INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.0, 3 September 2007

IPA, schedule 8 part 1, table 4. stem 3(c)(y)

IP Regulation schedule 2, table 2 stem 8

IP Regulation. schedule 1, part 3 table 4. tem 3
Water Act 2000, section 966A (wht nver area)
Wild Rivers Act 2005. section 43A

47 Is any of the proposed operational work to allow, under the Water Act 2000, for taking or interfering with subartesian water?

{K) No
CI Yes

IPA, schedule 8, part 1, table 4, tem 3{c}(ii)

IP Requiatron, schedule 2. table 2. tem 8

IP Regulation schedule 1, part 3, table 4. item 3

Water Act 2000, section 966A {wild river area)(Note. no current Wild River declaration identifies taking or interfering with subartesian water as assessable)
Wild River code (Note: ihe code does not currently contain applicable provisions for sub artesian water)

48 1s any of the proposed operational work to allow, under the Water Act 2000, for interfering with overland flow water?

No

(11 Yes - Answer both (a) and {b) below

IPA, scheditle 8, part 1, table 4, items 3(c)() and 3(d)
IP Regulation, schedule 2, table 2, item 9
IP Regutation, schedule 1. part 3, table 4, item 3A
Water Act 2000, section 9668 {witd river area)
49 Is the proposed operational work for the following?
e For the construction of a referable dam as defined under the Water Act 2000 & No O Yes
¢ Toincrease the storage capacity of a referable dam by more than 10% & No OC Yes

if yes fo either or both - (Complete Part Ks) This application requires assessment by the Department of Natural Resources and Water (NRW).
if NRW is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.

IPA, schedule 8, part 1, table 4, item 4
IP Regulation, schedule 2, {able 2, item 10

 

(TIDAL WORK; WILD RIVER AREA
4.10 |s any of the proposed operational work tidal work, other than excluded work defined under the IPA?

No
CD Yes - Answer (a) and (b) below

IPA, schedule 8, part 1, table 4, item 5

IP Regulation, schedule 2, table 2, items 12, 14 and 17

IP Regulation, schedule 1, part 3, fable 4, items 4A and 5

Coastal Protection and Management Act 1995, section 104A (wild river area)

 

(COASTAL MANAGEMENT DISTRICT; WILD RIVER AREA
4.11 Is any of the operational work proposed to be carried out within a coastal management district?

() No
CI Yes

IPA, schedute 8, part 1, table 4, item 5

IP Reguiation, schedule 2, table 2, items 12 and 14

IP Regulation, schedule 1, part 3, table 4, items 4A and 5

Coastal Protection and Management Act 1995 Act 1995, section 104A (wild river area)
Wild Rivers Act 2005, section 43A

 

WATERWAY BARRIER WORKS; WILD RIVER AREA
412 ls any of the proposed operational work for constructing or raising waterway barrier works under the Fisheries Act 1994?

() No
LI Yes

Used in these records

About this file

File size
956 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Cover letter and IDAS Forms [As Published].pdf · 956 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.