIPPING & EXCAVATING UNTIL READY TO BUILD.                                 DIRECT RUNOFF IN A CONTROLLED MANNER AROUND THE STOCKPILE.                                                                        RPD
                                                  SITE ENTRY
                                                  REFER FIGURE 2                                                             2. INSTALL SEDIMENT FENCES.                                                                                                                                                                                             LOT 30 on SP 170751

                                                  SITE EXIT                                                                    BULK EARTHWORKS                                                                     SEDIMENT BARRIERS                                                                                                                 TOTAL SITE AREA: 5018m²
                                                  REFER FIGURE 2                                                             1. AVOID STRIPPING & EXCAVATING UNTIL READY TO BUILD.                              1. SEDIMENT FENCE
                                                                                                                             2. CONSTRUCTION OF AN ENTRY/EXIT POINT TO THE SITE SHALL BE MANAGED SO THAT           INSTALL SEDIMENT FENCE(S) ALONG THE LOW SIDE OF THE SITE, AND IDEALLY ALONG A LINE OF
                                                                                                                                SEDIMENT IS NOT TRACKED OFF THE SITE.                                              CONSTANT LAND LEVEL TO PREVENT THE CONCENTRATION OF STORMWATER RUNOFF.
                                                                                                                             3. TOPSOIL SHALL BE STOCKPILED ON SITE FOR LATER USE.                                 IN AREAS WHERE IT IS EITHER UNDESIRABLE OR IMPRACTICAL TO BURY THE LOWER EDGE OF THE
                                                                                                                             4. WHERE PRACTICABLE MAINTAIN KERB VEGETATION IN A HEALTHY STATE DURING THE           SEDIMENT FENCE, THE LOWER 200mm (MIN) PORTION OF THE FABRIC SHALL BE PLACED ON THE
                                                                                                                                CONSTRUCTION PROCESS.                                                              GROUND UP SLOPE OF THE FENCE AND BURIED UNDER A 100mm (MIN) LAYER OF AGGREGATE.
                                                                                                                             5. WHEN UP SLOPE WATER IS DIVERTED AROUND A WORK SITE IT SHALL BE DISCHARGED          SEDIMENT FENCES ON BUILDING SITES CAN BE STAPLED TO APPROXIMATELY 40mm SQUARE
                                                                                                                                AS SHEET FLOW THROUGH AN UNDISTURBED AREA BESIDE THE WORKS.                        HARDWOOD POSTS OR WIRE TIED TO STEEL POSTS.

                                                                                                                                SERVICES TRENCHES                                                               2. FIELD INLET GULLIES
                               EUMUNDI NOOSA ROAD                                                                                                                                                                  SEDIMENT CONTROLS FOR STORMWATER INLETS LOCATED WITHIN THE PROPERTY BOUNDARIES MAY
                                                                                                                             1. TO AVOID UNNECESSARY SOIL EROSION, SERVICE TRENCHES SHALL BE BACK                  CONSIST OF GEOTEXTILE FABRIC PLACED EITHER DIRECTLY OVER THE GRATED INLET OR AROUND
                                                                                                                                FILLED, CAPPED AND COMPACTED TO A LEVEL AT LEAST 75-100mm ABOVE THE                THE INLET SUPPORT BY A TIMBER FRAME. FIELD INLET PROTECTION IS NECESSARY WHERE INLETS
                                                                                                                                ADJOINING GROUND LEVEL.                                                            DRAIN AREAS OF BARE AND UNPROTECTED SOIL. DURING STORMS, PONDING SHALL BE ALLOWED TO
                                                                                                                                                                                                                   OCCUR AROUND THE STORMWATER INLET TO ASSIST IN THE SETTLING OUT OF SEDIMENTS.
                                                                                                                               BUILDING OPERATIONS
                                            SITE PLAN                                                                        1. ERODABLE MATERIAL MISTAKENLY PLACED WITHIN THE ROAD RESERVE (INCLUDING
                                                                                                                                ACCIDENTAL SPILLAGE AND TRACKING OF SUCH MATERIALS ONTO THE ROAD) THAT
                                                                                                                                                                                                                3. PAVEMENT INLET GULLY
                                                                                                                                                                                                                   A ROADSIDE INLET BARRIER IS TO BE INSTALLED, SO THAT IT SHALL NOT BE ALLOWED TO FULLY BLOCK
                                            NTS                                                                                                                                                                    THE INLET STRUCTURE.
                                                                                                                                CANNOT BE PREVENTED THROUGH REASONABLE MEANS, MUST BE:                             ON A HILLSIDE, SEDIMENT BARRIERS MAY CONSIST OF A TEMPORARY DAM CONSTRUCTED FROM SAND
                                                                                                                                (a) REMOVED IMMEDIATELY IF RAINFALL IS IMMINENT OR OCCURRING.                      AND GRAVEL BAGS AT LEAST 4 METRES UP SLOPE FROM THE GULLY INLET.
