Council archive · source document
Cover letter and IDAS Forms [As Published] · 132007.2398
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.0, 3 September 2007
IPA, schedule 8 part 1, table 4. stem 3(c)(y)
IP Regulation schedule 2, table 2 stem 8
IP Regulation. schedule 1, part 3 table 4. tem 3
Water Act 2000, section 966A (wht nver area)
Wild Rivers Act 2005. section 43A
47 Is any of the proposed operational work to allow, under the Water Act 2000, for taking or interfering with subartesian water?
{K) No
CI Yes
IPA, schedule 8, part 1, table 4, tem 3{c}(ii)
IP Requiatron, schedule 2. table 2. tem 8
IP Regulation schedule 1, part 3, table 4. item 3
Water Act 2000, section 966A {wild river area)(Note. no current Wild River declaration identifies taking or interfering with subartesian water as assessable)
Wild River code (Note: ihe code does not currently contain applicable provisions for sub artesian water)
48 1s any of the proposed operational work to allow, under the Water Act 2000, for interfering with overland flow water?
No
(11 Yes - Answer both (a) and {b) below
IPA, scheditle 8, part 1, table 4, items 3(c)() and 3(d)
IP Regulation, schedule 2, table 2, item 9
IP Regutation, schedule 1. part 3, table 4, item 3A
Water Act 2000, section 9668 {witd river area)
49 Is the proposed operational work for the following?
e For the construction of a referable dam as defined under the Water Act 2000 & No O Yes
¢ Toincrease the storage capacity of a referable dam by more than 10% & No OC Yes
if yes fo either or both - (Complete Part Ks) This application requires assessment by the Department of Natural Resources and Water (NRW).
if NRW is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
IPA, schedule 8, part 1, table 4, item 4
IP Regulation, schedule 2, {able 2, item 10
(TIDAL WORK; WILD RIVER AREA
4.10 |s any of the proposed operational work tidal work, other than excluded work defined under the IPA?
No
CD Yes - Answer (a) and (b) below
IPA, schedule 8, part 1, table 4, item 5
IP Regulation, schedule 2, table 2, items 12, 14 and 17
IP Regulation, schedule 1, part 3, fable 4, items 4A and 5
Coastal Protection and Management Act 1995, section 104A (wild river area)
(COASTAL MANAGEMENT DISTRICT; WILD RIVER AREA
4.11 Is any of the operational work proposed to be carried out within a coastal management district?
() No
CI Yes
IPA, schedute 8, part 1, table 4, item 5
IP Reguiation, schedule 2, table 2, items 12 and 14
IP Regulation, schedule 1, part 3, table 4, items 4A and 5
Coastal Protection and Management Act 1995 Act 1995, section 104A (wild river area)
Wild Rivers Act 2005, section 43A
WATERWAY BARRIER WORKS; WILD RIVER AREA
412 ls any of the proposed operational work for constructing or raising waterway barrier works under the Fisheries Act 1994?
() No
LI Yes
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Cover letter and IDAS Forms [As Published]Related documentApplication case desk ↗
About this file
- File size
- 956 KB (small file)
- File type
No other editions are linked here.