                                                                                                                                (b) REMOVED PRIOR TO THE END OF THE DAY'S WORK IF RAINFALL IS NOT EXPECTED.
                                                                                                                             2. MATERIALS SHALL BE SWEPT FROM THE ROAD, NOT WASHED DOWN THE GUTTER.
                                                                                                                             3. ALL SOLID WASTE SHALL BE STORED ON SITE IN SUCH A MANNER THAT IT IS
                                                                                                                                PREVENTED FROM LEAVING THE SITE EITHER BY THE ACTION OF WIND OR WATER.             MAINTENANCE
                                                                                                                             4. SMALLER MATERIALS, SUCH AS LITTER, SHALL BE CONTAINED IN COVERED BINS OR
                                   NOTES:                                                                                                                                             1. SEDIMENT FENCES SHALL BE REPLACED IF THE FABRIC IS RIPPED OR OTHERWISE DAMAGED. THE
                                                                                                                                LITTER TRAPS FORMED ON THREE SIDES BY A GEOTEXTILE WIND BREAK.
                                1. BUNDING TO BE POSITIONED AS REQUIRED TO SUIT WORKING & COUNCIL                                                                                        MAINTENANCE OF THE SEDIMENT FENCES INCLUDES THE REMOVAL OF SEDIMENT DEPOSITED UP
                                                                                                                             5. CONCRETE WASTE WASHED FROM TRUCKS AND MIXERS UNITS SHALL BE
                                   REQUIREMENTS SO AS NOT TO CAUSE NUISANCE & POLLUTION TO COUNCIL                                                                                       SLOPE OF THE FENCE AND RETRENCHING THE FABRIC WHEN THE FENCE IS 25% FULL.
                                                                                                                                CONTAINED ON SITE AND SHALL NOT BE PLACED IN A POSITION WHERE IT COULD
                                   FOOTWAYS & ASSOCIATED AREAS.                                                                                                                       2. FOLLOWING STORM EVENTS, THE ROAD RESERVE AND ALL SEDIMENT BARRIERS SHALL BE
                                                                                                                                REASONABLY BE EXPECTED TO WASH FROM THE SITE AND HARM THE
                                2. SECURE & CLEAN ALL WORK AREAS AT COMPLETION OF EACH DAY.                                     ENVIRONMENT.                                             INSPECTED AND ANY EXCESSIVE SEDIMENT RESIDUE SHALL BE APPROPRIATELY REMOVED.
                                3. SITE ACCESS POINTS ARE TO BE CONTROLLED BY THE BUILDER WHO IS TO ENSURE
                                   TEMPORARY REMOVAL & REPLACEMENT OF SILTATION CONTROL METHODS AREA
                                   SUFFICIENT TO ENSURE COMPLIANCE WITH THESE CONTROLS.                       SITE REHABILITATION
                                4. SILT FENCE SHALL NOT BE REMOVED UNTIL SITE HAS BEEN PAVED & SURFACED.
                                   BUNDWALLS SHALL BE LOCATED AROUND ALL PITS & MAINTAINED UNTIL THE       1. ALL GROUND DISTURBED BY THE CONSTRUCTION ACTIVITY SHALL BE PROMPTLY
                                   CATCHMENT AREA HAS BEEN PAVED.                                             AND PROGRESSIVELY STABILISED SO IT CAN NO LONGER ACT AS A SOURCE OF
                                5. KERB DRAIN EXCLUDER SHALL INCORPORATE TRAFFIC CONTROL BARRICADES IN        SEDIMENT.
                                   ACCORDANCE WITH AS1742.3 - 1985, & SHALL NOT BE PLACED UNTIL WORKS ARE
                                6. BEING CARRIED OUT ON THE FOOTPATH AREA, OR AS OTHERWISE DIRECTED BY
                                   COUNCIL.
                                7. ALL SEDIMENT TRAPS, EXCLUDERS, BUNDWALLS SHALL BE INSPECTED & CLEANED            LEGEND                                                                                                                                                A 16.09.15 BHL D.A. APPROVAL
                                                                                                                                                                                                                                                                        revision date         by                               description                    checked
                                   AFTER EACH STORM EVENT. DAMAGED OR CLOGGED BUNDING ARE TO BE REMOVED                           AREA DEFINING EXTENT OF WORKS TO HAVE                                                                                                               Figured dimensions to be taken in preference to scale readings
                                   AND REPLACED.                                                                                  SEDIMENT AND EROSION CONTROLS INSTALLED
                                8. THE BUILDER SHALL CARRY OUT ANY ADDITIONAL WORKS DEEMED NECESSARY AND                                                                                                                                                                                                                               PROJECT MANAGERS
                                                                                                                                                                                                                                    BERM (0.3m MIN. HIGH)                                                                                          DESIGNERS ||
                                   DIRECTED BY COUNCIL TO BE CARRIED OUT.                                                                                                                                                                                                                                                                            PLANNERS |
                                9. THE SEDIMENT CONTROL PLAN SHALL BE IMPLEMENTED PRIOR TO ANY WORKS BEING                                                                                                      MIN LE                                    EXISTING                                                                                 ENGINEERS |
                                   CARRIED OUT ON SITE.                                                                                                                      CONSTRUCTION SITE                        NGTH
                                                                                                                                                                                                                           15m                                                                                                  Head office - 17 Dover Street
                                                                                                                                                                                                                                                                                          ROADWAY                                                                       Albion QLD 4010 Australia
                                                                                                                    DISTURBED AREA                           POSTS DRIVEN 0.6M
                                                                                                                                                                                                                                                                                                                                                                        Email: [email protected]
                                                                                                                                                                                                                                                                                                                                                                        Ph. 61 7 3854 2900
                                                                                                                                                                                                                                                                m
                                                                                                                                                             INTO GROUND                                                                                      H3                                                                                                        Fax. 61 7 3854 2999
                                                                                                       WIRE OR STEEL MESH                     X.                                                                                                          WIDT                                                       Copyright Tam Faragher & Associates Pty Ltd. This drawing including design & information
                                                                                                                                            MA                                                                                       0.2m             MIN
                                                                                                                                                                                                                                                                                                            C is covered by Copyright and all rights are reserved by Tam Faragher & Associates.
                                                                                                      DIR                                3m                                                                                                                                                                          This document may not be copied, reproduced, retained or disclosed to any unauthorised
                                                                                                      OF ECTIO                                               GEOTEXTILE FILTER FABRIC                                                                                                                                person, either wholly or in part, without prior consent in writing from Tam Faragher &
                                                               KERB DRAIN                               FLO N                                                                                                                                                                                                        Associates.
                                                                                                           W                                                                                                                                                                                                                                                                                ACN 054 486 743
                                                                                                                                                                                                                                                                                                           project
                                                                                                                                                                                                  GEOTEXTILE FABRIC
                                                                                                                      m
                                                                                                                   0.6 X                       DETAIL OF OVERLAP                                                                                                                                           PROPOSED SERVICE STATION for SYNERGY
                        WRAP FILTER CLOTH                                                                            MA
                        OVER GRATE.
                                                                                                                                                                                                                                                                                                           PROPERTY PARTNERS. 123 EUMUNDI ROAD (Cnr
                                                                                                                         m                                                                                              50 - 75mm GRAVEL OR
                                                                                                                      0.2                                    UNDISTURBED                                                RECYCLED CONCRETE                                                                  WALTER HAY DRIVE) NOOSAVILLE, QLD
                                                                                                                                                             AREA                               RUNOFF FROM PAD                                                                                            title
                                                                    100Ø AG. PIPE WRAPPED IN FILTER                                                                                             DIRECTED TO                                                                                                EROSION & SEDIMENT CONTROL PLAN
                            KERB INLET                              CLOTH PLACED TO COVER THE
                                                                    EXTENTS OF LINTEL OR BACKSTONE
                                                                                                                        FIG. 1. - SEDIMENT FENCE                                                SEDIMENT
                                                                                                                                                                                                TRAP.
                                                                                                                                                                                                                  FIG. 2. - CONSTRUCTION EXIT/ENTRY
                                                                    & FILLED WITH 20mm GRAVEL.                                                                                                                    MAINTENANCE:
                            PROTECTION                                                                                                                                                                            THE ENTRANCE SHALL BE MAINTAINED SO THAT IT PREVENTS TYRES FROM TRACKING.
                                                                                                                                                                                                                                                                                                           drawn
                                                                                                                                                                                                                                                                                                                      BHL
                                                                                                                                                                                                                                                                                                                                     approved
                                                                                                                                                                                                                                                                                                                                       ROB
                                                                                                                                                                                                                                                                                                                                                            date created
                                                                                                                                                                                                                                                                                                                                                            SEP 2015
                                                                                                                                                                                                                                                                                                                                                                                   scale
                                                                                                                                                                                                                                                                                                                                                                                     As indicated
                                                                                                                                                                                                                  DRESSING WITH ADDITIONAL AGGREGATE IF REQUIRED.                                          status                                                 drawing no.                                   rev.

                                                                                                                                                                                                                  REGULARLY REMOVE SEDIMENT FROM ROADWAY.                                                           D.A. ISSUE                                    15193                           D07 A
Log in to download the original file

Appendix A - Design DA Drawings.pdf · 4.0 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.